Ordinance 1977-06 ORDINAN::E NO. 77-6 AN ORDINAN:E AMENDI~ SECTION 9-14-7: IMPROVEMENTS, SUBSECTION E. WATER LINES, AND SUBSECTION F. SANITARY SEWERS, OF ORDINAOCE # 71-11, TITLED "SUBDIVISION REGULATIONS,"; PROVIDIN3 FOR THE TYPE OF MATERIAL~ INSTALLATION & EMBEDDI~ REQUIREMENrS~ TESTI~ REQUIREMENTS~ LINE SIZES~.LOCATION AND DEPTH REQUIREMENTS~ REPEALING SUBSECTION E. WATER LINES, AND SUBSECTION F. SANITARY SEWERS OF EXISTIN3 ORDINAOCE WITH THIS AMENDHENT~ UPHOLDI~ VALIDITY OF REMAININ3 SECTIONS OF ORDINAN:E OR ANY SUBSEQUENT AMENDMENTS PRIOR TO THIS AMENDMENT AND OOT CHAN3ED BY THIS AMENDMENT. WHEREAS, request by various citizens engaged in developing real estate and constructing structures in the City of Wylie to amend sections of existing Ordinance # 62-8, titled "Subdivision Regulations" to allow other types of materials for use as water mains and sewer main, and WHEREAS, the engineering firm of Henningson, Durham & Richardson, Inc. of Texas engaged as consultants of the City of Wylie have recommended certain tJ~s of material for use as water mains and sewer mains and specifications of installation I of the same~ and WHEREAS, The City Council ndS revie,,'ed and considered said type$ of materials and installution specif~cations~ Now, . Therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS: That the following sections of Ordinance # 71-11, Titled "Subdivision Regulations" be amended to read as follows: Sect ion 9-14--7: IMPROVEMENTS E Water Lines. Water systems shall have a sufficient number of outlets and shall be of sufficient size to furnish adequate domestic water supply, to furnish fire protection to all lots, and to conform with the City'S Water Plan. 1. All water mains shall be of the following type of material and shall have a minimum cover of 42 inches. a.Ol Materials - Cast-iron pipe shall be Class 150 Cen- trifugal Cast Pipe and shall be furnished in l8-foot nominal laying lengths. Other standard lengths may be furnished with the approval of the City. Cast-iron pipe shall be manufactured in accordance with ANSI Manual A21.6 (AWWACI06) and ANSI Manual A21.1 (AWWAHI), latest editions. All such pipe shall bear a mark denoting approval by the Underwriters' Laboratories of Chicago, Illinois, so "that it will be acceptable to the State Fire Insurance Commission for use in fire protection mains without penalty. Pipe under these specificati ons !11(3Y be manufactured from metal having a tensile strength of 18,000 Ibs. per square inch and modulus of r"upture of 40,000 Ibs. per square inch, or 21,000 lbs. per square inch tensile strength and 45,000 lbs. Pipe shall be designed for 150 lbs. water working pressure, 42" minimum cover. The minimum wall t.hickness shall conform to thickness Class 21. All pipe joints, unless otherwise sp€cifled or required, shall be a pU~3h-on type where a single rubber gasket. is positioned in an annular recess in thE? pipe bell. The gasket and the annular recess shall be so designed and shaped that the gasket is locked in place against displacement: as the joint is assembled. The push-on pipe joint: shall be manufactured in accordance with ANSI A21.l1 (AWWA CIIl), latest editions. Fittings shall be of the mechanical joint type, Class 150 or 250, conforming to ANSI A21.10 (AWWA ClIO). As an alternate, fittings may be push-on joint type with body thickness and radii of curvature conforming to ANSI A21.10, and joints in accordance with Section 11 - 2.3 of ANSI A21.11 (AWWA elll). If in the opinion of the City, mechanical joint fittings are not suitable for use where connections are made to exist.ing mains, the connectinq fiU:ings shall be bell and spigot ~md shall be c'ILlsL) D under American Water works Associ ation Spt:'cif i c ,::tt ion Cl 00, latest editions. All cast-iron pipe and f1 tting:; shall have a coal-t.ar coating on out.side surface wi U; (1 minifflumLhickness of one (1) mil. The interIor of the pipe and fittings shall have cement mortar lininq and a ,:;(:al~:oat of bituminous material. The exterior and interior coatinqs shall be in accordance wi th p,NSI A21. 4 (AWY-JA Cl 04) and ANSI A21.6 (Awv-JA ClOG), latest editions. Other standard specifications which ;3hall be made a part of t:hese spec..ificatiomo whet!:; 2pplicable t.O t:he work herein described are as follows: ANSI .1'\21.12 (N{lWA C112) ANSI 1316.1 a. 02 Installation -'T11€ subgrade shall be accurately shaped and trimmed to receive the pipe barrel and each pipe section, when in place, shall have a uniform bearing on the sul::xJrade for the full length of the pipe barrel. Pipe shall not. be laid unless the subgrade is free of water and in a condition safisfactory to the City. Adjustments of the pipe to line and grade shall be made by scraping away or filling in with gravel, or approved selec1~ed Inuterial j and not be wedging or blocki.ng up the l>ell. The interior of the pipe shaIl be clean and joint sur- faces shall be clean and dry when the pipe is lowered into the trench. Pipe shall t'..e hammer tested for soundness before beinq lowered into the trench. EaCh pipe, fItting, and valve sfklll be lowered into the trench carefully and laid tTue to 1 ine and grade. a.03 Protect.ion of f'ipeline- Well fitted plugs or bulkheads shall be securely placed in all operlings and in the end of the line when con~3truct i on is stopped t.emporarily and at the end of eac'h day's work. It shall be the responsibility of the ceveloper to deliver to the City 2. pipeline whict! is clean throughout, its entire length. a.04 Concrete Blockin9 -- Class 2,000 concrete shall be placed, as directed by the Engineer, for blocking ~t each change in direcU.on of the pipeline, in such manner as \'lill substantially brace the pipe against_ undisturbed trench walls. Conccet.e blocking, made from Type I cement, shall have been placed four (4) days prjor to testing the pipeline as hereinafter E3pecified. Test may be made in two (2) days after cO"11pletion of blocking if Type III cement..: :is used. At all points where wet connections are made to existing 1 ines, the t:appi nq connect ion f 1, ( i ngs shall be support_ed by blocking up to the spring lIne with Class 2.000 con- crete. a.OS Hydrostatic Tcst- As soon as a continuous section of new water main has been instLllled, the developer shall proceed immediately to complete all testing and sterilizing, make all connections, and place those sections in service. The developer shall furnish all labor, materials, tools and equipment necessary to bulkhead and seal off the line for testing, fill it with water, raise the filled line to test pressure and measure the amount of leakage over the test period. The pipeline shall be tested with a hydrostatic pres- sure of not less than one hundred fifty (150) pounds per square inch maintained over a continuous period of not less than four (4) hours. After a successful cont:inuous pressure period of four (4) hours has been completed, a test for the determination of amount of leakage shall be run at the same pressure as before for a duration of two (2) hours. If the test indicates a leakage in excess of a rate equal to twenty-five (25) gallons per inch of internal pipe di amet.er per mile of pipeline per twenty-four (24) hours. the dev- eloper will be required to find and eliminate the leak. All kno~l leaks shall ~~ stopped, regardless of this test requirement. 'rOE' cost of testing, finding, and repairing the leaks and retesUng, shall be at the expen~3e of the developer. The water required t.o fill t.he lines will be furnished by the City, without charge to the developer. a.06 SterilIzation - Prior to sterilizing, each valved section of the new pipeline shall be pressure tested and flushed with clean water from the City system to remove all visible evidence of dust, soil, and fine debris which may have entered the line during construction and testing. The water required to flush and sterilize the lines, without unnecessary waste. will be furn- ished by the City, without charge to the developer. Chlorine shall be used to sterilize the pipeline by the following method: The amount of chlorine applied shall be such as to provide a dosage of not less than fifty (50) parts per million. The chlorinating material shall be introduced to the water 1 ines and distribution sys-- tern in a manner approved by the City. After a contact period of not less than twenty-four (24) hours, L.he system shall be flushed with clean water until the residual chlorine content is not greater t~han 0.2 part.s per Tni 11 ion. All valves in the lines bein(.J sterilized shall be opened and closed several times during the contact period. a.07 Standard for Polyethylene Encasement for G ray and Ductile cast Iron Pipe . .""~,_~~__~___._"..,.____..'e-'<.. 1. Scope This st.andard covers materials and installation proce- dures for polyethylene encasement to be applied to underground installations of gray and ductile cast iron pipe. 'rhis standard may also be used for poly- ethylene encasement of fittings, valves and other appurt.enancest.o gray and ductile cast iron pipe systems. 2. Definitions 2.1 PolyethLl~ne encasement. Polyethylene material, in tube or sheet for, which is used to encase gray and ductile cast iron pipe. 2.2 Sec'-!.rin9:. OVerl~ Anyone of various met.hods of holding polyethylene encasement in place at the point of overlap until backfilling operations are completed. This may be ac- complished with adhesive tape, plastic string or other suitable material. 3. Materials 3.1 Polyethylene. Polyethylene encasement materials shall be manufactured of virgin polyet.hylene possessing the characteristics shown in Table 1. 3.2 ThicJsne_es. Polyethylene material shall have a minimum nominal thickness of .008" (8 mils). The Minus Tolerance on thickness shall not exceed 10% of the nominal thickness. 3.3 .~b?_ .Sj~.?.~. 'I'he tube size -for each pipe diameter shall be as listed in Table 2. 4. Installat.ion 4.1 ~~~_!1~r~.;L. Polyethylene encasement shall be in- stalled on pipe and fittings at locations specified on the construct.ion drawings. Al- though not intended to be a completely air- and \.;ater-t;ight enclosure, the polyethylene shall prevent contact between the pipe and the surrounding backfill. 4.2 pip~. This standard includes three different methods for the installation of polyethylene encasement. Methods A and B are for use with polyethylene tubes and Method C is for use with polyethylene sheets. (See Appendix A) 4.2.1 Hethod A. Cut polyethylene t-ube to a length approximately two feet longer t.han the length of the pipe section. Slip the tube around the pipe, centering it to provide n one foot overlap on each adjacent pipe section, and bunching it accordion fashion length wise until it clears the pipe ends. Lower the pipe into the trench and make up the pipe joint with the preceding section of pipe. A shallow bell hole must be made at joints to facilitate installation of the polyethylene tube. After assembling the pipe joint, make the overlap of the polyethylene tube. Pull the bunched fX")lyethylen.e from the preceding length of pipe, slip it over the end of the new length of pipe 21lld ~3ecure in place. 'Then slip the end of the lXJlyethylene from the new pipe section over the end of the first wrap until it overlaps the joint at the end of the preceding length of pipe. Secure the overlap in place. Take up the slack width to make a snug, but not tight, fit along the barrel of the pipe, securing the fold at quarter points. Repair any rips, punctures, or other damage to the polyethylene wi th adhe- sive tape or with a short length of poly- ethylene tube cut open, wrapped around the pipe, and secured in place. Proceed with installation of the next section of pipe in the ,::;ame manner. 4.2.2. Method B. Cut polyethylene tube to a length approximately one foot shorter than the length of the pipe sect.ion. Slip the tube around the pipe, center- ing it to provide six inches of bare pipe at each end. Make polyethylene snug, but not tight; secure ends as described in 4.2.1 Before making up a joint, slip a three- foot longth of polyethylene tube over the end of the preceding pipe section, bunching It accordion fashion lengthwise. After cornplet.ing the joint, pull the three-foot length of polyethylene over the joint, overlapping the polyethylene previously installed on each adjacent section of pipe by at least one foot~ make snug and secure each end as described in 4.2.1 Repair. any rips, punctures, or other damage to the polyethylene as described in 4.2.1. Proceed with installation of the next section of pipe in the same manner. 4.2.3. .Metho~-L~ Flat sheet polyethylene shall have a minimum width twice the flat tube width shown in Table 2. Cut polyethylene sheet to a length ap- proximately two feet longer than the length of pipe section. Center the cut length to provide a one-foot over- lap on each adjacent pipe section, bunch- ing it until it clears the pipe ends. Wrap the polyethylene around the pipe so that it overlap~ circumferentially over the top qlladrant of the pipe. Place a six-inch pength of adhesive tape at approximately three-foot intervals along the pipe length, securing the cut edge of polyethylene sheet. Lower the vJrapped pipe into the trench and make up the pipe joint wj..th the preceding :eJection of pipe. A shallow bell hole must be made at joints to facili tate int,tallation of the poly- ethylene. After completing the joint, make the overlap as described in 4.2.1. Repair any rips, punctures, or other damage to the polyet.hylene as described in 4.2.1. Proceed with installation of the next~3ection of pipe in the same manner. 4.3 Pipe-Shaped Appu~~enances. Bends, reducers, offsets and other pipe-shaped appurtenances ahall be covered with polyethylene in the same manner as the pipe. 4.4 Odd-shaped Appurte~an~es. Valves, tees, crosses and other odd-shaped pieces which cannot pract- ically be wrapped in a tube, shall be wrapped wi th a flat sheet or split length of' polyethy- lene tube. The sheet shall be passed under the appurtenance and brought up around the body. Se~ns shall be made by bringing the edges to- gether, folding over twice, and taping down. Slack WJ.dth and overlaps at joints shall be handled as descriLed in 4.2.1. Tape polye- tylene securely in place at valve stem and other penetrations. 4.5 Openj.J1.9s len Ert~_a.E~!!l('o_DL. Openings for branches, service taps, blow-off's, air valves, and similar appurtenances shall be made by making an X- shaped cut in the polyetheylene and temporarily folding the film back. After the appurtenance 4.6. 4.7. is installed, tape the ;lck securely to the appurtenance and repair the cut, as well as any other damaged areas in the polyethylene with tape. Junctio~s Between Wrapped and Unwr~~9_Rj~ Where polyethylene wrapped pipe joins a pipe which is not wrapped, extend the polyethylene tube to cover the unwrapped pipe a distance of at least two feet. Secure the end with cir- cumferential turns of tape. Backfill for Polyethylene Wrapped~_~. Backfill material shall be the same as specified for pipe without polyethylene wrapping. Special care shall be taken to prevent damage to the polye- thylene wrapping when placing backfill. Back- fill material shall he free from cinders, refuse, boulders, rocks, stones or other material that could damage polyethylene. In general, backfill- ing practice should be in accordance with AWWA Standare C-600-64, or latest revision thereof. :rab1e I Raw Material Used to Manufactu re Polyethylene Enca~ement Material Type, Class, Grade, other Characteristics..... T y'pe. " . . . . . ... .. . . . . . . . . .. . . . . Class... . .. .. .. .. ... .. .. . .. Grade. . . . . .. . . . . . . . . . . . . .. . . Flow Rate (formerly Me 1 t I nd ex) . . . . . . . . . . . . . Dielectric Strength....... Pot'iet,l:!.Y.lene Enca:H'ment Material Tensile strength.......... Elongation................ Dielectric Strength....... In ~ccordance with ASTM Specification D-1248-68 or latest revision thereof. I A. Natural Color OR C. Black E-l 0.4 maximum Volume resistivity, minimum ohm-ern] = 1015 1200 ps~ minimum 300% minimum 800 volts per mil thickness m i rnmum Table 2 Nominal Pipe Diameter . (Inches) Recommended Polyethylene Flat Tube width ~Inches) * 3 14 4 16 6 20 8 24 10 27 12 30 14 34 l6 37 18 41 20 45 24 54 30 67 36 81 42 95 48 108 54 121 * For flat sheet polyethylene, see pd~~gr~ph 4.2.3. - ..~- /"--- ~ - '- - ;;--'r;:"\-- \._: (r, \ .,~:} .0: ".:,.. ;:::'_~ ;.t; '_ ..- OVERLAP --- r~--1 . -....::;./ .- It -"- --~ _ - I II jf;)' .' I II - "":;':.' \ - ~}?~ \-_.\\ -=;. ;:-:-/ .._--<~~---- ------- ~~- ~~, METHOD A OVERLAP~ rt-=---H ,~ - ____ . ~_ _ '. __ L_,,- \ _ --,,, \ I J I :--:.:.-:.::..~ ; f ----'-~ II ~~- -,..., -' METHOD B OVERLAP l_ /' 1--~--1 ~f ~-:7_---=~~1\ _____ -'.. . - I ---- ----- -- ..------.----- 1.1 L c'. . __ "--..l j ~.:~ -~ -- ~- - <_. -.- -.. ,,-: ~~ .::-<~-"- -----~::::.:.:::::J .~ ".,.,.---. \ ~ . .-<\\. \ - :.' -H-I\\ - I -J-._._~.... "'r I I ----- . ..,.... I I ~~ -.-.o.~~' u."-~'~_ " ~ METHOD C b.O! Materials - Ductile iron pipe shall be designed in accordance with A.S.A. Specification A21.50--1965, and shall be centrifugally cast and furnished in IS-foot nominal laying lengths. The pipe shall be manufactured, wi th a push-on type joint. This joint shall be of the type which pro- vides a recession in the bell for the employment of a single rubber gasket to be placed before the in- sertion of the succeeding spigot. The joints shall be made in strict accordance with the manufacturer's specifications. The pipe shall be designed for 8 feet of cover. The minimum wall thickness shall conform to thickness Class 1. 'nle fittings shall be of the mechanical joint type and may be of either cast iron' or ductile iron, manufactured in accordance with ASA Specification A21.10 (AWWA ClIO) "American Standard for Cast-Iron Fittings, 2-inch Through 48-inch, For Water and Ot.her Liquids, II of latest revision. If, in the opinion of the City, mechanical joint fittings are not suitable for use where connections are made to existing mains, the connecting fitt.ings shall be bell and spiqot. All ductile iron pipe and fittings shall have a bit- uminous coating on the outside, of either coal-tar or asphalt base, approximately I mil thick. TI1e interior of the pipe and fittings shall have a cement-mortar lining with a seal coat of bituminous material or any other seal coatings as may be approved by the City. The linings and seal coating shall be in accordance with the A.S.A. Specification A21.4, of latest revision. b.02 Installation- Same as a.02 b.03 Protection of Pipe Line- Same as a.03 b.04 ConcretellJos,;ki!ill - Same as a.04 b.OS Hydrostatic Test - Same as a.05 b.06 Sterilization - Same as a.06 b.07 Standard for }'olyethylene encasement for Gray and Ductile Cast Iron Pipe - Same as a.07 c.Ol Scope - Requirements for unplasticized polyvinly choloride PVC pipe with integral thickened wall bells for municipal water main di.stribution system's. The pressure classifications of 1.50 psi (Minimum thickness DR 18)'1nd 200 psi (Minimum thickness DR 14) refer t.O the maximum hydrost:atic pressure to which the pipe will be subject in normal operation. Pipe will be minimum Class 150 unless indicated otherwise on plans. c.02 PI luct - 'rho<; P1P(~ ::~hall rW'h Jr exceed requirements of Ah'WA C-900-.7', !)'v'I' plpe. with ClIfjt iron outBide djrnen:...:lun:; dfHi vll t Ii Uu\.!,..[ H1iHJ Joints. PVC water pip(~ shall be 1 :J ted by 1 Jnd(~rwr it ers Labora tor ies and appn,>vf:ld fat Iwe ,n C) I i ('oJ LInd t oWn~.; of Texas by the State Board of In:;urdnc(:'. The rigid PVC pipe shall bear the se,'iJ. of approvdl (or "N::F" mark) of the National Sani t at ion FCunJ;lt- ion 'I'esti.ng Laooratory for potable water Plt.:1c. t::-rIVl:310:1c3 must Le made for contract ion dnd exp.)'ln~' l~)fl ::it each joint wi th a rubber ring, and an integr...l1 thickened 'bell as part of each joint. PIpe and fiU...inq:; !fii_:::;t ll€ assembled with a non-toxic libricant. Layinq lengUls shall be 20 feet + 1 inch. P.ipe 51;<311 L,e ,]c)hns-Manville RIN3-- TITE PVC pipe or approved equal. Pipe shall be ma.de in nonlinal :;izes of 4, 6, 8, 10, and 12 inch!'s, and shall meet the dimension ratios (DR's) and physical dilnen~310ns' as shown in Table I. Service connections shall be made by direct tapping, saddles, or tapped couplinqs. Direct tapping will be allowed only on 6 inch and larger pipe. Fittings shall be mechanical joint or ruhber ring slip joint cast iron fittings. On direct taps, teflon tape shall be used on corporat ion :; top threads. c.03 Materials -- Pipe ~;h.J.ll }.;e made from N:3F approved Class 12454-A or n f'V:~ Con;pound c:onforming to ASTM resin specification 01784. c.04 Inst~llatian ~1) b1i,io/13oCkfill Of ~L Bet Lighffy Compacted (B5%)~',.' Select MolerlOl Or . FI'le Granular Mo1eri'JI '_, ~_.--.. -------- ~-T ,: "'.- ~1\~ ," i..."'t Compact C, rushed OJ,i;; :~ "1J (/,'""" ,')')~, ' Stone, Sfandard ~:~ ~ .: _..~<:,:: )lJ:.'- Gradation, ___ -~_:-:.:~= );~:>t:"':~';~,1 ; u, 1 '---~~~~;:~T} co; . I 1-.", ~._._IJ' u") i S i 8d ::::-' ~ 1----- CL.ASS C Embedment L F. I 5 , EMBEDME:NT DETAI L FUE 1'"/e WATER MAr NS c.OS Proteetion of I'j~,.!llnt' ~;urn{! <19 u. OJ c.06 Concrete Blocking - Srul~ a~ a.04 c.07 Hydrostat.ic Test -. Same as a.05 c.oa Sterilization - Same as u.06 c.09 Gate Valve Thrust Blocking as per detail. All gate valves to be installed on P.V.C. pipe shall be blocked and tied in accordance wi th the typical detail included in these plans and specifications. '/4'1. I Y1.' 6N.Y. mAP ~ HO weAn ~ur . "1'.-,X' I'l.. A. b. " q--: 'iL~' . TYPICAL ANCHOR EOL: 4 STRAP DETAI L SURFACE. / ARE.A TYPICAL Tl-tRU5T BLOCK DETAIL fOR GATE VALVES IN'5TALLED ON ~\/.C. PIPE -- 411 (OtJ Bit 1011 12.11 GEtJERAL DATA fOR BLOCKINGl GATE VALVES ON PVc. PIPE_J MIN. SURFACE AREA CONe. BLOC~ AGAlf'-J5T UI-JOISTURCED EARTH (S.f) ------.-----.-.-.. GATE VALVE. 1.00 2.:'0 4.00 G.OO C7J.OO PIPE 51 'lE. -- c.10 Trace Win~ ReC'{uirement for Non-rnet<111ic Pipe. See Detailz ::.x?O ' r---- ---- -1 I ---J {- I B.V. .W '7 .. Q Y-J.M. ,I h ~ V\lM. - ______J l________ -1 ~-- - - _ -- -_ J L_ ~IK~~g_~1EI:_ r t... PRO P L/\JA. T E:. e /v1J.\1 N r<ov<J. 2. PLAN . /'6~0U~.JD '* . .l r .. . '" ~ ..;;r '-" -. -",'" ___..... .",. ...,......- .... . "WI!Ir FiItI;""lf11!!if Cl//~ f. ,r-~ ~/~'::O/.::i,::j1 .-~/,..-..J;T~. 77'!,-. ..... """'1J' 0 I R ,...., ., ,..., f'" """' 'J' I V Iii c3A. Slr-JGLE:- I STRANO PLASTIC l : COA-rED COPFE:Q Y'J1l?E: llL,'- f'l?O P ~(-JA T E: K fd~\ I t.J -{: - -- - --- -,_. ) ~-=~~". .~_..- .-.===-=- "-~-=-'~'=-:"~" -_.- PROFILE _l.t... _, 1'._ Construction Detail, 14 Gauge Single Stran Plastic Coated Coppe r Trace Wire. The Trace Wire shall be installed adjacent ..lnd parallel to all non- metallic pipe inst.llled. "._.._,'_"",.__".....,'""~_......."..,.~_.,_..,._.~~_~~,~"'_'''''__,___~_4-""""'~" 2. Gate Veil ve a. General - Gate va] vet, confor rn to AlTIer ican Water Works Association Specification C500 (formerly 7F.l), latest edition. Valves sh311 be designed for a minimum water working pres lire of 150 pounds per square inch. Gat.e valves shall have ~ clear waterway equal to the full nominal diameter of the valve and shall be opened by turning I.:) the left!._ Euch v<llve shall have the maker's initials, pressure rating, and year in which manufactured cast in the body. Unless otherwise specified by the City, all gate valves shall be iron body, bronze mounted, double disc, parallel seat, non-rising stem, internal wedging type with "0" ring seals and mechanical joint ends and shall be nut operated. Gate valves attached to flanged outlets shall have combination flanged und mechanical joint ends. b. Flanges - Flanges shall be cast solid and faced accurately at right angles to the axis of the casting. Dimensions and drilling of flanges shall be in accordance with the American Standards Association for a working pressure of l25 pounds per square inch. Special drilling shall be provided where necessary. c. Valve Boxes - ValvE~s buried in the ground shall be pro- vided wi th CiJst-j_ron valve boxe~; of proper dimensions to fit over the valve bonnets and to extend to such elevation at or slightly above the finished ground line as directed by the City. Tops shall be complete with covers and shall be adjustable. Valve boxes shall be set vertical and concentric wi tJl the vulve E3tern. Any valve box which has so moved from its original position as to prevent the application of the valve key shall be satisfactorily re- set by the developt::r at his own expense. A concrete pad of the dimensions shown on the "Standard Wat.er De- t_ails" sheet shall be poured around all valve boxes, un- less otherwise directed by t:he City. 3. Fire Hydrant a. General - In general, all fire hydrants shall conform strictly to AWWA Standard Specifications for Fire Hydrants for Ordinary Water Works Service, C502 latest edition, except for changes or additions specifically outlined as follows: 1~e operating nut shall be designed to prevent seepage of rain or sleet and the accumulation of dust around the revolvlng nut. TIle hydrant top or bonnet shall be free draining and of a type that will maint:ain the operating mechanism in readiness to use under freezing conditions. It shall be so (1esiqniJ.ted as to make tampering diffi- cult and shall be provided with convenient means to afford lubrication to insure cuse of operat_ion and the prevent:ion of wear cmc1 corrosion. The body of the hydrant shall De equiped with a break- able flange, or breakable cast-iron flange bolts, just arx"")ve the qrade 1 ine. All hydrants shall r.>8 of such design as will permit their extension without excavating in case of future grade changes. The complete hydrant shall be of such design that. when the hydrant barrel is broken through traffic collision, it may be replaced without excavating or breaking the pavement. 1~e barrel and operating mechanism shall be so designed that in case of accident, damage or breaking of the hydrant above or near the grade level, the main valve will remain reasonably tight. against leakage or flooding. Changes in shape or size of the waterway shall be accomplished by means of easy curves. The junctions of hose or pumper nozzles with the barrel shall be rounded to ample radii. Exclusive of the main valve opening, the net area of the waterway of the barrel and foot piece of the smallest part shall be not less than 150 percent of that. of the net opening of the main valve. Hydrants shall be provided with an automatic and positively operating, non-corrodible drain or drip valve so as to drain the hydrant completely when the main valve is shut. A drain valve operating by springs or gravity is not acceptable. Operating stems whose threads are not located in the barrell or waterway shall be made of genuine wrought iron or steel and shall be bronze bushed where passing throuqh the stuffing box. Operating threads must be sealed against contact with the water at all times re- gardless of open or closed position of main valve. All operating stems shall be coupled opposite the break flange with a breakable coupling or coupled in such a way as to part without breaking. Unless otherwise specified by the City, hydrants shall be furnished with "0" ring seals. The hydrant head shall be constructed so that it may be rotated to face the nozzles in any desired direc- tion. The developer shall rotate the fire hydrant in such a direction to best serve the City. Hydrant:s closing with t.he pressure must have a bronze cap nut to seal the bottom end of stem threads against contact with water. Supplementary details are as follows: I. The type of shut-off may be compression or gate. 2. Each hvdrant shall have a net valve opening of not 4less than five (5) inches. The inlet: shall be mechanical joint for 6-inch cast- iron pipe. 3. All hydrzmts shall be equipped wi th two (2) hose nozzles and one (1) steamer nozzel and shall conform to the standards now in use by the City. 4. The bury lengUl shull be for a minimum 42" bury. 5. Harnessing lugs shall not be provided unless specified in order. 6. The operating nut shall conform to the stand- ards nm.... in use by the City. The hydrant valve shall open by turning to the Jeft. If required by the City, the developer shall furnish drawings with complete detailed dimensions of the hydrant. proposed for this project. b. Construction Method - Fire hydrants shall be placed at all locations shown in the plans. Each hydrant shall be set upon a slab of stone or concrete not less than four (4") inches thick and not less than one (I) square foot of surface area. Where solid rock exists in the bottom of the trench and sam~~ is excavated to the proper depth to form a foundation for the hydrant, the slab of stone or concrete above specified may be omitted. The hydrant shc,11c-e set perpendicular, and t:o t.he proper depth, and shall be carefully and substantially blocked against firm trench walls using Class 2,000 concrete as herein specified. There shall be pLlced <:lround the base of the hydrant not less than seven (7) cubic feet of sound broken stone or clean gravel, or other suitable material, t.o pro- vide reservoir capacity so that the hydrant will completely drain when closed. c. Fire hydrants shall be placed on block corners or near the center of the block in such a manner as to put all of every lot within a radius of 500 feet (preferably 400 feet) of a fire hydrant. (This 500 feet is the hose laying along streets from fire hydrant by Fire Departmen t . ) d. All fire hydrants shall have a valve opening of not less than 5 inches and shall be placed on mains of not less than 6 inches in diameter. Six-inch valves shall be placed on all fire hydrant leads. 4. Railroad and Highvlay Cros[;i ngs 4.01 Materials - The carrier pipe shall be cast--iron, ductile-iron, or polyvinyl chloride and shall conform to the re- quirements of the applicable sections included in these Technical Specifications. The encasement pipe shall be corrugat~ed galvanized metal pipe of t'he dj <Jmeter and gauge shown on the plans. Corrugated metal pipe shall meet the re- quirements of Federal Specifications QQ-C-806 for "Culverts, Iron or Steel," and Amendment 2 there- of, Type I, or AASHO Standard Specifications, Designation ./1-136-42, for "Corrugated Metal Culvert Pipe." Any other materials t~hat_ may be allowed for const_ruct- ing the carrier pipe and the encasement pipe or any modifications to the materials to be furnished in this section shall be approved by the City. '.02: Constuction fv1ethods - The encasement pipe shall be installed by boring and jacking, or by open cut method as indicated on the plans. Regardless of the method used, the encasement pipe shall be in- stalled with even bearing throughout i t_s length, and all voids between the encasement: pipe and earth or rock shall be filled with stabilized pea gravel or grout. The minimum length of encasement pipe shall be determined as indicated on the reviewal of plan by the City. The encasement pipe shall be t.ightly jointed to prevent leakage. The ends of the encasement pipe shall be plugged wi t_h a clay core to prevent entrance of excessive ground water. \'lhere it is specified that~ the cast-iron carrier pipe for sanitary sewers or water mains under streets and highways is to be inst_alled by boring or jacking, all voids between the outslde of the casto-iron car- rier pipe and the bored hole shall "be filled with sand or gravel. No trench ::1hall be carried closer than ten (10) feet of all pavement edges. No dirt from trench excavation shall be piled on roadway shoulders. All trench backfill shall be mechanically tamped to the Silil1e density as surrounding ground. Before completion of this proposed work, all roadway shoulders, slopes, ditches and berms shall be restored to their original condition. The CONTRACTOR E..,hall noti fy the Rai lroad Company or Highway Department of his construction schedule not less than five (5) days prior to commencing the work wi thin the right--of -way. The CON'I'RAC'l'OR shall conform to the requirements of the Railroad Company or Highway Department as to details of construction methods and time of construction. Ii' . Sani tary Sewers Sanitary Sewer Facilities shall be provided to adequately service the subdivision and conform with the City Sewer Plan. 1. All sewer pipe shall be of the fallowing: a.Ol Material - Clay pipe for sanitary sewers shall be either standard strength, glazed or unglazed, conforming to current A.S.T.M. Destignation C700 (Latest Revision) Or extra strength, glazed or unglazed, conforming to current A.S.T.M. Destignation C700 (Latest Revision), All clay pipe twelve (12~ inches is diameter and smaller shall be extra strength. All clay pipe eight (8) inches in diameter and larger shall be furnished in five (5) foot nominal laying lengt:hs, except for specials and fittings. ..Toint, material for clay pipe shall conform to the current requirements of A.S.T.M. Designation C425. a.02 Clay Pipe Installation - Pipe shall be installed in com-- pliance with current A.S.T.M. Designation C12. Pipe shall. be laid on prepared subgrade or embedments wit.h bell holes excavated. The laying of pipes :3hall commence at t_he lowest point. so that the spigot ends point. in the direction of 1 flo"!. All pipes shall be laid wi t11 ends abbating and true to line and grade. The pipe'S shall be matched so that when laid, they will form a sewer with a smooth, uniform invert. a.03 :embedment and Encasement 'There shall be five classes of embedment: Class 1. - Earth Embedment Class 2 - Gravel Embedment Class 3 -. Concrete Embedment Class 4 - Concrete Embedment Class 5 - Concrete Encasement (See Detail at end of Section F'. Sanitary Sewers P art I.) The class of embedment will be recommended by the City Engineering firm upon reviewal of plans before const:ruction of lines. I. _S'=-@.~~~ I fa .L CIa ~l?__~_~@J2~_9.rJl.~..D_t: Gravel for Class 2 Embedm(:,nt: shall consist of washed or screened gravel, ~-inch to ~-inch in slze, or pea gravel that is retained on liB-inch mesh but passes the S/8-inch mesh. Washed, screened or pea gravel shall be used in either earth or rock trench, where Class 2 Embedment is designated. 2. Concrete Ernbed_l!!en_.t_....:~lJd Encas~meIl.t Concrete embedment and enCi.1sement shall have a minimum cornpress~ve strength of 2,000 pounds per square inch at 28 days. Dry mix will not be permitted. The con- crete cushion portion of the embedment or encasement will be mixed moist or damp to give a slump or not more than one (1) inch. Concrete for the sides and top, if specified, shall be mixed to obtain' a slump of not less thah one (I) inch nor more than three (3) inches. After pipe joints are completed, the voids at the joints shall be filled with concrete, and the embedment shall be brought up to proper grade. Where concrete is placed over or along the pipe, it shall be placed in such manner as not to damage or injure the joints or dis- place the pipe. A cleavage line between the base concrete and the side embedment concrete will not be tolerated. Backfilling shall be done in a careful manner and at such time, after concrete embedment or encasement has been placed, as not to damage the concrete in any way. 3. Granular Material Granular material shall be hand placed to a depth of not less than twelve (12) inches over the top of the pipe, where designated on the plans. Granular material shall consist preferably of a free flowing material like sand or mixed sand and gravel, free from lumps large stone, clay and organic materials. Granular material shall also include rock cuttings from a ditch- ing machine (preferably wheel-type), provided that the largest chips shall have at least an average dimension in one place less than one-half inch (~"). Only if approved by the enigneer, good, sound eart:h may be used in lieu of granular material for backfill over the pipe. Good, sound earth is defined as gravel, sand, sandy loam or loam, free from excessive clay. If, when the material is damp and pressed into a tight ball in the hand and fingers are relaxed_ the material crumbles freely, the material will be considered as not having an excessive clay content. Good, sound earth will be allowed only if sand or rock cuttings are not present on the project. a.04 Inf il tration Test - TI1e total seepage and infiltration of ground water as determined by test shall in no case exceed 250 gallons per 24 hours per inch of diameter per mile of pipe. An infiltration test or tests shall be made on all sections of all sewer construction before placing the same in service and before any connections are made to other sewers, and if the quant,ity of infil- tration into the sewer or sewers is in excess of the maximum quantity as specified abo\'e, the joints shall be repaired or the sewer relaid if necessary, or other remedial construction shall be performed by and at the expense of the Developer, in order to reduce the quantity of ground water infiltration to an amount within limits as specified. In the making of all tests the Developer shall furnish the required equipment and labor and do the necessary pmnping under the direction of the Engineer and tests may be repeat_ed until each sewer individually meets the specifications as to quantity of infiltration as set out above. The City will not furnish water and the necessary connections to mains or fire hydrants~ however, if water is not. readily available, the Developer shall haul or pump necessary water to make the test. Test can be made by one of five methods as directed by the Engineer, except that all sections placed by boring, jacking or tunnelling shall be subjected to an exfiltration toe st. 1. Usinq Existinq_!i_!gl~~.r~Q_unsLv-l~.!_~E v.."'here the natural qrounc3 wdl er, after well points ~re removed, is above the top of the pipe for a section, the flowing of water in the pipe can be measured and tbe rate of seepage and infllt.ration measured for the section so submerged. 'rhree readings or measurements will be taken over a period of one (1) rninute and the average will be uf:~ed t:o determine the rate of infiltra- tion. 2. FloodinsL"~ Spe.ci!_:L~L0~S-:.!:1.0l} Backfill will be brought up to at least a foot over pipe to be tested for a distance of 200 feet or more. More cover may be required on larger pipest.o prevent the pipe from floating out of grade. DcU11S or dikes are placed tightly around pipe at either end and the ditch filled with water t.O an average dept. of four (4) feet over the pipe. Flow at the lower end is measured for the section so submerged. 'Three readings or measure- mentswill be taken over a ~riod of one (l) minute and the average w.lll be uE3ed to determine the rate of infilt.ration. "3. Exfi 1 trdt:ion A section of pipe below a rnanhole is bulkheaded at either end with a 6" pipe is set in d vertical position. A 2" vent: pipc: is inserted in lower encj and extended up-- ward four (4) feet. The 6" pipe is filled with water, fill.ing the sewer line until <111 air iE) forced out through the ven t tube, '1-Then the W<lter levels are level in t:he 2" ane] 6" pipe~3, mea~.;ure the drop in t"he 6" due to exfiltration over a specific time and cal- culate the lo,,;s of water due to exfiltration. Reduce this illnount by twenty-five percent (25%) to obtain equivalent infiltration. Conditions encountered in construction may vary this procedure slightly, but essentially this method shall be used. 4. Air Testinq Prior to air testing the pipe shall be visually inspected to determine collapsed or crushed pipe. After visual inspection the section to be tested shall be cleaned and flushed. After flushing, all pipe outlets in the test section shall be plugged and each plug shall be suitably and securely braced. (1) Constant Pressure: Add air slowly until the pressure in the test section reaches 3.0 pounds per > square inch gauge. Maintain the 3.0 psig pressure until the air in the system reaches the temperature of the pipe. (Approximately two minutes.) The volume of air leaked from the test section shall be measured by a rotameter placed in the system. The maximum rate of air loss for acceptance shall not exceed 0.003 cubic feet per minute per square foot of interior pipe surface, or 2.0 c.f.m. minimum when subjected to a constant pressure of 3.0 psig. For each foot of water table elevation above the invert of the pipe under test, the allowable loss shall be reduced six percent. (2) Time Pressure Drop: Add air slowly to the portion of the pipe under test until the internal air pressure is raised to 4.0 pounds per square inch gauge. Maintain the internal pressure at 4.0 psig, by adding air until the air temperature inside the pipe under test has stabilized. (Approximately two minutes.) At the end of the two minute period disconnect the air supply. When pressure decreases to 3.5 psig, start stop watch. Determine the time in seconds that is required for the internal air pressure to reach 2.5 psig. The amount of air loss shall then be determined from the pipe size, length of test section and time in seands and compared with the time required by specification as shown in table at back of this section. (3) Safety Provisions: Plugs used to close the sewer pipe for either air or exfiltration testing must be securely braced to prevent the unintentional release of a plug which can become a high velcity projectile. Gages, air piping manifilds and valves shall be located at the top of the ground. No one shall be permitted to enter a manhole where a plugged pipe is under pressure. (4) Test Equipment: The test equipment used with either method of air pressure testing shall be certified as satisfactory by the Engineer at the beginning of a project. The inspector may at any time require a cal- ibration check of the instrumentation used. (5) The Contractor shall perform the air testing in strict accordance with the manufacturer's instru- ctions for the equipment used. In no case will air testing be allowed for the 42-inch diameter pipe. b.01 Polyvin1y Chloride pipe for sanitary sewers shall have a minimum thickness SDR of 35. Joints for the piping system shall be sealed with a rubber ring gasket, and shall be of a composition and texture which is resistant to common ingredients of sewage, industrial wastes including oils and ground water, and which will endure permanently under the con- ditions likely to be imposed by this use. The joint, when assembled, must be able to withstand an hydr pressure internally of at least 10 psi. b.02 Pipe Installation and Field Testing - Pipe shall be installed in full compliance with the Recommended Practice for "Underground Installation of Flexible Thermoplastic Sewer Pipe," ASTM Designation D 2321 The bedding and haunching material shall be Class II - 1/4 to 3/4 inch graded angular stone as per ASTM Desig- nation D 2321-72. In addition to the construction and testing procedures outlined in other sections of the specifications, the Developer shall be required to install the pipe in such a manner so that the deflection of the pipe shall not exceed 5% and the material sur- rounding the pipe shall be compacted to not less than 90% Proctor. The area requiring compaction shall in- clude the bed and side fill material and also the material placed above the pipe for a distance of 12- inches over the top of the pipe. The City may require up to 10 random compaction tests to be completed by an approved independent laboratory. If any of these tests indicate that the material has not been compacted to the required density, the Developer shall recompact said material. The City shall then have the right to require additional compaction tests to insure that this or other material is compacted to the proper density. b.03 Final Acceptance - Maximum deflection of the pipeline under load shall be limited to 5% of the internal pipe diameter. Pipe exceeding this deflection shall be considered to have reached the limit of their service- ability. Prior to expiration of performance bond, the pipeline shall be measured for deflection by an inde- pendent testing laboratory acceptable to the City, at the expense of the Developer. All pipe exceeding 5% deflection, and all other related work and material, shall be replaced by the developer. Testing shall be conducted by means of passing a mandril, as approved by the City, from one end of the line to the other. If the testing procedures as listed above, indicate that the pipe deflection exceeds 5%, that portion will be considered as a failure, and developer will be required to replace pipe at developers expense. Infj 1 tration and (~xfi1 trdt ion t efJt.s uS described in paragraph a.04, section on Clay Pipe Sanitary Sewer, shall also apply to the Polyvi nly Cllloride Sewer Pipe. b.03 Embedment Detail eC. CAf(E FULLY COJt1f'ACrEO eACt::.'" L.L ~ CDMPAC.TCD RAIJULAR. l;1ATERlAL COMPACTED TA8LE OF QUANT/ll E.5 OF GRAYEL IN CUBIC YAROS PER. 100 L.r=:-, B.~SED ON AVERAGE TRE:NC.l-\ WIOT~ - -- l~ SlOE I OUTS I DE. T1\EJJCH CLASS ~ DIAMETER DIAMETER WI DTH EMeEPlVIENT 0,. PIPE: KIND OF- PI PE OPPlPE f5 IH lloIC t4 ES t~ lNCiiES 6RM-J 11 LA R * d 5c N't1 N. MA~. MATE R..lAL 6" POQ'VI~YL CHLORIDE <0..,0 · 24'1 U" Z.7~ PIPE - f/ P<iLY"I~L CHLORIDE " OS' 24" 'If>'' 3.4tO rlF€: - -- lcf POLYVIN'<\... CHLORlCC 1I.IOd t4.' 'l.e/ 4. 0c04 PIPe It' Po<-YVlIIYL CliLmlDC ] 13.20. 24" u" 4.G2.S PIPE - ~ 6RA~ULA~ MATE~It.L. AS reF. A. 'S. CE:. J,1ANUAL t-Jo.?l " ! ~.~ ~ ~~ 'I 'ti~ ~ ~ ,~'lt ~ ~~ ~ ~ ~ ~ .~I , ~ ~ ~ ~ ~i ~ ~ ~. \(I r-:lW.f I ~: .~i ~' l(! -~ i{/t.t;p 't{~~ O~ l I ... 11. ~ Sl 'i)-~~ ~ ~ ~ ~ ~ ~~ ~ ~~~ I>~ ~~ ~ ~~ ~~ ~~ (1 ~ ~t ~ ~~ 'Y\~ ~ ..~ l:l~ ~ ~ ~ ~ ~ ~ ~ ~ .... ::.. "l: ~ :-l: ~ ~ ~ ,. Vi " " I~ ~~ ~ ~ ~ :": ~~ ~ ~ ~ ~~ ~ ~~ ~~ ~ ~ It)~ ~ ,~ ~ ~ ~ ~ (i"-' h; ~~ ~ " '" '" ~~ ~ ~. . . . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ <)~ ~~ ~::: ~ ~ .\~ ~ ~ ~ "4 ~~~~...~~~ ~ ~ ~ \\.j ~ "'I ()~ "'~ ~l\: ~ "-~~~~~ ~~..... I~ ~~it\.j \\"'~~~~~ ~ ::,~.~C)"'lf\~~~~~ I "I\.. <:. ~ ~:>- ~ ~ <:j"'~ ,~ ~~ ~ ~ 9: '-.~ it t)~ ~ ~~ R ~~ '< ~ ~ ~~ ~~ ~~ ~~ ~~ tt)~ ~~ ~~ ~~ \1 ~] ,~\{ t--. _ \) ~ ~ ~I 'J ~ ,< ~ )'" '" ~ ~ /~~~",~t'\ /,,\~~~~~ ~~~~ ~!Q _ ~o;.-tT i -- ~ ~ ~/~ ./JPf//1 t.//W.j;,-' i<;;"-;S -+- j- 'li I \ " ~'\ ~ 1:: ~~ ~ " \5~ O~X' ~ 'I I~ ~I~I~ ~I~I~~ ~i~ 'It ~ ~ ~ ~~ ~ 4.,~ 4. ~ ~ ~~ \i~ v; " :'l: ~ \J ~ ~ \j ~ ij ~ ~ ~ ~ I\') f) f'i S:;" ' . '" " ~ ~ ~ ~ l\, I::l ~ ~ ~ ~ &) ~ I() I() I() \() ~ c) !'i " ~ ~~~lt~~~ ~~~~""''''~ I.:S -- ~'~ ~~ ~ ~I~ ~ ~ ~~2tIl:Q~Q:~~ \(\(C\:\\,():~~ ~ ~ ~ ~ ~ ~ ~I~ ot... ~ ~ ~ ~ ~ ~ ~~~~~4.;4.J~' I vI 'J) \ti \1\ ~ I. 'l:1.... ~ ... .... :... :.., "- ~ ~ " ~ '1: "l: " ~ \jl~ iJ ~ iJ ~ ~ \j '!J~ '-'> c:s~~~ -...;~::.-.;~ . . . . ~~Cl::s;ll~ '>;) ~ s. ~ ~:...~. 0: ~ ::::: ' ," .... '" .~ - ~C:j~~ I MINIMUM TllVIE IN SECONDS FOR ACCEPTANCE Length or Test Secbon 'in Feet 4 6 25 50 75 100 125 150 175 200 225 250 275 300 350 400 450 J' 500. 550 600 650 . 4 i 10 I 9' 20 131 30 18 40 22 50 18 35 53 8 lO Pipe Diameter in Inches 12 15 40 t . 62 l8 21 I 24 1211158 71 110 158 248 356 485 88 138 198 309 446 5 5 28 55 83 89 79 124 178 243 317 119 186 267 364 475 26 59 106 165 238 371 510 31 69 35 ' 79 , 40 I 89 44\99 48 i 109 53\119 62 '139 70 158 79 170 88 97 i 1061 . i 113 !1 0 123 141 158 176 194 211 227 227 193 277 220 317 248 340 T 275 233 . I l , I . 2g3 J 340 425 510 : \ i I I 1 i 5951 27 I ~o 33 36 ~( .:>. 200 - 248 . 299 356 ~11 40l 495 599 713 83'4 601 743 898 162"0' --110: 851 9~5 639 755 6301 680: II ! I i I I I ~ I I i ! I I \ \ I \ \ I ! 1'\ III 765: 851 I 935 h020 llt ,. 2. A minimum of 8~inch sewer pipe shall be specified, except that 6-inch lines will be acceptable only in the locations where so approved by the City. 3. Wherever possible, sewers shall bo located in the alleys or easements and shall be 5 feet to 6~ feet deep to invert. 9-14-10: (B) PENALTY Any person, firm or corporation who shall violate any of the provisions of this Ordinance or who shall fail to comply with any provision hereof shall be guilty of a misdemeanor and, upon conviction, shall be subject to a fine not to exceed Two Hundred Dollars ($200.00), and each day that such violation continues shall constitute a separate offense and shall be punishable accordingly. (C) ALL CONFLICTIN3 ORDINANCES REPEALED. (D) SEVERABILITY If any section or part of any section, paragraph or clause of this Ordinance is declared invalid or un- constitutionsl for any reason, such declaration shall not be held to invalidate or impair the validity, force or effect of any other section or sections, part of section, paragraph or clause of this Ordinance. (E) EFFECTIVE DATE This Ordinance shall become effective immediately upon its publication. PASSED AND APPROVED this _~ ~ day of ~ j;Jt~ ~}};d1I-1t~. Mayor, City of Wylie , 1977. ATTEST: /J-'&/t~) tJ J~ City Secretary, City of Wylie Approved as to form: ...0/7.< -'// LL..c,/~ L"-;. . t .. ! Crty Attorney, "". ~ jL/,<"'''';,'ij Theodore Kent 2. A minimum of 8~inch sewer pipe shall be specified, except that 6-inch lines will be acceptable only in the locations where so approved by the City. 3. Wherever possible, sewers shall bo located in the alleys or easements and shall be 5 feet to 6~ feet deep to invert. 9-14-10: (B) PENALTY Any person, firm or corporation who shall violate any of the provisions of this Ordinance or who shall fail to comply with any provision hereof shall be guilty of a misdemeanor and, upon conviction, shall be subject to a fine not to exceed Two Hundred Dollars ($200.00), and each day that such violation continues shall constitute a separate offense and shall be punishable accordingly. (C) ALL CONFLICTING ORDINANCES REPEALED. (D) SEVERABILITY If any section or part of any section, paragraph or clause of this Ordinance is declared invalid or un- constitutionsl for any reason, such declaration shall not be held to invalidate or impair the validity, force or effect of any other section or sections, part of section, paragraph or clause of this Ordinance. (E) EFFECTIVE DATE This Ordinance shall become effective immediately upon its publication. I ;<. xJ.v PASSED AND APPROVED this day of , 1977. ATTEST: ffc9-~'V<Lj 'LU ~ AI ~J City Secretary, City of Wylie Approved as to form: j i J /' ~ ., // L\..:._../~.....,- .. c.._'- "::, ~ . t -. 1-1 C~ty Attorney, Theodore Kent