Resolution 89-10-10-89-01
'''-/:' ,/" //i r.//) /'
RESOLUT ION NO. af -/Ltl - /1/ cry- ,
.
WHEREAS, The Cities of Wylie, Rowlett and Sachse have
jointly participated in a feasibility study to
determine the cost effectiveness of establishing a
Regional Wastewater Treatment facility; and,
WHEREAS, the feasibility study performed by the Engineering
firm of
that the
Facility
operated
Wylie is
Shimek, Jacobs and Finklea has determined
establishment of a Regional Wastewater
could be constructed, maintained and
at a cost much less than the City of
currently paying; and
WHEREAS, the City of Wylie desires to work with the Cities
of Rowlett, Sachse and Murphy toward the
development of a Regional Wastewater Facility as
proposed in the Shimek, Jacobs and Finklea report;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF WYLIE, TEXAS THAT
SECTION 1 the City Council hereby adopts the Shimek, Jacobs
and Finklea report as a guide for proceeding with
further planning and development of a Regional
Wastewater Plant; and
SECTION 2 the City of Wylie agrees to participate in a
Policy Steering Committee composed of the City
Managers and one (1) representative from each city
council; and
SECTION 3 the City of Wylie hereby requests the North Texas
Municipal Water District to actively participate
as a member of the policy Steering Committee and
to work with the Committee to determine the roll
NTMWD will take in the development, construction,
and operation of the regional facility; and
SECTION 4 the City of Murphy be officially invited to join
the Policy Steering Committee.
~~i~ PASSED ~iyT~~ CITY/;OU~~~{. OF THE ~89~ WYLIE, TEXAS,
_/~' rt2 t- /' L , 1..1. I.-
ATTEST: