Loading...
06-17-1986 (City Council) Agenda Packet AGENDA SUMMARY TUESDAY, JUNE 17, 1986 ITEM NO. 1 - APPOINT REPRESENTATIVE TO NTMWD - This is a re-do of this item. It is our understanding that by the time of the meeting, Mr. Spence will have completed his work for Mr. Cooper and will be no longer have a conflict of interest. ITEM NO. 2 - APPROVAL OF CONTRACT WITH CH2M HILL - The staff has reviewed this contract and made some minor changes, but essentially it is as they were instructed . Representatives of NTMWD have also reviewed the document and made some minor changes. Please review and be prepared with your comments at the meeting. ITEM NO. 3 - WORK SESSION ON FINANCE AND BUDGETING - The staff will be prepared to answer your questions as well as to outline the finance and budgeting functions. ach-iq,AE 6 - 3-i.' ijj4 1/'.34 " AGENDA CALLED MEETING - CITY COUNCIL CITY OF WYLIE, TEXAS TUESDAY, JUNE 17, 1986 7:00 P.M. LIBRARY WORK ROOM 800 THOMAS STREET CALL TO ORDER INVOCATION ORDER OF PAGE BUSINESS REFERENCE BUSINESS 1 Consider appointment of City representative to North Texas Municipal Water District Board of Directors. 2 1-10 Consider approval of proposed contract for Task Order #1 from CH2M Hill on the planning and engineering services for the proposed wastewater treatment plant. 3 Adjourn regular meeting. 4 Convene work session on Finance and Budgeting. 5 ADJOURN Engir!rs AIIIIIII Planners OIRHHILL Economists MEM Scientists June 9, 1986 TX313. 73 Mr. Gus Pappas City Manager City of Wylie P.O. Box 428 Wylie, TX 75098 Dear Mr. Pappas: Enclosed is a draft copy of the proposed contract, scope, and fee for Task Order No. 1 for your review, comments, and additions. This Task Order encompasses services for the preliminary study to determine the best means to upgrade the existing treatment plant and investigate alternative sites for future treatment facilities. We estimate these planning and engineering services will be completed within 120 days after approval of this proposal and authorization to proceed is received. However, we plan to expedite our work to complete the project as quickly as possible. We propose the compensation for performing the services out- lined in Task Order No. 1 to be paid on a monthly billing basis at a rate of the personnel ' s salary cost times a mul- tiplier of 2. 25, with reimbursement of all direct expenses at actual cost times 1 . 10. The total cost shall not exceed $34,335 without the written approval of the City of Wylie. A breakdown of the projected costs related to the major work tasks is summarized below: Work Task Projected Cost 1 . Project Management/Meetings $ 6,555 2. Assess Current Situation 8,270 3. Assess Future Situation 3, 945 4. Evaluate Treatment Plant Site Locations 8, 630 5. Prepare Interim Report 3, 735 Expenses 3, 200 Total $34, 335 CH2M HILL NYC. Dallas Office 5339 Alpha Rood.Suite 30Q Doitos Texas 75240 214.980.2170 / • • Mr. Gus Pappas Page 2 June 9, 1986 TX313. 73 Please feel free to call if you have any questions or if you would like any more information. Sincerely, Gordon F. Koblitz , P.E. Principal-in-Charge jkb/DFW303/003 Enclosure cc: Mr. Carl Riehn, NTMWD • • a AUTHORIZATION FOR DRAFT MEM PROFESSIONAL SERVICES Date June 9 , 1986 CH2M HILL OFFICE ADDRESS 5339 Alpha Road, Suitt:. 3Q0, Dallas , TX 75240 PROJECT_ Wylie WWTP Preliminary Engineering Study PROJECT TX NAME NUMBER CLIENT City of Wylie, Texas ADDRESS 108 So. Jackson - P.O. Box 428 Wylie, TX 75098 Attn: Mr. Gus Pappas , City Manager hereby requests and authorizes CH2M HILL to perform the following services: SCOPE: Engineering and ref a d s rvi r Ps as authori zed d def- ed by I Task Orders covering scope of services and basis of payment Owners execution of Task Order shall cnn_sti tmtP a„thart7at;_.r•n to proceed with the work r'overPri in said TA ck Order. Tack Ordcr No. 1-- Preliminary Engineering Study - Tnt.rim RA port is attached. Additional Services may be authnri7Pd in writing by the Owner without a formal Task Order. COMPENSATION to be on the basis of Salary Cost multiplied by a far-tnr of 7 75 to include administra tive overheads , taxes , and profit; plus direct expenses times 1 . 1n, If technical or professional services are furnished by an outside source, an additional_% shall be added to the cost of the services for CH2M HILL's administrative costs. An additional_%shall also be added to direct expenses. MISCELLANEOUS Additional services not authorized by Task Order shall be -on the 2 .25 multiplier times salary cost plus 1 . 10 times direct expenses basis . Services covered by this authorization shall be performed in accordance with PROVISIONS stated on the back of this form. Approved for CLIENT Accepted for CH2M HILL crtsITg11,L INC CORPORATION By By Title: Title: Dallas Office Manager REV 4/85 FORM 124A DRAFT TASK ORDER NO. 1 TO THE AGREEMENT TO PROVIDE ENGINEERING SERVICES TO THE CITY OF WYLIE, TEXAS FOR DEVELOPMENT OF THE WYLIE WASTEWATER TREATMENT FACILITIES: PRELIMINARY ENGINEERING STUDY--INTERIM REPORT WITNESSETH: WHEREAS, the CITY OF WYLIE, as OWNER, and CH2M HILL CENTRAL, INC. , as ENGINEER, entered into an AGREEMENT to furnish en- gineering services dated , 1986 (the "ORIGINAL AGREEMENT") in connection with preliminary engineering, de- sign, bidding, construction, and post-construction services for a wastewater treatment plant, review and coordination between Wylie and North Texas Municipal Water District (NTMWD) ; and NOW, THEREFORE, the ENGINEER agrees to perform, to the best of its professional ability, such services as are hereinafter set forth, and the OWNER, in consideration thereof, agrees to pay the ENGINEER the amounts as are hereinafter specified, all upon the following terms and conditions, and the OWNER and ENGINEER agree that the following terms and conditions shall be added to and supplement the referenced ORIGINAL AGREEMENT: I . PURPOSE: The purpose of this Task Order is to establish terms and conditions to provide preliminary engineering ser- vices for the evaluation of the existing Wylie waste- water treatment plant (WWTP) , development of a "generic" WWTP facility to treat the ultimate wastewater flow, and evaluation of site locations for future wastewater treatment facilities. Engineering services will also be provided to coordinate the preliminary study activi- ties with NTMWD. II . SCOPE OF SERVICES The scope of services will include the following tasks for preliminary engineering to be performed by the ENGINEER: A. ASSESS CURRENT SITUATION 1. Review existing records for the present quan- tity and quality of wastewater, including any DRAFT industrial wastes which may be present in the sewer system. Develop a flow and waste load profile at the treatment plant. Historical flow and waste loads will be provided by NTMWD. In addition, NTMWD will install a 24-hour composite sampler and provide the ENGINEER with updated waste load data . 2 . Determine the degree of treatment required based upon applicable permits and regulations, the receiving body of water, the amount and strength of wastewater to be treated, and other influencing factors. 3 . Analyze the capacity of the existing waste- water treatment plant and its capability to provide the required degree of treatment. Special emphasis shall be given to: a. Evaluation of the hydraulic capacity of the existing treatment structures. b. Evaluation of the organic waste load removal capacity of the existing struc- tures. c. Evaluation of the sludge digestion, handl- ing, disposal facilities and methods currently available and being practiced at the plant. d. Evaluation of the redundancy and mechan- ical reliability of unit process treat- ment components including influent pump station, oxidation ditch, secondary clari- fier, chlorination facilities, and sludge disposal facilities and how this affects the plant ' s ability to meet the required degree of treatment. 4 . Investigate near-term improvements that could be implemented to improve plant performance or extend the existing facilities capacity. This study task will only address possible short-term alternatives that will allow the existing facilities to meet the required degree of treatment until a new plant can be constructed or the existing plant can be up- graded by addition of new facilities. The following specific problems and possible solu- tions will be investigated and addressed: 2 DRAFT a. Possible insufficient oxygenation capac- ity of the existing oxidation ditch rotor aerators. The following alternatives will be evaluated: o Replace existing aerators with more efficient aerators o Supplement existing aerators with more efficient aerators o Supplement existing aerators with similar type aerators b. Limited secondary clarification capacity. The following alternatives will be eval- uated: o Optimize oxidation ditch/ clarifier operation o Addition of chemical treatment facilities to aid sludge settl- ing characteristics o Addition of tube settlers to extend clarifier capacity c. Limited sludge drying bed capacity. The following alternatives will be evaluated: o Haul liquid sludge to another nearby facility o Addition of chemical treatment facilities to aid sludge drying characteristics o Addition of more drying beds d. Address potential noncompliance with state standards for design capacity as flows increase with the oxidation ditch, secondary clarifier, chlorine contact chamber, chlorine feed facilities, and sand drying beds and impacts of poten- tial improvements. 5. Summarize proposed improvements, both neces- sary and desirable, to the existing wastewater treatment plant. Prioritize the proposed improvements in order of importance. 3 • DRAFT 6. Develop capital cost estimates for each pro- posed improvement. Cost estimates will be of budget level accuracy sufficient to compare the relative economies of the improvements. 7. Prepare a draft technical memorandum contain- ing the results of the investigation of the current situation. Five (5) copies of the draft memorandum will be provided to the OWNER and five (5) copies will be provided to NTMWD for review. B. ASSESS FUTURE SITUATION 1 . Evaluate existing records of population projec- tions for the City of Wylie service area. Coordinate the projections with local planning forecasts. High and low estimates will be made for 20 year and ultimate planning condi- tions. 2. Forecast the future average annual, peak monthly, and peak instantaneous wastewater flows within the planning area. Forecast the future waste loads including biochemical oxy- gen demand (BOD ) , total suspended solids (TSS) , and ammoiia (NH3) within the Wylie service area. 3 . Summarize anticipated near-term future and distant future water quality requirements. 4 . Prepare a draft technical memorandum contain- ing the results of the investigation of the future situation. Five (5) copies of the draft memorandum will be provided to the OWNER and five (5) copies will be provided to NTMWD for review. C. EVALUATE TREATMENT PLANT SITE LOCATIONS 1 . Using a generic treatment plant sized to handle ultimate wastewater flows, evaluate up to five (5) treatment plant site locations. The alternative sites shall be as follows: a. Upgrade existing plant and add new facil- ities at existing plant site b. Construct new plant on City owned pro- perty (40 acre landfill site) adjacent to existing plant site 4 DRAFT c. Construct new plant at southern corner of City' s Lower Muddy Creek lift station district d. Construct new plant at up to two (2) other sites to be mutually agreed upon by the OWNER, NTMWD, and the ENGINEER. 2. A limited evaluation of each plant site will include a review of the availability of ade- quate land area, approximate location and sizes of required gravity and force main collec- tion pipelines, and regional service potential. The OWNER and NTMWD will provide all avail- able information on existing and anticipated sewer pipeline sizes and locations in the study area. 3 . Develop capital and annual operation and mainte- nance (O&M) cost estimates for each proposed plant site. Cost estimates will be of planning level accuracy sufficient to compare the rela- tive economies of the locations. The cost estimates shall be based on the following considerations: a. The same capital cost for the generic wastewater treatment plant shall be used at each site. The generic plant unit process selection will not be analyzed in detail at this time. A published "cost curve" level estimate will be pro- vided for a generic plant including an influent pump station, pretreatment facilities, primary clarifiers, trickl- ing filters, aeration basins, secondary clarifiers, effluent filters, chlorine contact basins, anaerobic digesters, secondary sludge thickeners, digested sludge dewatering facilities, a chlo- rination building, and an administra- tion/lab/control building. b. Annual O&M costs shall be estimated by published "cost curves" based on a 20- year planning period with the average cost over that period occurring at the mid-point of the period. Annual O&M costs shall include labor, power, chemi- cals, and maintenance materials. 4. Prepare a draft technical memorandum contain- ing the results of the investigation of 5 DRAFT treatment plant site locations. Five (5) copies of the draft memorandum will be pro- vided to the OWNER and five (5) copies will be provided to NTMWD for review. D. PREPARE INTERIM REPORT 1 . A draft interim report summarizing the results of the investigations itemized in Sections IIA, IIB, and IIC of this Task Order will be pre- pared and submitted to the OWNER and NTMWD for their review. Twenty (20) copies of the draft report will be provided. 2. On the basis of the results of the review, the draft report will be modified or revised. 3. Furnish seventy-five (75) copies of a final interim report. III. OTHER SERVICES Provide such OTHER SERVICES as the OWNER may authorize. IV. COMPENSATION As consideration for providing the services enumerated above, the OWNER shall pay the ENGINEER for its ser- vices as follows: At a multiplier of 2. 25 times the ENGINEER' s sal- ary costs plus 1. 10 times direct expenses as defined in Provisions 2 and 4 of the ORIGINAL AGREEMENT. The estimated budget for the Prelimi- nary Engineering Study - Interim Report is $34,335 and will not be exceeded without the written approval of the OWNER. IN WITNESS WHEREOF, the parties hereto have made and executed this TASK ORDER NO. 1 on the respective dates written below. FOR CITY OF WYLIE By Name Title By Name Title Dated this day of June 1986 6 DRAFT FOR CH2M HILL CENTRAL, INC. By Dallas Office Manager Dated this day of June 1986 DFW303/002 7 / i