Loading...
Resolution 2012-16RESOLUTION NO. 2012-16(R) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS, HEREBY AUTHORIZING THE CITY MANAGER OF THE CITY OF WYLIE, TEXAS, TO ENTER INTO AND EXECUTE A REIMBURSEMENT AGREEMENT, ON A FORCED ACCOUNT BASIS, WITH THE KANSAS CITY SOUTHERN RAILWAY COMPANY FOR MATERIAL AND LABOR; PROVIDING FOR AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS: SECTION 1: The City Manager of the City of Wylie, Texas, is hereby authorized to enter into and execute, on behalf of the City Council of the City of Wylie, Texas, a reimbursement agreement, on a forced account basis, with The Kansas City Southern Railway Company for material and labor, a copy of which is attached hereto as Exhibit "A" and incorporated herein for all purposes. SECTION 2: This Resolution shall take effect immediately upon its passage. DULY PASSED AND APPROVED by the City Council of the City of Wylie on this 24th day of April, 2012. c Q ERIC HOG[), Mayor ATTEST TO: \\ CAROLE EH ICH, City Secretary Resolution No. 2012 -16(R) KCSC Reimbursement Agreement arie of r'g ® GRADE CROSSING IMPROVEMENTS AGREEMENT This AGREEMENT is entered into this day of , 2012 by and between THE KANSAS CITY SOUTHERN RAILWAY COMPANY, a Missouri corporation called herein "KCS ", and CITY of WYLIE, TEXAS to be addressed at 300 Country Club Road, Building 100 Wylie, TX 75098, called herein "City" (KCS and City being sometimes referred to herein individually as a "Party" or together as the "Parties "). WHEREAS, McCreary Road is an existing public road in Wylie, Texas, which crosses KCS's mainline at Mile Post C- 583.27, on the Alliance Subdivision, DOT No. 790146W ( "Crossing "); and WHEREAS, City desires to modify the Crossing by installation of a concrete crossing surface for a sidewalk as per Exhibit "A," which is attached hereto and incorporated herein for all purposes; and WHEREAS, City and Dallas Area Rapid Transit ( "DART ") have entered into a License Agreement for the purpose of authorizing City to construct, install, operate and maintain one (1) four -foot (4') wide concrete sidewalk outside the ends of the ties; and WHEREAS, KCS is agreeable to performing the work necessary to modify the aforesaid Crossing from end of tie to end of tie, including installation of concrete crossing surfaces for a sidewalk as per Exhibit "A" (the "Project "), but only as subject to the following terms and conditions of this Agreement. NOW, THEREFORE, the Parties agree as follows: 1. KCS shall provide the necessary materials and labor to extend the grade crossing surfaces from end of tie to end of tie for the sidewalk as per Exhibit "A" at the Crossing. The City shall pay 100% of KCS's actual costs of installing the new crossing surface, including labor, equipment, materials, shipping and handling of the materials, and standard additives as reflected on Exhibit "A" hereto (the "Estimate for the Project "). KCS estimates the cost of the Project to be SIXTEEN THOUSAND NINE HUNDRED SEVENTY TWO DOLLARS ($16,972.00), as shown on Exhibit "A ". KCS will invoice the City for that estimated amount of SIXTEEN THOUSAND NINE HUNDRED SEVENTY TWO DOLLARS ($16,972.00) at or after delivery of the crossing surface to the site. The City shall pay said invoice within 30 days of the date it is sent and within the City's 2011 -2012 fiscal year. Following completion of the Project, KCS shall determine its actual cost of the Project. If the actual cost exceeds the estimated amount stated above, KCS shall invoice the City for the difference between the estimated amount and the actual cost and the City shall pay that additional invoice within 30 days after the date it is sent. If the estimated amount exceeds the actual cost, KCS shall refund to the City the amount of that excess within 30 days of receipt of the City's payment of the estimated cost. 2. City, at its sole cost and expense, shall provide all necessary materials and labor to reconstruct the portions of the Crossing outside the ends of ties. City will install the sidewalk approaches, drainage, pavement markings and arrange for disposal of the spoil removed from the Crossing, close the roadway to all vehicular and truck traffic as needed during construction, arrange for all construction and warning signs and barricades, and be responsible for any required notification of the public. 1 Resolution No. 2012 -16(R) 3. City shall furnish KCS with a certified copy of resolution or ordinance adopted by the governing body of Wylie, Texas authorizing the City Manager to execute this Agreement on behalf of City. 4. City shall be responsible for providing and paying for all traffic and pedestrian control (including but not limited to barriers and flagmen) required during the Project, all in accordance with the Manual on Uniform Traffic Control Devices and other applicable safety standards. 5. Upon completion of the work, the crossing surface installed in the Project will thereafter be maintained by KCS. 6. The City, with the cooperation of KCS, will be responsible for obtaining any required governmental authorizations, including approval of the Texas Department of Transportation. All work will be done in accordance with the Manual on Uniform Traffic Control Devices where it applies. 7. Unless by August 1, 2012 this Agreement is fully executed and KCS is authorized to perform the Project, this Agreement shall be void and KCS shall not perform the Project. KCS shall be authorized to perform the Project upon receiving notice from the City containing a complete, fully - executed original of this Agreement. IN WITNESS WHEREOF, the Parties hereto have caused this agreement to be executed in duplicate the day and year first above written. THE KANSAS CITY SOUTHERN RAILWAY COMPANY Approved as to legal form: David C. Reeves 2 -11 -12 Name: Associate General Counsel The Kansas City Southern Title: Railway Company Date: CITY of WYLIE, TEXAS Name: Title: Date: Resolution No. 2012 -16(R) 2 ral INN IMM OF b) Entire Agreement. This Agreement contains the entire agreement of the Parties with respect to the matters contained herein and may not be modified or terminated except upon the provisions hereof or by the mutual written agreement of the Parties hereto. C) Consideration. This Agreement is executed by the Parties hereto without coercion or duress and for substantial consideration, the sufficiency of which is forever confessed. d) CounteMarts. This Agreement may be executed in a number of identical counterparts, each of which shall be deemed an original for all purposes. e) Governing Law. This Agreement shall be construed under and in accordance with the laws of the State of Texas. Venue for any action arising out of the Parties' performance under this Agreement shall be in 2, court of appropriate jurisdiction with respect to Collin County, Texas. h) Representations. Each signatory represents this Agreement has been read by the Party for which this Agreement is executed and that such Party has had an opportunity to confer with its counsel. Assignment. This Agreement or any part thereof shall not be assigned or transferred by any Party without the prior written consent of the other Party. k) Appropriation of Funds — Funds are not presently budgeted for City's performance under this Agreement beyond the end of the City's 2011- 2012 fiscal year. City shall have no liability for payment of any money for services performed after the end of City's 2011-2012 fiscal year unless and until such funds are budgeted. Date: Applicant: City of Wylie Tx Location: Wylie Tx Dot #: 790.146W Project #: Asset #: ESTIMATE Mile Post. C -583 27 Road Name: McCreary Road Project Summary: Install (1 ea ) 8.125' concrete crossing, Remove and Relocate the last existing set on the East Side of crossing to incorproate the installation of the new panel. Change out 15 ties and hand tamp. All items may or may not be used, if not, the final billing will reflect actual quantities. THIS IS AN ESTIMATE OF COST THE INDIVIUAL PRICES AND FINAL BILL MAY VARY BUT THE FINAL BILLING WILL REFLECT ACTUAL DOCUMENTALBLE PRICE Road Authority to be responsible for the closure of the road for a minimum of two days during construction and the detouring of vehicular traffic and all traffic control DO NOT DISTURB THE EXISTING HARD PAN OF THE EXISTING CROSSING. Estimated Project Cost $ 16,972 Grading - Subarade Preparation (1) Materials 20 Net Tons -Ballast Material $1.869 15 $50.00 per Net Ton $1.000 Total Materials Cost $1,000 (2) Contractor Labor and Equipment Ea - New 136RE Tie Plates 1 Contractors estimate $10 50 Ea $315 $7,500 00 per Hour $7500 12 Man Hours - Contract Recordkeeping & Completion Reports $1.33 Ea. $80 $50 00 per Hour $600 1 Haul ties and track material to location $0.45 Ea. $90 $1.465.00 estimated $1.465 1 Disposal of spoils % State and Use Tax on Materials $177 $1.000.00 estimated $1.000 Total Contractor Cost $10,565 Crossing and Trackwork (1) Materials 8 125 L F - Prefabricated Concrete Crossing Panel for 1151b or 136RE Rail $230 00 per L.F. $1.869 15 Ea -Oak Ties $39 45 Ea $592 30 Ea - New 136RE Tie Plates $10 50 Ea $315 60 Ea - 136RE Rail Anchors $1.33 Ea. $80 200 Ea. - Track Spikes $0.45 Ea. $90 5 % Freight and Handling of Materials $147 6 % State and Use Tax on Materials $177 2 Days - 2 Heavy Duty Drills Total Materials Cost $3,270 (2) Labor 2 Days - 2 Impact Wrenches 12 Project Management 2 Days - 2 Air Compressors $60.00 per Hour $720 10.55 % Vacation and Holidays $76 18.31 % Health and Welfare $132 26.73 % Railroad Retirement and Unemployment $213 1.95 % Supplemental Pension $16 12.5 % Railroad Public Liability Insurance $90 Total Labor Cost $1,246 (3) Equipment 2 Days - 2 Heavy Duty Drills $22.00 per Day $88 2 Days - 2 Impact Wrenches $22.00 per Day $88 2 Days - 2 Air Compressors $65.00 per Day $260 12 Hours - Section Truck with Rail Units $25.33 per Hour $304 12 Hours - Roadmaster Truck with Rail Units $12.61 per Hour $151 Total Equipment Cost $ 8' J CL CL to • 40 cl .0 0 .0 CL CL V M 0 0 .0 0 E 0 KCS ROW KCS ROW J7 i- -- --------- - -- - - ------- --- - - ---- --- - - ---- _-- -- •.•-- •-- .- .- .- • - -. -• --.-.-j .77 T EL 0 wo E rn CL CL I CL 2. X* 0 C'j Ix I E ID Is, M a. 0 IN 0 Im a KCS ROW KCS ROW IDa£9 ;I�ate 1; 7-56 nala „F.t9669 96- uol ..:Z6ZLO CC lel 966L LLCZ .f.'6 a�e� �la6ew� a;6000 1.:(27:, oro Sr . 'MS 1 IIS f MilkI -. - - / ill. 111, 1r la 1 4 w�r+rrwr�wti,ti �3,�.•;►:v sa _ a � _ -- ; rAililt._ ...............z._ ... . vim. tiolT" - ..,-,.."11."1111 . 1- V--- . if .. 1 Li 1 L ; �AAIAIIIMIIII •i 4lrtil� r .� il. — ---4=::M— • e: -�_ icELi:- _ _ � _.ii ,......-...,..„„ . .. 1-877-527-9464 [TOLL FREE) AND GIVE "DO" NUMBER klicCREARY ROAD,MURPIN'.TX MILE MSTC-5101,i� DOT No �90b1.,nW ) OTf . 79014 f 1 ME R :Ilw ell 1. 17- � -fit ��F. 4 G.14- 1 1 ; it. 77L . &-t- NI rk R 0 N� Af lg, e% fo N -4 fl Ii 1 YV 1r I 1 I. I I 1 41 k. Ak r1 I I I a 0 w 3. k' � I 0 T' F J c a .S 1 i k