Resolution 2012-20 RESOLUTION NO.2012-20(R)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WYLIE,
TEXAS, HEREBY AUTHORIZING THE CITY MANAGER OF THE
CITY OF WYLIE, TEXAS, TO EXECUTE A GRADE CROSSING
CONSTRUCTION AGREEMENT WITH THE KANSAS CITY
SOUTHERN RAILWAY COMPANY FOR THE WEST BROWN STREET
CROSSING.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
C][TY OF WYLIE,TEXAS:
SECTION l: The City Manager of the City of WYLIE, Texas, is hereby authorized to
ex:ecute, on behalf of the City Council of the City of WYLIE, Texas, the Grade Crossing
Construction Agreement with the Kansas City Southern Railway Company for the West Brown
Street crossing.
�' SECTION 2: This Resolution shall take effect immediately upon its passage.
RESOLVED THIS THE 12th day of June 2012.
ERIC HOGUE, or
�� OF tvp�l
`��/(/!��r?'r �
A'TTEST TO: � �
, ,,�
; �
_ ��_� n�
�
�
C.AROLE EH CH, City Secretary .�;�',�°,;,�•�,�
.�`� •188?�
�'�r!OF T��g
Re;solution No.2012-20(R)
Grade Crossing Construction Agreement
KCSC
EXHIBIT "A" �
Grade Crossing Construction Agreement
Resolution No.2012-20(R)
Grade Gossing Construction Agreement
KCSC
GRADE CROSSING CONSTRUCTION AGREEMENT
This AGREEMENT is entered into this 12th day of June, 2012 by and between THE
I�ANSAS CITY SOUTHERN RAILWAY COMPANY,(herein sometimes called "KCS"), a
Pvlissouri corporation to be addressed at P.O. Box 219335, Kansas City, MO 64121-9335, and
CITY OF WYLIE, TEXAS, (herein sometimes called "City"), to be addressed at 300 Country
(�lub Road, Wylie, TX 75098 (KCS and City each being sometimes referred to herein
individually as a"Party"and sometimes being referred to herein together as the"Parties").
WHEREAS, FM 3412, Brown Street, in Wylie, Texas, is being widened West from
Texas Highway 78;and
WHEREAS, said widening shall cross KCS's tracks at approximately railroad Mile Post
'C-201.23 (G579.65),Dallas Subdivision DOT No. 789652B; and
WHEREAS, City desires to provide for the reconstruction of the at-grade highway-rail
crossing where FM 3412,Brown Street crosses KCS's track; and
WHEREAS, KCS has agreed to perform the work necessary for such reconstruction, but
only as subject to the following terms and conditions of this Agreement.
NOW, THEREFORE,the Parties agree as follows:
L KCS shall provide the necessary materials and labor to perform the necessary
��� construction of the grade crossing surfaces from end of tie to end of tie for the Crossing.
I�CS's estimate of the costs required to perform said work is attached hereto as Exhibit A.
The Parties acknowledge that Exhibit A is only an estimate, and that the City shall be
responsible for the actual cost of the labor, material and other expenses incurred by KCS for
the grade crossing surface construction, determined according to the methodology shown in
lJxhibit A, whether such actual cost is more or less than shown on Exhibit A.
2. KCS shall provide the necessary materials and labor to construct the grade crossing
��varning devices for the Crossing. KCS's estimate of the costs required to perform said work
is attached hereto as Exhibit B. The Parties acknowledge that Exhibit B is only an estimate,
and that the City shall be responsible for the actual cost of the labor, material and other
f,xpenses incurred by KCS for the grade crossing warning device construction shown on
]�xhibit B, determined according to the methodology shown in Exhibit B, whether such actual
rost is more or less than shown on Exhibit B.
3. Prior to KCS performing any work on this project, City will deposit with KCS
'THREE HUNDRED NINETY SEVEN THOUSAND, EIGHT HUNDRED SEVENTY-FIVE
DOLLARS ($397,875.00) to cover the estimated cost to procure and install the grade crossing
surface and grade crossing warning devices, including estimated transportation, shipping and
handling costs for the same (the "associated costs"). KCS shall be under no obligation to
provide any materials or perform any labor until the City's deposit has been received and
rleared KCS's bank.
KCSR-Wylie,TX Agreement,FM 3412,Brown Street Crossing Construction
Page No. 1 of 3
4. City shall furnish KCS documentation of Federal Funds - particularly funds
appropriated under 23 U.S.C. Section 130 - if any, being used to compensate KCS for the �
project.
5. Upon completion of the installation of the grade crossing surface and grade
crossing warning devices, KCS shall determine the actual cost of the crossing surface and
grade crossing warning devices, including associated costs. If that actual cost and associated
costs together exceed $397,8'75.00, KCS shall invoice the City for the additional amount by
which the actual costs together with associated costs exceed $397,875.00. If KCS issues such
an invoice to the City,the City shall pay such invoice within sixty (60) days. If the actual cost
of the project, together with associated costs, is less than $397,875.00, KCS shall determine
the actual cost and associated costs of the project and advise the City thereof, and shall within
sixty (60) days thereafter issue a refund to the City of the difference between the actual cost
plus associated costs and the estimated cost of$397,875.00.
6. City, at its sole cost and expense, shall provide all necessary materials and labor to
construct the portions of the roadway surface outside the ends of ties. City will install the road
approaches, drainage,pavement markings and arrange for disposal of the spoil (if any),cause the
roadway to remain closed to all vehicular and truck traffic during construction, arrange for all
construction and warning signs and barricades, and be responsible for any required notification
of the public. In doing such work, the City shall enhance or, at a minimum, shall not impair or
reduce the existing drainage of water away from the track.
7. City shall furnish KCS with a certified copy of a resolution or ordinance adopted by
the governing body of City of Wylie, Texas authorizing the Mayor or City Manager to execute
this Agreement on behalf of City.
8. City shall be responsible for providing and paying for all traffic and pedestrian control
(including but not limited to barriers and flagmen) required during the project, all in accordance
with the Manual on Uniform Traffic Control Devices and other applicable safety standards,
including KCS's. Whenever City's contractor or its personnel or equipment are within twenty-
five feet (25') of KCS's track, their activities shall be attended by a KCS-approved railroad
flagman,hired and paid by the City. The City's contractor and its personnel and equipment shall
clear the KCS track when so instructed by the railroad flagman. City and its contractors
performing any work within KCS's right of way shall carry appropriate insurance which is
sufficient, in the City's reasonable opinion,to fully compensate for any injury to or death of any
person or for any damage to property occurring while City or its contractors are performing any
work within KCS's right of way.
9. Upon completion of the work, the crossing surface between the ends of the ties,
signal, flasher and gate will thereafter be maintained by KCS.
10. The City, with the cooperation of KCS, will be responsible for obtaining any
required governmental authorizations, including approval of the Texas Department of
KCSR-Wylie,TX Agreement,FM 3412,Brown Street Crossing Construction
Page No.2 of 3
Transportation. All work will be done in accordance with the Manual on Uniform Traffic
Control Devices.
11. The Parties hereby incorporate the requirements of 41 C.F.R. §§ 60-1.4(a)(7), 60-
150.5, 60-741.5, and 29 C.F.R. Part 470, if applicable.
IN WIT'NESS WHEREOF,the Parties hereto have caused this agreement to be executed
in duplicate the day and year first above written.
THE KANSAS CITY SOUTHERN RAILWAY
COMPANY
Name:
Title:
Date:
Approved as to legal form:
Z���. �
Associate General Counsel
CITY OF WYLIE,TEXAS
_w Name:
Title:
Date:
KCSR-Wylie,TX Agreement,FM 3412,Brown Street Crossing Construction
Page No.3 of 3
ESTIMATE
Date: 05/01/12
Applicant: City
Location: Wylie Tx Mile Post: G579.65 .��
Dot#: 789652B Road Name: West Brown St
Project#:
Asset#:
Proiect Summarv:
Install ea)73.125'concrete crossing,new filter fabric,new ballast,new drainage pipes and extension
of existing hardpan to incorporate the widening,
All items may or may not be used,if not,the final billing will reflect actual quantities.
THIS IS AN ESTIMATE OF COST THE INDIVIUAL PRICES AND FINAL BILL MAY
VARY BUT THE FINAL BILLING WILL REFLECT ACTUAL DOCUMENTALBLE PRICES
Road Authoritv to be responsible for the closure of the road for a minimum of
three davs durina construction and the detourin4 of vehicular traffic and all traffic control
Road Authoritv to be responsible for approach work both directions down the
road after the installation of new crossinq surface
DO NOT DISTURB THE EXISTING HARD PAN OF THE EXISTING CROSSING.
Estimated Project Cost $ 149,375
Gradinq-Subqrade Preparation
(1)Materials
109 Net Tons- Asphalt for Filler �
$100.00 per Net Ton $10,900
96 Net Tons-12"Asphalt Subbase for extension
$100.00 per Net Ton $9,600
200 Net Tons-Ballast Material
$50.00 per Net Ton $10,000
300 L.F.-6"PerforatedSock Pipe
$15.00 per L.F. $4,500
Total Materials Cost $35,000
(2)Contractor Labor and Equipment
36 Hours-Trackhoe with Operator
$125.00 per Hour $9,000
� 36 Hours-Dump Truck with Operator
$85.00 per Hour $3,060
36 Hours-Dozer with Operator
$85.00 per Hour $3,060
18 Hours-Steel Wheel Roller with Operator for compaction of new asphalt bottom
$45.00 per Hour $810
72 Man Hours-Miscellaneous Labor
$30.00 per Hour $2,160
48 Man Hours-Flagging(Rail Pro)
$80.00 per Hour $3,840
40 Man Hours-Contract Recordkeeping&Completion Reports
$50.00 per Hour $2,000
1 Disposal of spoils
$5,000.00 estimated $5,000
1 Haul Track Panels by Truck
$3,600.00 $3,600
Total Contractor Cost $32,530
Crossiriq and Trackwork
(1)Materials
� 73.125 L.F.-Prefabricated Concrete Crossing Panel for 1151b or 136RE Rail
$230.00 per L.F. $16,819
2 Ea.-80' 136#Prefabricated Track Panel 10'Oak Ties on 19 1/2"centers
$10,613.49 Ea. $21,227
4 Ea-39'Transition rails 136# to 115# KCS Part#13616651 4ea per crossing
$1,400.00 ea
$5,600
10 Ea.-Plasma Welds
$400.00 $4,000
50 Ea.-New 136RE Tie Plates
$10.50 Ea. $525
"I00 Ea.-136RE Rail Anchors
$1.33 Ea. $133
1040 Ea.-115RE Rail Anchors
$0.45 Ea. $468
2�400 Sq. Ft. -Filter Fabric
$0.25 per Sq. Ft. $600
5 % Freight and Handling of Materials $2,469
6 %State and Use Tax on Materials $2,962
Total Materials Cost $54,803
(2)Labor
60 Project Management
$60.00 per Hour $3,600
72 Man Hours to Remove Existing Crossing "�
$30.00 per Man Hour $2,160
72 Man Hours to Reconstruct Track
$30.00 per Man Hour $2,160
72 Man Hours to Install New Crossing
$30.00 per Man Hour $2,160
10.55 %Vacation and Holidays $1,063
18.31 %Health and Welfare $1,846
26.73 % Railroad Retirement and Unemployment $2,979
1.95 %Supplemental Pension $217
12.5 %Railroad Public Liability Insurance $1,260
Total Labor Cost $17,445
(3)Equipment
3 Days-2 Heavy Duty Drills
$22.00 per Day $132
3 Days-2 Impact Wrenches
$22.00 per Day $132
3 Days-2 Air Compressors
$65.00 per Day $390 "'""""
2 Day-Automatic Tamper with Operator
$1,149.00 per Day $2,298
2 Day-Ballast Regulator with Operator
$520.00 per Day $1,040
24 Hours-Section Truck with Rail Units
$25.33 per Hour $608
24 Hours-Roadmaster Truck with Rail Units
$12.61 per Hour $303
36 Hours-Welding Truck with Rail Units
$63.75 per Hour $2,295
4 Hours-Work Train to Unload Ballast
$600.00 per Hour $2,400
Total Equipment Cost $9,598
Estimated Project Cost $149 375
KANSAS CITY SOUTHERN RAILWAY COMPANY
GRADE CROSSING WARNING DEVICES
� ' ' SIGNAL PROJECT ESTIMATE OF COST
ESTIMATE IS DEFINED AS: TO PRODUCE A STATEMENT OF APPROXIMATE COST DATE 5/1/12
Project Description & Location...
PROF'OSED TO INSTALL TWO NEW FLASHER SIGNALS WITH GATES, TWO NEW MEDIAN FLASHER
SIGNALS, AND A NEW 6' x 8' STEEL BUNGALOW WITH CONSTANT WARNING TIME GCP UNIT AT
THE C;ROSSING OF KCS RAILWAY TRACKS WITH FM 3412 (BROWN STREET) IN WYLIE, TX
...INCI_UDES A GCP UNIT AND SEAR II ALARM REPORTING VIA VHF HOPPER RADIO WITH 20'TOWER
States, Identification... Funding Mechanism... Railroads Identification...
COLLIN COUNTY E SIGNAL PROJECT FILE NO. SD-08-5-201.23
DOT IVO. 789-652 B DOT NO. 789-652 B
CITY PROJECT MILE POST T-201.23 (579.73)
FM 3412 (BROWN STREET} ASSET# 982745
IN W`(LIE, TX TRANSCONTINENTAL DIVISION
GREENVILLE SUBDIVISION
MATERIf\L Description&Pricing Info... QTY Unit Unit Price � TOTAL
6'x 8'STEEL BUNGALOW, with SEARII Reporting Unit,with Modules and
Progr<�m required to control warning devices as shown, Chargers&Battery necs.,etc 1 LOT 39,000 � $39,000.00
FLASHER.&GATE SIGNALS, with 12"LED Lights,Ail Aluminum Gate Arms,LED Gate � ^ ^^mm�^^^mm
Lights, Signs, Bells,with any side lights as per State Specifications. 1 LOT 32,000 $32,000.00
�° SIGNAL^GROUND MATERIAL, Foundations, Underground Wire&Cabie, Guard Rails, ^�m
Multi Shunt Boxes at approaches,Track Connectors, Bond Wires,wiring materials, etc. 1 LOT 23,500 $23,500.00
Containerized Freight Charges, Safetran Systems 1 LOT 5,500 E $5,500.00
10% DAaterial Contingency Fee, Safetran Systems 1 LOT 9,500 E $9,500.00
PROJECT MATERIAL, Cover Rock or Fill Materiai, 220 Volt AC Service Pole, boring, etc
Directional Boring with 4" PVC Pipe as determined by Railroad, retaining wall, etc. 1 LOT 33,000 $33,000.00
Public Road Authority to perform any culvert or drainage work required, cost not included E
c
MATERIiaL RELEASED... none `•
SEE KC:>R LAYOUT PLAN... DWG NO MATERIAL SUB TOTAL= $ 142,500.00
LABOR F4 ADDITIVES,Equipment,Engineering... QTY Unit Unit Price � TOTAL
KCS LAEtOR with Additives, all Signal Dept. Personnel required for Administration,
and far Field Instailation, testing and cut-over as directed by the Signai Engineer. 12d 1 Const 53.040 : $53,040.00
EQUIPMENT CHARGES. for Signai Dept Pickup Trucks, Backhoes, Boom Trucks, etc. 1 Const 16,770 $ 16.770.00
KCS PEF2SONAL EXPENSES, for all Signal Dept Personnel 1 Const 8,190 $8,190.00
^CONTRACT ENGINEERING, for Layout Design, Quote Plans, Material Lists, Layout Plans
&Estimate, Shop Wiring&Field Construction Pians as directed by the RR (JaKay) 1 Const 19,500 $ 19,500.00
CONTRACT ACCOUNTING, Project Cost Tracking System through the life of the project, �mT E
Completion Reports and assist Accounting with Final Billing preperation. {BHS) 1 Const 5,000 $5,000.00
UTiLITY COORDINATION, arrangements for new electrical service, relocation of utilities, � €
arranc3e for rock&fill material, project coordination as directed by the RR (JaKay) 1 Const 3,500 € $3,500.00
FIELD I�ISTALLATION CONTRACTOR. to provide equipment&personnel as required by E
the KCSR Field installation Bid Request package for the signal installation. N/A
�........�.-•-•-•--,,.......��._��.��......._.��...... _....... ..
�°"""`�' THIS ESTIMATE IS LIMITED TO'I80 DAYS FROM DATE OF ISSUANCE,KCS SHALL AUTHORI2E IT'S USE THEREAFTER �p,gOR SUB TOTAL= $ 106�000.00
TO INSTALL FLASHERS 8R GATES AT TOTAL ESTIMATE OF COST
FM 3412 (BROWN STREETj IN WYLIE, TEXAS � Z4S, 'rJ��.�O