Loading...
09-01-1987 (City Council) Agenda Packet AGENDA CALLED COUNCIL MEETING CITY OF WYLIE, TEXAS SEPTEMBER 1, 1987 6 :30 P.M. RITA & TRUETT SMITH LIBRARY 800 THOMAS STREET CALL TO ORDER INVOCATION ORDER OF PAGE BUSINESS REFERANCE BUSINESS 1 1-2 Consider award of telephone equipment bid for municipal complex . 2 Adjourn to workshop. 3 3-4 Convene workshop on City water/sewer rates and Binford Rate Study. 4 Adjourn. ...- U ... ■ ■.■ ... ... ■.■ ■ ■.I • U.. JONES&BOYD,INC. CONSULTING ENGINEERS 16980 Dallas Parkway,Suite 100 Dallas,Texas 75248 214-248-7676 August 26, 1987 OFFICERS: J.Gregory Boyd,P.E. President Wayland D.Oradat,P.E. Vice President Douglas W.Newport,P.E. Vice President ASSOCIATES: Mr. James Johnson Les St.John,P.E. Acting City Manager Stephen E.Donaldson,R.P.S. Peter S.Boecher,ASLA City of Wy l i e Robert R.Steele,P.E.,R.P.S. p.0. Box 428 Wylie, Texas 75098 Re: Installation of Telephone Facilities in the new Municipal Complex Dear Mr. Johnson:. On August 20, 1987, the City of Wylie received bids for the in- stallation of telephone facilities in the City's new Municipal Complex. Bids were received from: AMOUNT OF BIDDER BASE BID Southwestern Telecom, Inc. McKinney, Texas $20,746 .00 GTE Business Phone Systems General Telephone Company of the Southwest $16,751.61 The lowest and best bid submitted appears to be that of GTE. GTE submitted attachments "A" and "B" with their bid which clarified and took exceptions to certain portions of the contract require- ments. We have reviewed the attachments and have found all items of clarification of attachment "A" to be acceptable. We have reveiwed the exceptions taken under attachment "B" with Mr. Robert Dillard, the City's Attorney, and have found the additional wording concerning royalties and patents, item 3.14, to be acceptable and have also found the substitution wording concerning indemnifica- tion, item 3.17, to be acceptable. We, therefore, recommend the City award the contract for the installation of new telephone facilities in the new Municipal Mr. James Johnson Page Two August 26, 1987 Complex to GTE in the amount of $16,751 .61 with the understanding that only items 3.14 and 3.17 are acceptable and that no other exceptions or clarifications of attachment "B" are acceptable. Sincerely, JONES & BOYD, INC. Douglas W. Newport, P.E. DWN:dlc , BIDS TELEPHONE FACILITIES GTE BID SOUTHWEST TELECOM ********************************************************************* ************************ ) ITEM ITEM DESCRIPTION QUANTITY UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL 1 Installation of wire and telephone jacks in walls of office in Munici- pal Complex at locations indicated on installation drawings 68 25.00 1,750.00 20.00 1,360.00 2. Removal of existing CS-10 Stations in existing City Hall and installation in new Bldg. 11 12.50 137.50 24.00 264.00 3. Removal of existing CS-20 Sta. in existing City Hall & installation in new building 6 12.50 75.00 24.00 144.00 • 4. Removal of existing SBCS cabinet in existing bldg. and installation in ) new building. 1 200.00 200.00 576.00 576.00 ) 5. Upgrading of existing } SBCS cabinet to package C ) software 1 2,538.23 2,538.23 4,344.00 4,344.00 ) 6. Installation of two (2) emergency power back-up for new facilities 1 1,790.00 1,790.00 1,971.00 1,971.00 7. Modification of existing SBCA cabinet to allow ainstallation of ten new trunk lines in addition to the existing eight trunk lines at present 6 trunk lines to P.D. 1 will be a new emergency 1 6,163.88 6,163.88 1,725.00 1,725.00 8. Providing & installing new CS-20 stations ** 1 331.37 1,325.48 498.00 498.00 9. Providing & installing new CS-10 stations 10 127.43 1,274.30 451.72 4,517.20 10. Providing & installing single line stations 12 65.69 788.28 336.00 4,032.00 11. Providing & installing new wall mounted CS-10 stations 1 139.14 139.14 475.00 475.00 12. Providing & installing • ) new wall mounted sinlge , line station 1 66.14 66.14 336.00 336.00 13. Removal & installation of esixting forty (40) button direct station selecting console (DDS) in sec. office of Police 1 75.00 75.00 48.00 48.00 14. Installation of new forty (40) button direct statio n selecting console (DDS) in reception office 1 328.66 328.66 72.00 72.00 15. Removal & installation of existing power poles in new building 4 25.00 100.00 96.00 384.00 TOTAL COST OF ALL ITEMS 11,900.54 16,751.61 10,996.72 20,746.20 BID - TELEPHONE FACILITIES 1 GTE Bid Southwestern Telecom Total cost) of all items listed - based ) on equal monthly payments over a period of five (5) years. $370.55 $28,629.60 (477.16) / ANNUAL COST OF MAINTENANCE BEYOND THE WARRANTY PERIOD First years Total cost payable on ) monthly basis $434.86 Qtr. 1,615.00 annually Second years total cost payable on monthly basis $465 30_atr not o Yceed CPI Third year total cost payable on monthly basis $497.87 (Utr not to eXCPpil CPI Fourth years total cost payable on monthly basis $532.72 atr not to exceed CPI Fifth years total cost payable on monthly basis 570.01 not toxc eeed CPI 1