Loading...
Resolution 2013-221 RESOLUTION NO. 2013 -22(R) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS, HEREBY AUTHORIZING THE CITY MANAGER OF THE CITY OF WYLIE, TEXAS, TO EXECUTE THE INTERLOCAL AGREEMENT BETWEEN THE NORTH TEXAS MUNICIPAL WATER DISTRICT AND THE CITY OF WYLIE CONCERNING THE RELOCATION OF A PORTION OF 36 -INCH PIPELINE ALONG EAST BROWN STREET NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS: SECTION 1: The City Manager of the City of WYLIE, Texas, is hereby authorized to execute, on behalf of the City Council of the City of WYLIE, Texas, the interlocal agreement between the North Texas Municipal Water District and the City of Wylie concerning the relocation of a portion of 36 -inch pipeline along East Brown Street. SECTION 2: This Resolution shall take effect immediately upon its passage. RESOLVED THIS THE 8th day of October, 2013. "41.1 COLORADO! ,III . RAILIV4; a 887 r ATTEST Br 15 OF CA OLE EHRLIC`H, City Secretary — eiv-7:= ERIC HOGUE, y r Resolution No. 2013 -22(R) - Interlocal Agreement - North Texas Municipal Water District Pipeline Relocation - 36" along East Brown Street Page 1 of 2 EXHIBIT "A" Interlocal Agreement 1 Resolution No. 2013 -22(R) - Interlocal Agreement - North Texas Municipal Water District Pipeline Relocation - 36" along East Brown Street Page 2 of 2 The State of Texas County of Collin INTERLOCAL AGREEMENT FOR WATER PIPELINE WHEREAS, North Texas Municipal Water District (NTMWD) currently has an existing 36 -inch water transmission pipeline from Wylie to Lavon, which parallels the north right -of -way of Brown Street to a point 264 feet west of Eubanks Lane, where said pipeline crosses underneath Brown Street. All of which lies within the Wylie city limits. WHEREAS, Wylie currently has plans for the construction of paving and drainage improvements of Brown Street from State Highway 78 to Stone Road which will require the relocation of approximately 270 feet of the 36 -inch NTMWD water transmission pipeline. WHEREAS, Wylie and NTMWD desire to enter into an agreement for reimbursement to NTMWD of the cost for relocation of a portion of the existing NTMWD 36 -inch water pipeline along Brown Street, hereinafter called the "Project ". WHEREAS, the Wylie City Council has approved funding for the Project. NOW, THEREFORE, THIS AGREEMENT is hereby made and mutually entered into by Wylie and NTMWD for the mutual consideration stated herein as follows: WITNESSETH: ARTICLE I. Wylie hereby agrees to the following: 1. Provide an easement for NTMWD's pipeline relocation adjacent and parallel to the new north right -of -way of Brown Street. At the request of the NTMWD, reimburse the NTMWD for the costs associated with the relocation of approximately 165 feet of NTMWD's 36 -inch water transmission pipeline currently located in private easement. The estimated cost of the 36 -inch pipeline relocation project is $306,000 and the estimated amount to be reimbursed to NTMWD is $153,000. The City's obligation shall be based on unit price bid by the lowest qualified construction contractor to whom NTMWD shall approve and award the project construction contract and on the appurtenances. 3. Reimburse the NTMWD for the costs associated with the consulting engineer's fee for the design of the project in proportion to the ratio of estimated construction cost reimbursable to NTMWD divided by the total estimated construction cost of the 36 -inch relocation ($153,000/$306,000). The proportional amount of the consulting engineer's fee to be reimbursed to NTMWD is estimated to be $19,300. Interlocal Agreement -North Texas Municipal Water District (NTMWD) 36" Water Transmission Pipeline from Wylie to Lavon Page 1 of 2 4. Reimburse the NTMWD for the costs associated with the NTMWD's construction inspector incurred during the construction of the 36 -inch pipeline relocation. The amount of the inspection cost to be reimbursed to NTMWD is estimated to be $3,850. ARTICLE II. NTMWD hereby agrees to the following: 1. Provide for the engineering, plans, specifications, inspection, construction and administration of the project. 2. Prepare easement documents, if necessary, to be executed by the City of Wylie and NTMWD. 3. Provide for the costs associated with the relocation of approximately 105 feet of NTMWD's 36 -inch water transmission pipeline currently adjacent to the north right -of -way of Brown Street. 4. Provide for the costs associated with the NTMWD's construction inspector incurred during the construction of the 36 -inch pipeline relocation constructed for NTMWD's purposes. 5. Allow Wylie's representative (or inspector) access at any time to inspect areas of work being performed. 6. Request in writing, reimbursement for the pipeline relocation including engineering, plans, specifications, inspection, construction and administration of the project. Executed this day of , 2013, by the City of Wylie, pursuant to City Council Resolution No. 22(R), and executed this day of 2013, by North Texas Municipal Water District. CITY OF WYLIE, TEXAS Mindy Manson, City Manager Carole Ehrlich, City Secretary NORTH TEXAS MUNICIPAL WATER DISTRICT James M. Parks, Executive Director /General Manager Interlocal Agreement -North Texas Municipal Water District (NTMWD) 36" Water Transmission Pipeline from Wylie to Lavon Page 2 of 2