Loading...
04-22-1999 (Citizens Bond Advisory Committee) Everything You've Ever Wanted to Know About 1999 Bond Election-Publication The City of Wylie Citizens Bond Advisory Committee invites you to: "Everything You 've Ever Wanted to �' g Know About the City of Wylie 1999 BOND ELECTION, But Were Afraid to Ask " Find out about: - What will $4.00 a month buy? - McMillen Road, FM 544 improvements? Really? -Which streets won't be under construction -What exactly is "Inflow and Infiltration" and why do we care? -"Drainage Improvements and You" or "Why should I vote for $1 .2 million in drainage improvements?" -Who is the TNRCC and what's this about our Pump Stations? -Ballfield lights: If you build them. . . .;,-.,:<.,,.,:..,-.,,,,r c� ,.•..;.;r.�'.;`�:':�:�::`::::'::��.'•:t"':"f'ii'ir'i�i'.��i.«�r�irTfirii?rr r7'inir7. "�i'i�r7rrrnrr.ti..�..«.v,rr.s r.y}t{{3:::rr'G,.,i 4}w::'r..r.'aiii.':::::'}X:};°r•;;:;•;r:':i;:::`;��'•::�::;"�;:•'.;;:i�.;aa{1r1;�ii.}}}v.ti.....................:::::::::::•.:•:.�::...�..:::•::�.::::••:.::::::::•.. Thursday, April22, 1999 7:00pm Southfork Clubhouse • ''''''''':::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: Information will be presented on the Projects included within each of the 4 Bond Propositions to assist you in making your decision May 1, 1999 Exercise Your Right to Vote! PROPOSITION 1 $15,910,000 for Street Improvements Alanis Drive from Century Way to S. Ballard; $3,700,000 3 lanes; 36' concrete pavement Kirby Street from SH 78 to Birmingham; $900,000 4 lane divided; 48' concrete pavement Stone Road from Birmingham to Ballard; $965,000' 4 lane divided; 48' concrete pavement, signals, ROW (Tier 2 County Bond - County estimate used) Stone Road from Ballard to Akin; $2,000,000 4 lane divided; 48' concrete pavement (Tier 1 County Bond - 2 lane reconstruction - $600,000) S. Ballard from Stone to Alanis; $2,600,000 4 lane divided; 48' concrete pavement Traffic Control Improvements - City wide; $750,000 Signals on FM 544, Brown; Traffic Calming on Westgate, Oak & Ballard Alley Improvements - City wide including; $600,000 Areas including Ballard, Stoneybrook, Hilltop & Willow Way Street Improvements - City wide including; $390,000 McMillen - asphalt overlay, Industrial Court - concrete repair, Third St. - reconstruction Median/Landscape Improvements $70,000 Sidewalk Improvements - City wide including; $500,000 new sidewalks to connect existing areas, reconstruction of sidewalks in poor condition CONSTRUCTION TOTAL $12 475,000 PROPOSITION 2 $1,280,000 for Drainage Improvements Hensley Lane Close portion of Hensley, install $50,000 temporary cul-de-sacs Valentine Park Channel - Continue improvements to $100,000 the west including reshaping channel and adding riprap •Stone Road installation of Culverts and•excavation of $125,000 •ditches north and south side of Stone Channel between First Street & Second Street - $175,000 concrete lined drainage channel Rustic'Oaks Channel - Install underground storm $450,000, drain, leave'open earthen-lined channel above to provide additional capacity Graham Court - Install swales to divert flow $7,500 •Presidential Estates - Remove existing structure and $100;000 extend;earthen-lined channel south Foxwood Lane cul-de-sac - Install swales to divert $20,000 flow Brown Street, east of Kreymer- Remove old concrete $200,000 drainage basins and replace with 84" drainage pipe CONSTRUCTION TOTAL $1,227,500 PROPOSITION 3 $750,000 for Park Improvements Community Park'- Soccer Field Lights (3 poles) $90,000> Community Park - Sidewalks, drainage improvements $50,000 Community Park'- One mile walking path $75,000 Founders Park - Baseball/Softball lights - 2 fields $250,000 Founders Park - Soccer field lights (8 poles) $250,000 CONSTRUCTION TOTAL $715,000 PROPOSITION 4 $4,250,000 for Water & Sewer Improvements Rush Creek Lift Station - Rehab, replace and relocate $1,000,000 lift station to the south, construct new force main 8" line in alley between Ballard & Jackson (College $97,500 to Stone) - replace deteriorated line to reduce infiltration and inflow into the sewer system 8" line in alley between Second & Third (Butler to: $97,500 Park)- replace deteriorated line to reduce infiltration and inflow into the sewer system 8" line in alley between Third & Fourth (Butler to $97,500 Park)- replace deteriorated line to reduce infiltration and inflow into the sewer system 8" line in alley between Fourth & Hilltop (Butler to $97,500 Park) - replace deteriorated line to reduce infiltration and inflow into the sewer system 8" line in alley between Masters & Oak (Fourth to $30,000 Fifth) - replace deteriorated line to reduce infiltration and inflow into the sewer system 36"from Muddy Creek South - From SH 78 to $260,000 existing 36" in Woodbridge 30"from existing WWTP - From Alanis to existing $165,000 30" in Woodbridge 48"to future WWTP- From existing 48" in $755,000 Woodbridge to new Regional Waste Water Treatment Plant I & I Rehab - Infiltration and inflow program - $330,000 Priorities 2 and 3 improvements CONSTRUCTION SUBTOTAL` $2,930,000' PROPOSITION 4 $4,250,000 for Water & Sewer Improvements Continued: 8" waiter main between Third St. & Fourth St. $93a000 replace existing substandard line Pump Station Improvements - Service pump upgrades $250,000 at existing plant sites to meet TNRCC service pump requirements Utility p Re lacements/Relocations City wide SOp 000 , .. . CONSTRUCTION SUBTOTAL $843,000