04-22-1999 (Citizens Bond Advisory Committee) Everything You've Ever Wanted to Know About 1999 Bond Election-Publication The City of Wylie Citizens Bond Advisory
Committee
invites you to:
"Everything You 've Ever Wanted to
�' g
Know About the City of Wylie
1999 BOND ELECTION,
But Were Afraid to Ask "
Find out about:
- What will $4.00 a month buy?
- McMillen Road, FM 544 improvements? Really?
-Which streets won't be under construction
-What exactly is "Inflow and Infiltration" and why do we care?
-"Drainage Improvements and You" or "Why should I vote for $1 .2
million in drainage improvements?"
-Who is the TNRCC and what's this about our Pump Stations?
-Ballfield lights: If you build them. . .
.;,-.,:<.,,.,:..,-.,,,,r c� ,.•..;.;r.�'.;`�:':�:�::`::::'::��.'•:t"':"f'ii'ir'i�i'.��i.«�r�irTfirii?rr r7'inir7.
"�i'i�r7rrrnrr.ti..�..«.v,rr.s r.y}t{{3:::rr'G,.,i 4}w::'r..r.'aiii.':::::'}X:};°r•;;:;•;r:':i;:::`;��'•::�::;"�;:•'.;;:i�.;aa{1r1;�ii.}}}v.ti.....................:::::::::::•.:•:.�::...�..:::•::�.::::••:.::::::::•..
Thursday, April22, 1999
7:00pm
Southfork Clubhouse •
'''''''''::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
Information will be presented on the Projects included within each of the 4 Bond
Propositions to assist you in making your decision May 1, 1999
Exercise Your Right to Vote!
PROPOSITION 1
$15,910,000 for Street Improvements
Alanis Drive from Century Way to S. Ballard; $3,700,000
3 lanes; 36' concrete pavement
Kirby Street from SH 78 to Birmingham; $900,000
4 lane divided; 48' concrete pavement
Stone Road from Birmingham to Ballard; $965,000'
4 lane divided; 48' concrete pavement, signals, ROW
(Tier 2 County Bond - County estimate used)
Stone Road from Ballard to Akin; $2,000,000
4 lane divided; 48' concrete pavement
(Tier 1 County Bond - 2 lane reconstruction -
$600,000)
S. Ballard from Stone to Alanis; $2,600,000
4 lane divided; 48' concrete pavement
Traffic Control Improvements - City wide; $750,000
Signals on FM 544, Brown; Traffic Calming on
Westgate, Oak & Ballard
Alley Improvements - City wide including; $600,000
Areas including Ballard, Stoneybrook, Hilltop &
Willow Way
Street Improvements - City wide including; $390,000
McMillen - asphalt overlay, Industrial Court - concrete
repair, Third St. - reconstruction
Median/Landscape Improvements $70,000
Sidewalk Improvements - City wide including; $500,000
new sidewalks to connect existing areas,
reconstruction of sidewalks in poor condition
CONSTRUCTION TOTAL $12 475,000
PROPOSITION 2
$1,280,000 for Drainage Improvements
Hensley Lane Close portion of Hensley, install $50,000
temporary cul-de-sacs
Valentine Park Channel - Continue improvements to $100,000
the west including reshaping channel and adding riprap
•Stone Road installation of Culverts and•excavation of $125,000
•ditches north and south side of Stone
Channel between First Street & Second Street - $175,000
concrete lined drainage channel
Rustic'Oaks Channel - Install underground storm $450,000,
drain, leave'open earthen-lined channel above to
provide additional capacity
Graham Court - Install swales to divert flow $7,500
•Presidential Estates - Remove existing structure and $100;000
extend;earthen-lined channel south
Foxwood Lane cul-de-sac - Install swales to divert $20,000
flow
Brown Street, east of Kreymer- Remove old concrete $200,000
drainage basins and replace with 84" drainage pipe
CONSTRUCTION TOTAL $1,227,500
PROPOSITION 3
$750,000 for Park Improvements
Community Park'- Soccer Field Lights (3 poles) $90,000>
Community Park - Sidewalks, drainage improvements $50,000
Community Park'- One mile walking path $75,000
Founders Park - Baseball/Softball lights - 2 fields $250,000
Founders Park - Soccer field lights (8 poles) $250,000
CONSTRUCTION TOTAL $715,000
PROPOSITION 4
$4,250,000 for Water & Sewer Improvements
Rush Creek Lift Station - Rehab, replace and relocate $1,000,000
lift station to the south, construct new force main
8" line in alley between Ballard & Jackson (College $97,500
to Stone) - replace deteriorated line to reduce
infiltration and inflow into the sewer system
8" line in alley between Second & Third (Butler to: $97,500
Park)- replace deteriorated line to reduce infiltration
and inflow into the sewer system
8" line in alley between Third & Fourth (Butler to $97,500
Park)- replace deteriorated line to reduce infiltration
and inflow into the sewer system
8" line in alley between Fourth & Hilltop (Butler to $97,500
Park) - replace deteriorated line to reduce infiltration
and inflow into the sewer system
8" line in alley between Masters & Oak (Fourth to $30,000
Fifth) - replace deteriorated line to reduce infiltration
and inflow into the sewer system
36"from Muddy Creek South - From SH 78 to $260,000
existing 36" in Woodbridge
30"from existing WWTP - From Alanis to existing $165,000
30" in Woodbridge
48"to future WWTP- From existing 48" in $755,000
Woodbridge to new Regional Waste Water Treatment
Plant
I & I Rehab - Infiltration and inflow program - $330,000
Priorities 2 and 3 improvements
CONSTRUCTION SUBTOTAL` $2,930,000'
PROPOSITION 4
$4,250,000 for Water & Sewer Improvements
Continued:
8" waiter main between Third St. & Fourth St. $93a000
replace existing substandard line
Pump Station Improvements - Service pump upgrades $250,000
at existing plant sites to meet TNRCC service pump
requirements
Utility p
Re lacements/Relocations City wide SOp 000
, .. .
CONSTRUCTION SUBTOTAL $843,000