Loading...
Resolution 2016-05 RESOLUTION NO. 2016-05(R) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS, HEREBY AUTHORIZING THE CITY MANAGER OF THE CITY OF WYLIE, TEXAS, TO EXECUTE THE INTERLOCAL AGREEMENT BETWEEN THE NORTH TEXAS MUNICIPAL WATER DISTRICT (NTMWD) AND THE CITY OF WYLIE CONCERNING THE RECONSTRUCTION OF EUBANKS LANE FROM SH78 TO THE NTMWD ENTRANCE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS: SECTION 1: The City Manager of the City of WYLIE, Texas, is hereby authorized to execute, on behalf of the City Council of the City of WYLIE, Texas, the Interlocal agreement between NTMWD and the City of Wylie concerning the reconstruction of Eubanks Lane from SH78 to the NTMWD entrance, SECTION 2: This Resolution shall take effect immediately upon its passage. RESOLVED THIS THE 26th day of January, 2016. ERIC HOGUE,�4a ATTEST TO: � O ,� � CA OLE EHRL , City Secretary ; -SF TACP[RALW,4V a 1887° s i T4TH dF_ti%� Resolution No.2016-05(R) ILA with(NTMWD)conceming the reconstruction of Eubanks Lane from SH 78 to the NTMWD entrance. I EXHIBIT "A" Interlocal Agreement Resolution No.2016-05(R) ILA with(NTMWD)concerning the reconstruction of Eubanks Lane from S11 78 to the NTMWD entrance. 2 STATE OF TEXAS § COUNTY OF COLLIN § INTERLOCAL COOPERATION AGREEMENT BETWEEN THE CITY OF WYLIE, TEXAS AND THE NORTH TEXAS MUNICIPAL WATER DISTRICT This Interlocal Cooperation Agreement ("Agreement") is made and entered by and between the City of Wylie, Texas, a home rule municipality ("City"), and the North Texas Municipal Water District, a political subdivision of the State of Texas ("NTMWD"). City and NTMWD at times are referred to herein as a "party" or collectively as the "parties." WITNESSETH: WHEREAS, City has investigated and determined that a need exists for the design, repair, reconstruction, improvement and maintenance of Eubanks Lane from SH 78 to the entrance of the NTMWD site, located on Eubanks Lane ("Project"); and WHEREAS, Eubanks Lane is located within the corporate boundaries of City; and WHEREAS, NTMWD desires to contribute funds to pay a portion of the construction costs of the Project; and r— WHEREAS, the Interlocal Cooperation Act, codified at Section 791.001 et seq. of the Texas Government Code ("Act"), authorizes local governments to contract with one another to perform governmental functions and services under the terms of the Act; and WHEREAS, City and NTMWD find that the Project will provide a public benefit to both City and NTMWD and that a cooperative effort by City and NTMWD pursuant to the Act will more efficiently accomplish the purposes set forth herein; and WHEREAS, the parties will have current funds available to satisfy their obligations at the time those obligations become due. NOW, THEREFORE, for the mutual covenants and consideration expressed herein, City and NTMWD hereby agree as follows: 1. Description of Project. The Project consists of the design, repair, reconstruction, improvement and maintenance of Eubanks Lane from SH 78 to the entrance of the NTMWD site, located on Eubanks Lane. The Project is more particularly described in Exhibit A, attached hereto and incorporated herein for all purposes. 2. Design and Construction of Project. City shall design, construct and manage the Project. City shall provide a copy of the Project design plans to NTMWD for approval, which approval shall not be unreasonably withheld, conditioned, denied or delayed. If Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page I of 9 675667 City does not receive NTMWD's approval of the Project design plans within ninety (90) days after City submits the Project design plans to NTMWD, such Project design plans shall be deemed approved by NTMWD. 3. Project Costs. The estimated construction costs of the Project are one million six hundred thirty thousand and 00/100 Dollars ($1,630,000) (the "Estimated Construction Costs"). The phrase "actual construction costs" as used herein shall mean the construction costs, geotechnical materials testing and inspection fees associated with the Project that are actually paid by City to third-parties. The term "actual construction costs" shall not include salaries, wages, costs and/or expenses incurred by the City's staff and/or employees. The phrase "cost overruns" as used herein shall mean actual construction costs that are incurred by City in connection with the Project that are over and above the Estimated Construction Costs. 4. NTMWD's Reimbursement of a Portion of the Estimated Design and Construction Costs. NTMWD agrees to reimburse City eighty percent (80%) of the Estimated Construction Costs, or one million three hundred nineteen thousand and 00/100 Dollars ($1,319,000), plus eighty percent (80%) of the cost overruns, if any ("NTMWD's Contribution"). Within thirty (30) days of an award of a construction contract for the Project, NTMWD will tender to City NTMWD's agreed contribution to the Estimated Construction Costs. Should City incur any cost overruns in connection with the Project, City will provide NTMWD written notice of the same, and NTMWD shall reimburse City eighty percent (80%) of the cost overruns within thirty (30) days of receiving such notice from City. The parties agree that NTMWD's financial contribution to the Project shall be based on the actual construction costs incurred by City in connection with the -- Project. Within a reasonable time after receiving a reasonable request from NTMWD, City will provide NTMWD with copies of any and all documents regarding the actual construction costs of the Project. Said records documenting actual construction costs shall be maintained by the City for a period of five years after the completion of the Project and shall be made available, after a reasonable period of notice, to the NTMWD for review. 5. Deposit of NTMWD's Contribution. City will deposit NTMWD's Contribution in an interest-bearing account, which amount shall be held by City and used exclusively for payment of the actual construction costs of the Project; provided, however, that the parties agree that any and all interest earned from the interest-bearing account containing the funds deposited by NTMWD in accordance with this paragraph will be applied to the NTMWD's Contribution under this Agreement. 6. Acquisition of Easements/Rights-of-Way. City shall obtain all necessary easements and rights-of-way that are necessary for the Project. The costs and expenses associated with the acquisition of all necessary easements and rights-of-way, as contemplated in this paragraph, are not a part of the actual construction costs of the Project. 7. Relocation of Utilities. City shall be responsible for coordinating any necessary relocation of utilities that may be required to commence and successfully complete the Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 2 of 9 675667 Project. The costs and expenses associated with the relocation of any necessary utilities, as contemplated in this paragraph, are not a part of the actual construction costs of the Project. 8. Maintenance. Upon completion of the Project, City shall be solely responsible for the continued maintenance of the Project after completion. 9. Ownership of Easements/Improvements. Any and all easements obtained and improvements constructed pursuant to this Agreement shall, at all times, remain the sole property of City. NTMWD shall not, at any time, have or claim any ownership interest in the easements obtained or improvements constructed in connection with the Project. 10. Term. This Agreement shall commence on the Effective Date and remain in full force and effect until the Project has been completed and accepted by City or unless terminated as provided herein. 11. Remedies. Failure of Project; Limitation of Liability. If, for any reason other than default by NTMWD, the Project is not pursued to completion, NTMWD agrees that its sole remedy, and City's sole liability to NTMWD, is the return of any monies paid by NTMWD to City pursuant to this Agreement, less the actual construction costs already expended by the City at the time of default. If the Project is not pursued to completion as a result of NTMWD's default of this Agreement. City agrees that its sole remedy, and NTMWD's sole liability to City, shall be recovery from NTMWD in an amount limited to 80% of the actual construction costs. The parties expressly waive their rights to the recovery from one another of incidental and/or consequential damages. 12. Miscellaneous. a. Notice. Any notice provided or permitted to be given under this Agreement must be in writing and may be served by depositing same in the United States Mail, addressed to the Party to be notified, postage pre-paid and registered or certified with return receipt requested; by facsimile; by electronic mail, with documentation evidencing the addressee's receipt thereof; or by delivering the same in person to such Party a via hand-delivery service, or any courier service that provides a return receipt showing the date of actual delivery of same to the addressee thereof. Notice given in accordance herewith shall be effective upon receipt at the address of the addressee. For purposes of notification, the addresses of the parties shall be as follows: If to City, addressed to it at: City of Wylie Attn: Mindy Manson Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 3 of 9 675667 300 Country Club Road Wylie, Texas 75098 Telephone: (972) 516-6006 Facsimile: (972) 516-6026 Email: miiiciN._m�inso»'ii xvy_lieteras.(-loy� with a copy to: Abernathy, Roeder, Boyd& Hullett, P.C. Attention: Ryan D. Pittman 1700 Redbud Blvd., Suite 300 McKinney, Texas 75069 Telephone: (214) 544-4000 Facsimile: (214) 544-4044 Email: ' tman�bernatlhy-law.com If to NTMWD, addressed to it at: North Texas Municipal Water District Attn: Judd Sanderson 505 E. Brown Street Wylie, Texas 75098 Telephone: (972) 442-5405 Email:jsaiidersoiva litmwd.conl with a copy to: --- Saunders Walsh & Beard Attention: Mark A. Walsh 6850 TPC Drive, Suite 210 McKinney, Texas 75070 Telephone: (214) 919-3555 Facsimile: (214) 615-9019 Email: n7arki�l,sai.inders�k ilsh.com b. Assignment. This Agreement is not assignable. C. Entire Agreement. This Agreement contains the entire agreement of the parties with respect to the matters contained herein and may not be modified or terminated except upon the provisions hereof or by the mutual written agreement of the parties hereto. d. Governing LawNenue. The laws of the State of Texas shall govern the interpretation, validity, performance and enforcement of this Agreement, without regard to conflict of law principles. This Agreement is performable in Collin County, Texas, and the exclusive venue for any action arising out of this Agreement shall be a court of appropriate jurisdiction in Collin County, Texas. low Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 4 of 9 675667 e. Consideration. This Agreement is executed by the parties hereto without coercion or duress and for substantial consideration, the sufficiency of which is w forever confessed. f. Multiple Counterparts. This Agreement may be executed in a number of identical counterparts, each of which shall be deemed an original for all purposes. An electronic mail and/or facsimile signature will also be deemed to constitute an original if properly executed and delivered to the other party. g. Authority to Execute. The individuals executing this Agreement on behalf of the respective parties below represent to each and to others that all appropriate and necessary action has been taken to authorize the individual who is executing this Agreement to do so for and on behalf of the party for which his or her signature appears, that there are no other parties or entities required to execute this Agreement in order for the same to be an authorized and binding agreement on the party for whom the individual is signing this Agreement and that each individual affixing his or her signature hereto is authorized to do so, and such authorization is valid and effective on the date hereof. h. Savings/Severability. In the event that a term, condition or provision of this Agreement is determined to be invalid, illegal, void, unenforceable or unlawful by a court of competent jurisdiction, then that term, condition or provision shall be deleted and the remainder of the Agreement shall remain in full force and effect as if such invalid, illegal, void, unenforceable or unlawful provision had never �-- been contained in this Agreement. i. Representations. Each party represents that it has carefully read this Agreement, knows the contents hereof, has consulted with an attorney of its choice regarding the meaning and effect hereof and is signing the same solely of its own judgment. j. Responsibilities. The parties agree that neither party is an agent, servant, or employee of the other party and that each party is responsible for its individual acts and deeds, as well as the acts and deeds of its contractors, employees, representatives and agents. The parties agree that the Project is not a joint venture or joint enterprise. k. Immunity. The parties acknowledge and agree that, in executing and performing this Agreement, the parties have not waived, nor shall be deemed to have waived, any defense or immunity, including governmental, sovereign and official immunity, that would otherwise be available to them against claims arising in the exercise of governmental powers and functions. By entering into this Agreement, the parties do not create any obligations, express or implied, other than those set forth herein. 1. No Third Party Beneficiaries. Nothing in this Agreement shall be construed to create any right in any third party not a signatory to this Agreement, and the Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 5 of 9 675667 parties do not intend to create any third party beneficiaries by entering into this Agreement. in. Miscellaneous Drafting Provisions. This Agreement shall be deemed drafted equally by all parties hereto. The language of all parts of this Agreement shall be construed as a whole according to it fair meaning, and any presumption or principle that the language herein is to be construed against any party shall not apply. Headings in this Agreement are for the convenience of the parties and are not intended to be used in construing this document. [Signature page follows.] Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 6 of 9 675667 IN WITNESS WHEREOF. the parties have executed this Agreement and caused this Agreement to be effective when all the parties have signed it. The date this Agreement is signed by the last party to sign it (as indicated by the date associated with that party's signature below) will be deemed the effective date of this Agreement ("Effective Date"). CITY OF WYLIE, TEXAS, a home-rule municipality By: Mindy Manson, City Manager Date: ATTEST: Carole Ehrlich. City Secretary NORTH TEXAS MUNICIPAL WATER DISTRICT, a political subdivision of the State of Texas By: Print Name: Title: Date: ATTEST: Print Name: Title: Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 7 of 9 675667 STATE OF TEXAS § COUNTY OF COLLIN § BEFORE ME, the undersigned authority, on this day personally appeared MINDY MANSON, known to me to be one of the persons whose names are subscribed to the foregoing instrument; she acknowledged to me that he is the City Manager and duly authorized representative of the CITY OF WYLIE, TEXAS, a home-rule municipality, and that she executed the same for the purposes and consideration therein stated and in the capacity therein stated as the act and deed of the CITY OF WYLIE, TEXAS. IN WITNESS WHEREOF, I have hereunto set my hand and seal of office this day of 12015. Notary Public, State of Texas My Commission Expires: STATE OF TEXAS § COUNTY OF COLLIN § BEFORE ME, the undersigned authority, on this day personally appeared , known to me to be one of the persons whose names are subscribed to the foregoing instrument; he acknowledged to me that he is the and duly authorized representative of the NORTH TEXAS MUNICIPAL WATER DISTRICT, a political subdivision of the State of Texas, and that he executed the same for the purposes and consideration therein stated and in the capacity therein stated as the act and deed of the NORTH TEXAS MUNICIPAL WATER DISTRICT. IN WITNESS WHEREOF, I have hereunto set my hand and seal of office this day of , 2015. Notary Public, State of Texas My Commission Expires: Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 8 of 9 675667 Exhibit A Project Description Interlocal Cooperation Agreement—Eubanks Lane Improvements Funding Page 9 of 9 675667 W r, t al470 s l� i � HMEMM r _ F l000r, m AL r� s A� Eubanks Lane Paving and Drainage Improvements PRELIMINARY OPINION OF CONSTRUCTION COST Item No. Description Qty I Unit Price Amount Project Description: A 4-lane Undivided Thoroughfare,11- ft.lanes,10-inch Reinforced Concrete Pavement with 12- inch Subgrade,Curbs and Underground Storm Drainage Segment 1: SH 78 to South Side of RR Crossing Project Length 860 L.F. Width 45 B-B 1 Right-of-way Preparation 9 Sta. $ 5,000.00 $ 43,000 2 Unclassified Excavation 2,994 C.Y. $ 12.00 $ 35,929 3 12-inch Lime Treated Subgrade 4,491 S.Y. $ 5.00 $ 22,456 4 Hydrated Lime @ 65#/S.Y. 146 Tons $ 170.00 $ 24,813 5 6-inch Monolithic Concrete Curb 1,720 L.F. $ 2.00 $ 3,440 6 10-inch Reinforced Concrete Pavement 4,300 S.Y. $ 50.00 $ 215,000 7 Reinforced Concrete Driveways(30'wide x 25'deep) 83 S.Y. $ 45.00 $ 3,750 8 Side Street Concrete Transition(38'wide x 50'deep) 211 S.Y. $ 45.00 $ 9,500 9 Remove Existing Concrete Pavement 2,102 S.Y. $ 12.00 $ 25,227 10 Finish Grade and Sodding 2,293 S.Y. $ 7.00 $ 16,053 11 5-foot Wide Reinforced Concrete Sidewalk 478 S.Y. $ 45.00 $ 21,500 12 Handicap Ramps 2 Ea. $ 1,500.00 $ 3,000 13 SH78 Right Turn Lane(100%NTMWD construction) 1 Ea. $ 75,000.00 $ 75,000 Paving Improvements Subtotal: $ 498,668 14 Junderground Storm Drainage Improvements 30% of Paving Improvements $ 149,600 Drainage Improvements Subtotal: $ 149,600 15 Signalization Improvements 1 L.S. $ 75,000.00 $ 75,000 16 Landscaping and Irrigation Improvements(Not Included) $ - 17 Street Lighting Improvements(Not Included) $ - Aesthetics and Signalization Subtotal: $ 75,000.00 Paving,Drainage,Signalization: $ 723,268 Contingency: 15% $ 108,490 Opinion of Probable Construction Cost: $ 830,000 Construction Cost per Linear Foot: $ 965.12 Item No. Description Qty Unit Price Amount Project Description: A 4-lane Undivided Thoroughfare,11- ft.lanes,10-inch Reinforced Concrete Pavement with 12- inch Subgrade,Curbs and Underground Storm Drainage Segment 2: RR Crossing Project Length 150 L.F. Width 45 B-B 1 RR Crossing 1 L.S. $500,000.00 1 $ 500,000 2 Observation and Flagging 1 L.S. $ 30,000.00 $ 30,000 Paving Improvements Subtotal: $ 530,000 Paving,Drainage,Signalization: $ 530,000 Contingency: 15% $ 79,500 Opinion of Probable Construction Cost: $ 610,000 Construction Cost per Linear Foot: $ 4,066.67 12/21/2015 Item No. Description I Qty I Unit Price Amount Project Description: A 4-lane Undivided Thoroughfare,11- ft.lanes, 10-inch Reinforced Concrete Pavement with 12- inch Subgrade,Curbs and Underground Storm Drainage Segment 3: RR Crossing to North Side of NTMWD Entrance Project Length 215 L.F. Width 45 B-B 1 Right-of-way Preparation 2 Sta. $ 5,000.00 $ 10,750 2 Unclassified Excavation 749 C.Y. $ 12.00 $ 8,982 3 12-inch Lime Treated Subgrade 1,123 S.Y. $ 5.00 $ 5,614 4 Hydrated Lime @ 65#/S.Y. 36 Tons $ 170.00 $ 6,203 5 6-inch Monolithic Concrete Curb 860 L.F. $ 2.00 $ 1,720 6 10-inch Reinforced Concrete Pavement 1,075 S.Y. $ 50.00 $ 53,750 7 Reinforced Concrete Driveways(18'wide x 25'deep) 100 S.Y. $ 45.00 $ 4,500 8 Side Street Concrete Transition(100'wide x 50'deep) 560 S.Y. $ 45.00 $ 25,200 9 Remove Existing Concrete Pavement 100 S.Y. $ 12.00 $ 1,200 10 Finish Grade and Sodding 573 S.Y. $ 7.00 $ 4,013 11 5-foot Wide Reinforced Concrete Sidewalk 119 S.Y. $ 45.00 $ 5,375 12 lHandicap Ramps 2 Ea. $ 1,500.00 $ 3,000 Paving Improvements Subtotal: $ 130,000 13 Junderground Storm Drainage Improvements 30% of Paving Improvements $ 39,000 Drainage Improvements Subtotal: $ 39,000 14 Signalization Improvements(Not Included) $ - 15 Landscaping and Irrigation Improvements(Not Included) $ 16 Street Lighting Improvements(Not Included) $ Aesthetics and Signalization Subtotal: $ - Paving,Drainage,Signalization: $ 169,000 Contingency: 15% $ 25,350 Opinion of Probable Construction Cost: $ 190,000 Construction Cost per Linear Foot: $ 883.72 Total Opinion of Probable Construction Cost(Segments 1-3): $ 1,630,000 Engineering,Surveying,ROW Documents,and Geotechnical: 12% $ 200,000 Testing $ 15,000 Right of Way 2.81 Ac. $ 50,000.00 $ 140,000 Right of Way Acquisition 8 Parcels $ 4,000.00 $ 32,000 Total Project Costl $ 2,017,000 12/21/2015 PROJECT COST SHARE City of Wylie NTMWD %Share $ %Share $ TOTAL Segment 1-SH78 to RR Crossing 20% $ 151,000 80% $ 604,000 $ 755,000 Segment 1-Deceleration and right turn lane 0% 100% $ 75,000 $ 75,000 Segment 2-RR Crossing 20% $ 122,000 80% $ 488,000 $ 610,000 Segment 3-RR Crossing to NTMWD Entrance 20% $ 38,000 80% $ 152,000 $ 190,000 Segment 1-3-Engineering and ROW 100% $ 387,000 0% $ - $ 387,000 TOTAL 35% $ 698,000 65% $ 1,319,000 $ 2,017,000 Cost Estimate with cost share 12/28/2015