Loading...
Ordinance 1986-87 ORDINANCE NO. 8'6- ?7 AN ORDINANCE AMENDING ORDINANCE 84-12, THE FEE ORDINANCE OF THE CITY OF WYLIE, AMENDING PROVISIONS IN SECTION 1, PARAGRAPH "H", CONSTRUCTION METER CHARGES, SUB-PARAGRAPHS a AND b; AND CREATING A NEW PARAGRAPH "M", SECTION 1, DEVELOPMENT WATER CHARGES; AND CREATING A NEW SECTION 12 "OTHER MISCELLANEOUS FEES AND CHARGES"; AND RENUMBERING SECTIONS 12, 13 & 14 TO SECTIONS 13, 14 & 15, PROVIDING SEVERABILITY, PROVIDING FOR AN EFFECTIVE DATE; PROVIDING FOR PUBLICATION. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WYLIE THAT: SECTION 1. WATER & SEWER H. CONSTRUCTION METER CHARGES a. WILL READ: "Building contractors requesting a water meter and service during construction shall be charged the standard account and installation fees, plus deposits the same as any other customer of the City of Wylie. Said builder shall receive a monthly bill for each month of service until service is discontinued at his request or the service is transferred to a new customer at that address with the account in a current status." b. WILL READ: "Any contractor, individual, or company, requesting a meter attachment to a fire hydrant for any purpose shall pay a deposit of $750.00 for the meter and water consumption, if the City is to provide the meter. In the case where the individual provides his own meter, the deposit shall be $250.00 for the water consumption. Each account will be established as a normal account through the utility billing office and shall be billed on a monthly basis the same as any other customer of the City of Wylie. It shall be the obligation of the customer to either present the meter for reading at the utility billing office or indicate to that office the meter location so that it may be read at least once in each thirty (30) day cycle." M. DEVELOPMENT/SUBDIVISION WATER CHARGES All developers or subdividers who are tieing into the water and sewer system of the City of Wylie shall pay an initial fee equivalent to the gallon capacity of their water system distribution lines multiplied by a factor of three at the prevailing rate per 1000 gallons of the lowest rate per 1000 currently in effect at the time actual usage occurs. The final determination of the amount of gallons to be charged shall be determined by the City Engineer. Any water used subsequent to the initial loading and flushing of the installed lines shall be accomplished by the developer or subdivider securing a meter attachment to a fire hydrant (see provisions in Section 1. subparagraph b.) This fee shall due and payable prior to approval of the final plat. SECTION 12. OTHER FEES AND MISCELLANEOUS CHARGES 1. Cost for replacement box.......$15.00. plastic water meter 2. Cost for replacement of property line sewer clean- out cap........$5.00 SEVERABILITY: All ordinances or parts of the ordinance in conflict herewith are specifically repealed and are superceded by this ordinance. All other parts of such ordinances are not repealed. PUBLICATION: This ordinance shall be published one time in the official newspaper of the City of Wylie. EFFECTIVE DATE: This ordinance shall become effective on the first day of November ninteen hundred and eighty six. (November 1, 1986.) OF THE CITY OF WYLIE ON THIS THE 1986.