08-10-2020 (Parks & Recreation) Agenda Packet Parks and Recreation Board
MY OF
NOTICE OF MEETING
Meeting Agenda
August 10, 2020 — 6:30 p.m.
Wylie Municipal Complex— Council Chambers
300 Country Club Road, Building #100
Wylie, Texas 75098
Joni Robinson Chair
Gloria Suarez Vice-Chair
Brett Swendig Board Member
Brian Willeford Board Member
Craig Allen Board Member
Kim Mullis Board Member
Kevin Stewart.............................. Board Member
Robert Diaz Parks and Recreation Director
Richard Abernathy........................................................City Attorney
Janet Hawkes Board Secretary
In accordance with Section 551.042 of the Texas Government Code, this agenda has been posted at the Wylie
Municipal Complex, distributed to the appropriate news media, and posted on the City website: www.wvlietexas.gov
within the required time frame. As a courtesy, the entire Agenda Packet has also been posted on the City of Wylie
website: www.wylietexas.gov.
The Board requests that all cell phones and pagers be turned off or set to vibrate. Members of the audience are
requested to step outside the Council Chambers to respond to a page or to conduct a phone conversation.
The Wylie Municipal Complex is wheelchair accessible. Sign interpretation or other special assistance for disabled
attendees must be requested 48 hours in advance by contacting the City Secretary's Office at 972.516.6020.
Hearing impaired devices are available from the City Secretary prior to each meeting.
CALL TO ORDER
Announce the presence of a Quorum
CITIZENS COMMENTS ON NON-AGENDA ITEMS
Residents may address the Board regarding an item that is not listed on the Agenda. Residents must fill out a non-
agenda form prior to the meeting in order to speak. The Board requests that comments be limited to three(3)
minutes. In addition, the Board is not allowed to converse, deliberate or take action on any matter presented during
citizen participation.
August 10,2020 Wylie Parks and Recreation Meeting Agenda Page 2 of 2
REGULAR AGENDA
1. Consider and act upon approval of the Minutes from July 13, 2020 meeting.
2. Consider and act upon recommending the Founders Park Master Plan.
DISCUSSION ITEMS
• Future projects.
• Current projects update.
EXECUTIVE SESSION
If during the course of the meeting covered by this notice,the Parks and Recreation Board should determine that a closed or executive meeting or
session of the Parks and Recreation Board or a consultation with the attorney for the City should be held or is required,then such closed or executive
meeting or session or consultation with attorney as authorized by the Texas Open Meetings Act,Texas Government Code§551.001 et.seq.,will
be held by the Parks and Recreation Board at the date,hour and place given in this notice as the Parks and Recreation Board may conveniently
meet in such closed or executive meeting or session or consult with the attorney for the City concerning any and all subjects and for any and all
purposes permitted by the Act,including,but not limited to,the following sections and purposes:
Texas Government Code Sections:
§551.071—Private consultation with an attorney for the City.
§551.072—Discussing purchase,exchange,lease or value of real property.
§551.073—Discussing prospective gift or donation to the City.
§551.076—Discussing deployment of security personnel or devices or security audit.
ADJOURNMENT
CERTIFICATION
1 certify that this Notice of Meeting was posted on August 7, 2020 at 5:00 p.m. as required by law in accordance with
Section 551.042 of the Texas Government Code and that t7he appropriate news media was contacted. As a courtesy,
this agenda is also posted on the City of Wylie website: www.wylietexas.gov.
Stephanie Storm,City Secretary Date Notice Removed
= ..:)i-
Parks and Recreation Board
Meeting Minutes
Monday,July 13,2020—6:30 p.m.
Wylie Municipal Complex
300 Country Club Road#100
Wylie,Texas 75098
CALL TO ORDER
Board Chairperson Robinson called the meeting to order at 6:30 p.m. with Board Member Swendig,
Board Member Suarez, Board Member Willeford, Board Member Mullis, and Board Member Stewart in
attendance. Board Member Allen arrived late to the meeting at 6:39 p.m.
Staff members present were Parks and Recreation Director Robert Diaz and Parks Board Secretary Janet
Hawkes.
CITIZENS PARTICIPATION
No citizens came forward.
ELECTION OF BOARD CHAIR AND VICE-CHAIR
Board Member Suarez nominated Board Chairperson Robinson to serve again as Board Chair. Board
Member Swendig seconded the motion, and a vote was taken and passed 6-0.
Board Chairperson Robinson nominated Board Member Suarez to serve as Board Vice-Chair. Board
Member Swendig seconded the motion, and a vote was taken and passed 6-0.
REGULAR AGENDA ITEMS
1. Consider and act upon approval of the Minutes from the June 8, 2020
Meeting.
Board Action:
Board Member Swendig made a motion to approve the Minutes from the June 8, 2020 Meeting.
Board Member Willeford seconded the motion, and a vote was taken and passed 6-0.
DISCUSSION ITEMS
• Parks and Recreation Board welcome presentation.
Board Chairperson Robinson led a welcome introduction to the Parks and Recreation Board that
included introducing incoming Board Members Kim Mullis and Kevin Stewart. She mentioned
that a possible Parks and Recreation Board tour will be planned for all Board Members in the fall.
The tour will serve as an opportunity for Board Members to visit many of the Parks and
Recreation Department's parks, amenities, and facilities.
Director Diaz briefly went over the City mission, vision and values, as well as the Parks and
Recreation Chapter 78 in the City Charter and the Parks and Recreation Board Bylaws. He noted
that Prohibited Acts located in Chapter 78 of the City Charter are in the process of review by our
City Attorney and possible updates will be forthcoming.
Director Diaz encouraged the Board to view online the Master Plan story-map, developed as part
of the Parks and Recreation Master Plan. The story map is located in the"Maps" section of the
City of Wylie website. He stated that the story-map gives viewers an overview of the Parks and
Recreation Master Plan utilizing GIS maps and other visuals.
Director Diaz reviewed the Parks and Recreation Master Plan pointing out the highlights and
purpose of the plan looking at both developed and undeveloped City property. The plan shows
conceptual development of the Municipal Complex, plans for developing Braddock Park and
Parkside Park, and development and management of two park areas at Lavon Lake. Priority
rankings were developed using input from staff, a steering committee and public meetings, with
60 percent of the list based on the Citizen's survey results. Top priority rankings are as follows: 1)
hike and bike trails connected throughout the City, 2)a spray-ground amenity, 3)expansion
amenities at Lavon Lake, 4) hike/bike/walk nature trails along the Lavon Lake and dam, 5) indoor
aquatic center, 6)outdoor aquatic center, 7) special events amenities within the parks, 8)
additional park/trail lighting, 9) multipurpose athletic fields, 10)additional athletic practice fields,
and 11) more park benches and sitting areas.
• Parks Acquisition and Improvement Fund review and future projects.
Director Diaz explained that Acquisition and Improvement(A&I)fund is money developers are
required to pay the city and can only go towards the development of parks.
Director Diaz advised the Board that the beginning fiscal year 2018 fund balance for all zones
was $448,123. The total fund balance for all zones based on actual as of March 27, 2020 was
$747,247 with an estimated fund balance of$448,711 as of September 30, 2020 for all
zones. Projects anticipated to be completed in fiscal year 2019/2020 include the Twin Lakes
Park Trail, Braddock Park Concept Plan, Parkside Park Concept Plan, and the Avalon Park fence
project. Potential projects for fiscal year 2020/2021 include the aquatics feasibility study, a Lavon
Lake study, and a trail connection project from the new Collin College to the Municipal Complex
Trail. Potential projects for fiscal year 2021-2022 include lighting at the Municipal Trail as well as
a playground for Twin Lakes Park.
• Review of the Founders Park Master Plan
Director Diaz presented the Founders Park Master Plan stating that the ten-year old park, located
just behind Wylie High School, is Wylie's highest use athletic park utilized by Wylie football,
softball and soccer leagues. The Founders Park Master Plan focuses mainly on increased
parking throughout, improved football and soccer fields, larger plaza areas, shortened softball
field's C and D reduced from 300 feet to 250 feet each, the development of improved road access
through the park, and the addition of an all-inclusive playground to the replace the aging Pirate
Cove Playground. The Founders Park Master Plan estimated cost are as follows: phase one
$5,267,438; phase two $5,236,684; phase three $4,726,548; phase four$710,498; and a grand
total estimated cost of$15,941,169 inclusive of all four phases.
• Projects update.
Director Diaz updated the Board on the current and ongoing Parks projects. The Parks,
Recreation, and Open Space Master Plan, Municipal Complex Master Plan, Braddock Park
Concept Park Plan, and Parkside Park Concept Park Plan have been completed by Dunaway
and Associates and were all adopted by City Council in June 2020. The Twin Lakes/Southbrook
Trail connection project has begun with an expected completion date of the fall 2020. The Wylie
Recreation Center Feasibility Plan was completed and reviewed by the Parks and Recreation
Board during the June 2020 meeting. Staff is working on construction documents for Phase 1
improvements to the Thomas and Mattie Brown House with the project's expected completion
date to be fall of 2020. The accessible lift and possible ramp location at the Thomas and Mattie
Minutes July 13, 2020
Wylie Parks and Recreation Board Meeting
Page 2
Brown House were reviewed and approved by the Historical Review Commission. New
playgrounds at Kirby Park and Friendship Park were installed and opened to the public. The
Avalon Park fence project contract was finalized and staff is awaiting a start date from the vendor.
• Parks and Recreation Month.
Director Diaz noted that July is Parks and Recreation Month and this year many activities were
modified due to the COVID-19 pandemic. Activities can be found in the Summer Activity Menu.
ADJOURNMENT
There being no further business, a motion to adjourn was made by Board Member Swendig. Board
Member Suarez seconded the motion, and a vote was taken and passed 7-0. The meeting was
adjourned at 8:10 p.m.
ATTEST
Janet Hawkes, Parks Board Secretary Joni Robinson, Parks Board Chairperson
Minutes July 13, 2020
Wylie Parks and Recreation Board Meeting
Page 3
Parks and Recreation Board
AGENDA REPORT
Meeting Date: August 10, 2020 Item Number:
Department: Parks and Recreation (City Secretary's Use Only)
Prepared By: Robert Diaz Account Code:
Date Prepared: August 6, 2020 Exhibits: Multiple slides attached.
Subject
Consider and act upon recommending the Founders Park Master Plan.
Recommendation
Motion to consider and act upon recommending the Founders Park Master Plan.
Discussion
Parks and Recreation staff have been working with consultants Halff Associates on an updated parks master plan for
Founders Park. Phase 1 of Founders Park was completed as part of a city bond program in the late 1990's and it consisted
of some parking, west side soccer fields, and two softball fields. Phase 2 of Founders Park was part of the 2005 city bond
program and it expanded the offerings to accommodate additional parking, pavilions, restroom/concession facilities, and
doubled our field capacity for soccer, softball, and also added football.
The focus of this master plan and third phase of Founders Park was patron safety. Halff Associates worked with Parks
staff on how the park is currently utilized and how park patrons can safely access all of the current park amenities. The
updated plan currently shows development of four phases that create better patron access to all parts of the park. The plan
creates a better north/south access road from Wylie Stadium to Hensley Lane. In addition to better access, the update
features additional playing fields, additional parking, event/plaza areas, additional restroom/concession facilities,
additional trail, use of undeveloped parkland in the northeast and southern portions of the park, and the update of Pirate
Cove Playground to an all-inclusive playground.
The consultant also created some estimate budgets for each of the development phases, and the total estimated budget for
the update is approximately $16 million. The consultant did use the currently adopted Parks, Recreation, and Open Space
Master Plan as a guide for development.
The purpose of this agenda item is to approve the elements of the plan and formal recommendation. This
recommendation will be used with the City Council and possible Bond Committee for future development.
Page 1 of 1
1201 North Bowser Road
Richardson,Texas 75081 EWE
(214)346-6200 now HALFF
Fax(214)739-0095
Project:Founders Park Master Plan
Owner/Client: City of Wylie
Halff AVO: 37634
Date:06/03/2020
PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST(MASTER PLAN)
**ALL 2020 BASE BID TOTALS INCLUDE A 20%CONTINGENCY
PHASE TOTAL ESTIMATED COST TOTAL PROJECTED ESTIMATE WITH INFLATION
2021* 2022* 2023* 2024* 2025* 1
PHASE 1 $ 5,267,438.40 $ 5,425,461.55 $ 5,588,225.40 $ 5,755,872.16 $ 5,928,548.33 $ 6,106,404.78
PHASE 2 $ 5,236,684.80 $ 5,393,785.34 $ 5,555,598.90 $ 5,722,266.87 $ 5,893,934.88 $ 6,070,752.92
PHASE 3 $ 4,726,548.00 $ 4,868,344.44 $ 5,014,394.77 $ 5,164,826.62 $ 5,319,771.41 $ 5,479,364.56
PHASE 4 $ 710,498.40 $ 731,813.35 $ 753,767.75 $ 776,380.79 $ 799,672.21 $ 823,662.37
GRAND TOTAL 20 $ 15,841,1'69,60 $16,419,401169 $ 46,9413986.834 IIIII .....
*Projected inflation costs are approximated at 3%per year
1201 North Bowser Road
Richardson,Texas 75081
(214)346-6200 MMM
Fax(214)739-0095
Project: Founders Park Master Plan
Owner/Client: City of Wylie
Halff AVO: 37634
Date:06/03/2020
t,}
Founders Park Master Plan - Estimate of Probable Cost (PHASE 1)
t: r t:t.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,4r 1 �,F}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,:k n t F 3:is i i i.i• i i.i• i i.i• i i.i• i i.i• i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i is ii 1£+5.rat.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t. ,S,r,}r.,,:,,,
„ r, .�,..z.J t z t ..t ..t
3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, r x4 x4 x4 x4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4�`t's,4`�F$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t<J f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f �.,s t.)�:..:n,f.t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t .t .t l :t,t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t . a:s�`8�:s`�» : .tfi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi�fi��t ,.l �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t t}, ,,r7 r f J 2 £r%t� sou 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3:. 3:. 3. ! i ,::,1�.t 1 4 t4..: ,,:4a )�.a i,<.;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r< t,r >;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>„
Fay L� t t t t t t t t t t t t t t t t t t t t t t t t it it�.�,r4,.,.a,t .`•••s., k S t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t.
t : «r1 I � t 1�r•., 4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4 .2 4.r r �U>rs,o.rS .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t tt,.�rJ..,<�t. a.,I: r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r. �} +a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a,r,:..{ � J l« slF t t t t t t t t t t t t t t t t t t t t t t t t
c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c. i'.�l .S Jar.
2 c. S r s c, { c n< ,f t.5 .1 F
u:,
t
}, ., �'3: �z s }:. ,...,,J 4,..€,: 1 ,,;;. ,,.<„=I:ns.s?:zs?:zs?:zs?. art� �, ,4 S S. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t.. t.. S. � t t :z .,. : J J r r�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`$ t ? ss a t t.a.1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 rsuti�.. <,�,.ts�t�r.w�a�, .�t.rvs}a,.s�,r»,�v er .r,,r#Sas ,...>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>,.>,.>,.>,.>,.>,.>,.>,.>>.r4,r�.,,z{5..�. ru .iJtir{�.�r,t..&,vs�la.�<�.:,5��ttuS l tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tf,
Item Quantity Units Unit Cost Total
General
Mobilization 1 LS $ 500,000.00 $ 500,000.00
SWPPP Controls and Maintenance 1 LS $ 10,000.00 $ 10,000.00
Barricades,Signs and Traffic Handling 12 MO $ 5,000.00 $ 60,000.00
Traffic Signage and Posts(Yield,Stop, Ped.Crossing Signs) 18 EA $ 550.00 $ 9,900.00
2 X tatttttktit ,.. o .
Demolition
Tree Protection 35 EA $ 100.00 $ 3,500.00
Tree Removal 38 EA $ 250.00 $ 9,500.00
Sawcut, Remove Concrete(Curb and Gutter) 6720 LF $ 18.00 $ 120,960.00
Sawcut, Remove Concrete Road/Paving 3416 SY $ 18.00 $ 61,488.00
Gravel Paving to be Removed 259 SY $ 12.00 $ 3,108.00
Baseball/Softball Fence to be Removed and Relocated 1443 LF $ 20.00 $ 28,860.00
Field Lights to be Removed and Relocated 5 EA $ 5,000.00 $ 25,000.00
sI8 �. W >. �t ® ems °S \a, \ W ii
Utilities
Curb Inlet 4 EA $ 5,000.00 $ 20,000.00
18" RCP 850 LF $ 75.00 $ 63,750.00
24" RCP 200 LF $ 90.00 $ 18,000.00
30" RCP 200 LF $ 100.00 $ 20,000.00
36" RCP 300 LF $ 125.00 $ 37,500.00
42" RCP 600 LF $ 150.00 $ 90,000.00
42" Outfall (Headwall,Wingwalls, Erosion Protection) 1 EA $ 10,000.00 $ 10,000.00
Trench Safety 2,150 LF $ 2.00 $ 4,300.00
4;
B d 8 �i. y
Grading and Earthwork
Site Prep(Cut, Fill,and Balance) (3' Depth Max.) 30 AC $ 2,500.00 $ 75,000.00
Paving
Pedestrian Concrete Paving(6"Thickness) 4,698 SY $ 55.00 $ 258,390.00
Pedestrian Soft-Surface Paving(6"Thickness) 683 SY $ 45.00 $ 30,735.00
Vehicular Concrete Paving(8"Thickness) 12,549 SY $ 65.00 $ 815,685.00
Concrete Curb and Gutter(6" Reinforced) 11,217 LF $ 20.00 $ 224,340.00
ADA Curb Ramp 8 EA $ 2,500.00 $ 20,000.00
Parking Lot Striping(White,Surface Preparation,Sealer, 17,370 LF $ 2.00 $ 34,740.00
Complete in Place)
Roadway Striping(Yellow,Surface Preparation,Sealer,Complete 1,236 LF $ 5.00 $ 6,180.00
in Place)
Crosswalk Striping(White,Surface Preparation,Sealer,Complete
in Place) 48 LF $ 2.00 $ 96.00
"i ot,i.�. iithi .rem .\ �a t ' ' ' q;'
t
Structures
Additional Parking Lot Lighting Pole Foundations 33 EA $ 1,500.00 $ 49,500.00
Site Amenity
Decorative Bollard 4JEA $ 500.00 $ 2,000.00
Decorative Removable/Foldable Bollard 8 EA $ 750.00 $ 6,000.00
Decorative Bench 6 EA $ 2,000.00 $ 12,000.00
Decorative Picnic Table 5 EA $ 3,500.00 $ 17,500.00
Decorative Trash Receptacle 1 EA $ 1,750.00 $ 1,750.00
Decorative Drinking Fountain (Plazas and Playground) 1 EA $ 7,500.00 $ 7,500.00
All-Inclusive Playground Equipment(2-5 YR and 5-12 YR) 1 LS $ 500,000.00 $ 500,000.00
Playground Surfacing(Poured in Place) 17,000 SF $ 15.00 $ 255,000.00
Erosion Control
Silt Fence(Temporary Sediment Control)(Install) 2,500 LF $ 1.80 $ 4,500.00
Silt Fence(Temporary Sediment Control)(Remove) 2,500 LF $ 0.20 $ 500.00
Temporary Construction Entrance/Exit(Install) 1 EA $ 1,750.00 $ 1,750.00
Temporary Construction Entrance/Exit(Remove) 1 EA $ 500.00 $ 500.00
Landscaping
Shade Tree 400 EA $ 750.00 $ 300,000.00
Ornamental Tree 75 EA $ 500.00 $ 37,500.00
Decorative Planting 5,000 SF $ 15.00 $ 75,000.00
Seeding(Open Space)(Bermuda) 6,000 SY $ 1.25 $ 7,500.00
Plant Maintenance 12 MO $ 4,000.00 $ 48,000.00
® taa at:� � m m a n�
Lighting and Electric
Additional Parking Lot Lighting 33 EA $ 10,000.00 $ 330,000.00
Site Wiring(Parking Lot and Field Lighting) 2,000 LF $ 20.00 $ 40,000.00
Additional Field Lighting 4 EA $ 30,000.00 $ 120,000.00
'
Irrigation
Temporary/Permanent Irrigation 6,000 SY $ 2.00 $ 12,000.00
p ppzataaaaaaak:aaaa ��a '
,azak
Overall Subtotal $ 4,389,532.00
Contingency 20% $ 877,906.40
PHASE 1 Total Estimated Cost $ 5,267,438.40
1201 North Bowser Road
Richardson,Texas 75081 I
(214)346-6200 MMM
Fax(214)739-0095
Project: Founders Park Master Plan
Owner/Client: City of Wylie
Halff AVO: 37634
Date:06/03/2020
Founders Park Master Plan - Estimate of Probable Cost (PHASE 2)
t: r t t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t
1 �,F}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,:k n t F 3:is i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i is ii 1£+5.rat.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t. ,S,r,}r.,,:,,,
. : r, ,: .�,..z.J t z t ..t ..t
3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, r x4 x4 x4 x4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4�`t's,4`�F$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t<J f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f �.,s t.)�:..:n,f.t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t .t .t l :t,t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t . a:s�`8�:s`�» : .tfi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi�fi��t ,.l �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t t}, ,,r7 r f J 2 £r%t� sou 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3:. 3:. 3. ! i ,::,1�.t 1 4 t4..: ,,:4a )�.a i,<.;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r< t,r >;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>„
Fay L� t t t t t t t t t t t t t t t t t t t t t t t t it it�.�,r4,.,.a,t .`•••s., k S t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t.
t : «r1 I t 1�r., 4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4 .2 4.r r �U>rs,o.rS .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t tt,.�rJ..,<�t. a.,I: r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r. �} +a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a,r,:..{ � J l« slF t t t t t t t t t t t t t t t t t t t t t t t t
c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c. i'.�l .S Jar.
2 c. S r s c, { c n< ,f t.5 .1 F
u:,
t
., �'3: �z s }:. ,...,,J 4,..€,: 1 ,,;;. ,,.<„=I:ns.s?:zs?:zs?:zs?. art� k �, ,4 S S. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t.. t.. S. � t t :z .,. : J J r r�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`$ t ? ss a t t.a.1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 rsuti..��.,<,�,.ts�t�r.w�a�, .�tvs}a,.s�,r»,�v er .r,,r#Sas ,...>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>,.>,.>,.>,.>,.>,.>,.>,.>>.r4,r�.,,z{5..�. ru .iJtir{�.�r,t..&,vs�la.�<�.:,5��ttuS l tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tf,
Item Quantity Units Unit Cost Total
General
Mobilization 1 LS $ 500,000.00 $ 500,000.00
SWPPP Controls and Maintenance 1 LS $ 10,000.00 $ 10,000.00
Barricades,Signs and Traffic Handling 12 MO $ 5,000.00 $ 60,000.00
Traffic Signage and Posts(Yield,Stop, Ped.Crossing Signs) 35 EA $ 550.00 $ 19,250.00
Demolition
Tree Protection 24 EA $ 100.00 $ 2,400.00
Tree Removal 16 EA $ 250.00 $ 4,000.00
Sawcut, Remove Concrete(Curb and Gutter) 725 LF $ 18.00 $ 13,050.00
Sawcut, Remove Concrete Road/Paving 4158 SY $ 18.00 $ 74,844.00
Field Lights to be Removed and Relocated 13 EA $ 5,000.00 $ 65,000.00
Scoreboards to be Removed and Relocated 2 EA $ 2,500.00 $ 5,000.00
Overhead Utilities to be Buried at Hensley Lane 1806 LF $ 500.00 $ 903,000.00
Utilities
2x2 Grate Inlet 3 EA $ 2,500.00 $ 7,500.00
Curb Inlet 4 EA $ 5,000.00 $ 20,000.00
Water Service Line Extension 2,000 LF $ 25.00 $ 50,000.00
Sewer Service Line Extension 1,200 LF $ 50.00 $ 60,000.00
Sewer Manhole(Tap, Bends,and Intermediate) 3 EA $ 5,000.00 $ 15,000.00
18" RCP 1,050 LF $ 75.00 $ 78,750.00
24" RCP 500 LF $ 90.00 $ 45,000.00
30" RCP 350 LF $ 100.00 $ 35,000.00
36" RCP 400 LF $ 125.00 $ 50,000.00
36" Outfall(Headwall,Wingwalls, Erosion Protection) 2 EA $ 7,500.00 $ 15,000.00
Trench Safety 2,300 LF $ 2.00 $ 4,600.00
Grading and Earthwork
Site Prep(Cut, Fill,and Balance) (3' Depth Max.) 30 AC $ 2,500.00 $ 75,000.00
Paving
Pedestrian Concrete Paving(6"Thickness) 3,820 SY $ 55.00 $ 210,100.00
Pedestrian Soft-Surface Paving(6"Thickness) 300 SY $ 45.00 $ 13,500.00
Vehicular Concrete Paving(8"Thickness) 10,756 SY $ 65.00 $ 699,140.00
Vehicular Concrete Paving(Deceleration Lane) (8"Thickness) 151 SY $ 65.00 $ 9,815.00
Vehicular Brick Paving(Entry and Food Truck Areas) 15,949 SF $ 25.00 $ 398,725.00
Concrete Curb and Gutter(6" Reinforced) 7,510 LF $ 20.00 $ 150,200.00
ADA Curb Ramp 21 EA $ 2,500.00 $ 52,500.00
Parking Lot Striping(White,Surface Preparation,Sealer, 2,040 LF $ 2.00 $ 4,080.00
Complete in Place)
Roadway Striping(Yellow,Surface Preparation,Sealer,Complete 5,100 LF $ 5.00 $ 25,500.00
in Place)
Crosswalk Striping(White,Surface Preparation,Sealer,Complete 350 LF $ 2.00 $ 700.00
in Place)
:FIB Belot<m ft�e w r ,
Structures
Additional Parking Lot Lighting Pole Foundations 12 EA $ 1,500.00 $ 18,000.00
Site Amenity
Decorative Bollard 8 EA $ 500.00 $ 4,000.00
Decorative Removable/Foldable Bollard 8 EA $ 750.00 $ 6,000.00
Decorative Picnic Table 13 EA $ 3,500.00 $ 45,500.00
Decorative Trash Receptacle 2 EA $ 1,750.00 $ 3,500.00
Sculpture/Public Art 6 EA $ 10,000.00 $ 60,000.00
Wayfinding Signage 3 EA $ 500.00 $ 1,500.00
Erosion Control
Silt Fence(Temporary Sediment Control)(Install) 1,000 LF $ 1.80 $ 1,800.00
Silt Fence(Temporary Sediment Control)(Remove) 1,000 LF $ 0.20 $ 200.00
Temporary Construction Entrance/Exit(Install) 1 EA $ 1,750.00 $ 1,750.00
Temporary Construction Entrance/Exit(Remove) 1 EA $ 500.00 $ 500.00
Landscaping
Shade Tree 250 EA $ 750.00 $ 187,500.00
Ornamental Tree 35 EA $ 500.00 $ 17,500.00
Decorative Planting 6,000 SF $ 15.00 $ 90,000.00
Seeding(Open Space)(Bermuda) 10,000 SY $ 1.25 $ 12,500.00
Plant Maintenance 12 MO $ 4,000.00 $ 48,000.00
Lighting and Electric
Additional Parking Lot Lighting 12 EA $ 10,000.00 $ 120,000.00
Site Wiring(Parking Lot and Field Lighting) 2,450 LF $ 20.00 $ 49,000.00
P . �W '
Irrigation
Temporary/Permanent Irrigation 10,000 SY $ 2.00 $ 20,000.00
Overall Subtotal $ 4,363,904.00
Contingency 20% $ 872,780.80
PHASE 2 Total Estimated Cost $ 5,236,684.80
1201 North Bowser Road
Richardson,Texas 75081 I
(214)346-6200 MMM
Fax(214)739-0095
Project: Founders Park Master Plan
Owner/Client: City of Wylie
Halff AVO: 37634
Date:06/03/2020
tt}
Founders Park Master Plan - Estimate of Probable Cost (PHASE 3)
t: r t:t.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,4r} �.,rrt:}.:1 �,F}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,:k t t F 3:is i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i is ii 1£+5.rat.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t. ,S,r,}r.,t:,,,
. : r, ,: .t,..z.J t z t ..t ..t
3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, r x4 x4 x4 x4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4�`as,4`�F$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t<J f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f �.,s t.)�:..:n,f.t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t .t .t l :t,t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t . a:s
t ,tl tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt tt t}, ,,r7 r f J 2 £ t F, t.t�:
r%t� sou 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3:. 3:. 3. ! t ,::,1�.t 1 4 t4t.: ,,:4a )t.a i,<.;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r< t,r >;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>„
Fay L� t t t t t t t t t t t t t t t t t t t t t t t t it it�.�,r4,.,.a,t .`•••s., k S t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t.
t : «t1 I � t 1�r., 4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4 .2 4.r r tU>rs,o.rS .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t tt,.�rJ..,<�t. a.,I: r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r. �} +a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a,r,:..{ � J l<t slF t t t t t t t t t t t t t t t t t t t t t t t t
c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c. t'.�l .S Jtr.
2 c. S r s c, { c n< ,f t.5 .1 F
u:,
t
}, .. �!.�3: � s }:. ,...,,J 4,..€,: 1 ,,;;t ,, <„=I:ns.s?:zs?:zs?:zs?. art�14k �, ,4 S S. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t.. t.. S. � t t :z .,. : J J r r�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`�rr�S�`$ t ? s s a t Fta.1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 rtuti�..t�,<�t,ts�t�r.w��, �t rvs �t»,�t er .r,,r#Sas ,a.>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>,.>,.>,.>,.>,.>,.>,.>,.>>.r4,r�,,z{5..�. ru .iJtir{��r,t&v�{��<t.:��ttuS l ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3ttt3tf,
Item Quantity Units Unit Cost Total
General
Mobilization 1 LS $ 450,000.00 $ 450,000.00
SWPPP Controls and Maintenance 1 LS $ 10,000.00 $ 10,000.00
Barricades,Signs and Traffic Handling 12 MO $ 5,000.00 $ 60,000.00
Atk to 1a i ` `°� ..ta`` ` A N.
Demolition
Tree Removal 23 EA $ 250.00 $ 5,750.00
Field Lights to be Removed and Relocated 21 EA $ 5,000.00 $ 105,000.00
Utilities
2x2 Grate Inlet 17 EA $ 2,500.00 $ 42,500.00
Water Service Main Connection (Tap and Appurtenances) 2 EA $ 15,000.00 $ 30,000.00
Plaza Water Service Connection (Taps,Appurtenances,and Meters) 2 EA $ 5,000.00 $ 10,000.00
18" RCP 1,700 LF $ 75.00 $ 127,500.00
24" RCP 450 LF $ 90.00 $ 40,500.00
30" RCP 300 LF $ 100.00 $ 30,000.00
Trench Safety 2,450 LF $ 2.00 $ 4,900.00
Grading and Earthwork
Site Prep(Cut, Fill,and Balance) (3' Depth Max.) 45 AC $ 2,500.00 $ 112,500.00
Mass Grading(Field Preparation,Swales,Sidewalks, Plazas) (3" Depth Max.) 35 AC $ 2,000.00 $ 70,000.00
m e a s a m a a a o00 00'oo A
gua
mmavammsava
vAvksv,
Paving
Pedestrian Concrete Paving(6"Thickness) 3,650 SY $ 55.00 $ 200,750.00
Pedestrian Integral Color Concrete Paving(6"Thickness) 1,784 SY $ 85.00 $ 151,640.00
Pedestrian Soft-Surface Paving(6"Thickness) 400 SY $ 45.00 $ 18,000.00
o00000000000000
Structures
Concession/Restroom/Storage 2 EA $ 250,000.00 $ 500,000.00
Scoreboard Pole Foundations 3 EA $ 1,000.00 $ 3,000.00
Additional Field Lighting Pole Foundations 20 EA $ 3,000.00 $ 60,000.00
Site Amenity
Decorative Bench 10 EA $ 2,000.00 $ 20,000.00
Decorative Picnic Table 13 EA $ 3,500.00 $ 45,500.00
Decorative Trash Receptacle 5 EA $ 1,750.00 $ 8,750.00
Decorative Drinking Fountain (Plazas and Playground) 2 EA $ 7,500.00 $ 15,000.00
Soccer Field Goals/Nets 6 EA $ 4,000.00 $ 24,000.00
Football Field Uprights 6 EA $ 5,000.00 $ 30,000.00
15' Player Benches 12 EA $ 1,500.00 $ 18,000.00
Bleachers 8 EA $ 10,000.00 $ 80,000.00
Erosion Control
Silt Fence(Temporary Sediment Control)(Install) 2,000 LF $ 1.80 $ 3,600.00
Silt Fence(Temporary Sediment Control)(Remove) 2,000 LF $ 0.20 $ 400.00
Temporary Construction Entrance/Exit(Install) 1 EA $ 1,750.00 $ 1,750.00
Temporary Construction Entrance/Exit(Remove) 1 EA $ 500.00 $ 500.00
a
Landscaping
Shade Tree 100 EA $ 750.00 $ 75,000.00
Ornamental Tree 30 EA $ 500.00 $ 15,000.00
Decorative Planting 1,000 SF $ 15.00 $ 15,000.00
Sodding(Crowned Fields)(419 Bermuda) 25,000 SY $ 6.00 $ 150,000.00
Seeding(Open Space)(Bermuda) 45,000 SY $ 1.25 $ 56,250.00
Plant Maintenance 12 MO $ 4,000.00 $ 48,000.00
Lighting and Electric
Site Wiring(Parking Lot and Field Lighting) 4,250 LF $ 20.00 $ 85,000.00
Additional Field Lighting 35 EA $ 30,000.00 $ 1,050,000.00
Additional Football Scoreboard 1 EA $ 5,000.00 $ 5,000.00
Electric Service Connection to Concession/Restroom/Storage 2 EA $ 10,000.00 $ 20,000.00
Irrigation
Temporary/Permanent Irrigation 70,000 SY I $ 2.00 $ 140,000.00
Overall Subtotal $ 3,938,790.00
Contingency 20% $ 787,758.00
PHASE 3 Total Estimated Cost $ 4,726,548.00
1201 North Bowser Road
Richardson,Texas 75081
(214)346-6200
Fax(214)739-0095
Project: Founders Park Master Plan
Owner/Client: City of Wylie
Halff AVO: 37634
Date:06/03/2020
t,}
Founders Park Master Plan - Estimate of Probable Cost (PHASE 4)
J: r t:t.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,.t,
k n
4r 1 �,F}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}.�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,fl}z�,:
3:is i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i i i.i.+:i is ii 1£+5<
rat.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t.t. ,S,r,}r.,,:,,,
. : r, ,: .�,..z.J t z t ..t ..t
3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, 3, r x4 x4 x4 x4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4 4 4 fx4 4�`as,4`�F$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t'}�t<J f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f �.,s t.)�:..:n,f.t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t .t .t l <t,t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t.a:S�`8�:s`�» : .tfi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi��fi�fi��t ,.l �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t �t t}, ,,r7 r f J 2 £r%t� sou 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3. 3:. 3:. 3: 3:. 3:. 3. ! i ,::,1�.t 1 4 t4..: ,,:4a )�.a i,<.;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r<;r< t,r >;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>;,�>„
Fay L< t t t t t t t t t t t t t t t t t t t t t t t t it it�.�,r4,.,.a,t .`•••s., k S t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t. t.
t : «r1 I � t 1�r., 4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4�:4 .2 4.r r �U>rs,o.rS .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t .t t tt,.�rJ..,<�t. a.,I: r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r, r. �} +a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a.r<�a,r,:..{ � J l:< slF t t t t t t t t t t t t t t t t t t t t t t t t
c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c. i'.�l .S Jar.
2 c. S r s c, { c n< , t.5 .1 F
u:,
}, .. .�3: � s }:. ,...,,J 4,..€,: 1 ,,;;. ,,.<„=I:ns.s?:zs?:zs?:zs?. art 4k �, ,4 S S. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t t. t.. t.. t.. t.. S. � t t :z .,. : J J r r<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`�rr<S�`$ t ? ss a t t.a.1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 .1 1 1 rtuti�.<«,<�ts�t�r.w��, �t rvs �r»,�v er .r,,r#Sas ,...>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>>.>dra4,t��z{5..�.m�u .iJtir{��r,i&v�{a�<.t.:���ttuS l tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tt�3tf_
Item Quantity Units Unit Cost Total
General
Mobilization 1 LS $ 60,000.00 $ 60,000.00
SWPPP Controls and Maintenance 1 LS $ 10,000.00 $ 10,000.00
Barricades,Signs and Traffic Handling 12 MO $ 5,000.00 $ 60,000.00
Traffic Signage and Posts(Yield,Stop, Ped.Crossing Signs) 5 EA $ 550.00 $ 2,750.00
Demolition
Tree Protection 16 EA $ 100.00 $ 1,600.00
Tree Removal 10 EA $ 250.00 $ 2,500.00
Utilities
Curb Inlet 2 EA $ 5,000.00 $ 10,000.00
18" RCP 100 LF $ 75.00 $ 7,500.00
36" RCP 300 LF $ 125.00 $ 37,500.00
Trench Safety 400 LF $ 2.00 $ 800.00
.,
Grading and Earthwork
Site Prep(Cut, Fill,and Balance) (3' Depth Max.) 20 AC $ 2,500.00 $ 50,000.00
a a m mLA
a e a a m # # # all
Paving
Vehicular Concrete Paving(8"Thickness) 2,352 SY $ 65.00 $ 152,880.00
Concrete Curb and Gutter(6" Reinforced) 1,037 LF $ 20.00 $ 20,740.00
Parking Lot Striping(White,Surface Preparation,Sealer,
781 LF $ 2.00 $ 1,562.00
Complete in Place)
Structures
Additional Parking Lot Lighting Pole Foundations 6 EA $ 1,500.00 $ 9,000.00
Site Amenity
Decorative Trash Receptacle 2 EA $ 1,750.00 $ 3,500.00
Erosion Control
Silt Fence(Temporary Sediment Control)(Install) 500 LF $ 1.80 $ 900.00
Silt Fence(Temporary Sediment Control)(Remove) 500 LF $ 0.20 $ 100.00
Temporary Construction Entrance/Exit(Install) 1 EA $ 1,750.00 $ 1,750.00
Temporary Construction Entrance/Exit(Remove) 1 EA $ 500.00 $ 500.00
Landscaping
Shade Tree 15 EA $ 750.00 $ 11,250.00
Decorative Planting 1,000 SF $ 15.00 $ 15,000.00
Seeding(Open Space)(Bermuda) 5,000 SY $ 1.25 $ 6,250.00
Plant Maintenance 12 MO $ 4,000.00 $ 48,000.00
Lighting and Electric
Additional Parking Lot Lighting 6 EA $ 10,000.00 $ 60,000.00
Site Wiring(Parking Lot and Field Lighting) 400 LF $ 20.00 $ 8,000.00
Irrigation
Temporary/Permanent Irrigation 5,000 SY $ 2.00 $ 10,000.00
UaZ
Overall Subtotal $ 592,082.00
Contingency 20% $ 118,416.40
PHASE 4 Total Estimated Cost $ 710,498.40
Project
Update
CompletionDate
Park Zone
Budget
Funded From
Twin Lakes/Southbrook Trail Connection
Project has begun. Tenative completion will be
the mid to late September.
In Process
Central
$ 300,000.00
A/I
Founders Park Master Plan
Final Plan is 98% complete.
Final approval of the PARB in August.
Under review
West
$ 22,000.00
Parks Operations
Brown House Improvements
Staff is working on construction documents
for Phase 1 improvements.
Fall 2020
$ 175,000.00
Hotel/Motel
Avalon Park Fence Project
Finalizing start date for construction.
Complete easement for Eastfork water line.
Fall 2020
East
$ 115,000.00
A/I