Loading...
05-04-1987 (City Council) Agenda Packet Date Posted 4-30-87 Time Posted 4: 14 P.M. AGENDA CALLED MEETING CITY COUNCIL CITY OF WYLIE, TEXAS MONDAY, MAY 4, 1987 6:30 P. M. COMMUNITY ROOM 800 THOMAS STREET 0, - � CALL TO ORDER INVOCATION ORDER OF PAGE BUSINESS REFERENCE BUSINESS 1 Work session on the Lake Ray Hubbard Mobile Home Park offsite water line and sewer, offsite drainage, and staging of park opening , etc. 2 Adjourn MEMORANDUM TO: MAYOR AND COUNCILMEMBERS FROM: JAMES JOHNSON, ACTING CITY MANAGER `. RE: FINHOLT ENTERPRISES - LAKE RAY HUBBARD MOBILE HOME PARK DATE: MAY 4, 1987 Tonight' s workshop is so that the Council may become more knowledgable of the problems with the Lake Ray Hubbard Mobile Home Park. They are as follows: 1. Off-Site Water/Road a. Brunson Claim -This claim has been turned over to our general liability carrier (Fielding Reinsurance Ltd. ) and is being addressed by an adjuster. Mrs. Brunson filed a claim against the city and has not actually specified the amount. A figure of $3500 has been talked about. Mrs. Brunson hit a pile of dirt in the road that she says was left there by Reed Construction, when installing the water line. She is claiming leg and knee injuries and damage to her ' 82 Firebird. No police report was filed, as we were apparantly later notified of the accident. (See attached - Exhibit I) . b. Day-Star Sales (See attached - Exhibit II) This letter /,-0../N states that they intend to file a lien on Lake Ray Hubbard Mobile % • Home Park in the amount of $68, 242. 23 (supplies and materials for -x"'(` water line) . c. Petition from Collin County - (Exhibit III) County Road 381 was put in with County labor, however, the road was paid for by adjacent property owners. Please see the letter, stating terms and conditions of line installation. The contractor, Reed Construction, slotted the road in numerous places with a backhoe trencher, because of improper pads. Road 381 was also damaged along the sides in many places, by the trenching. Last week, members of the City staff met with Ruben Delgado, P. E. (assistant Director of Public Works - Engineering, Collin County) and some of his people, regarding this matter. The City staff promised our immediate attention to the problem. A subsequent meeting was held with John Reed and Ron Homeyer to discuss the problem. The county people are to be here again tomorrow (May 5th) to discuss the issue again and meet with Ron Homeyer. iI , e� — d. Oversizing Difference - Encl .sed is a copy (Exhibit IV) of the water line oversizing costs and our proposed reimbursement. Apparently, there is some disagreeme, in the amount (See Finholt letter of May 1, 1987 - Exhibit V) . 2. Off-Site Drainage/Sewer/On site a. The drainage ditch problem, involves Mr. Allard, adjacent property owner to Lake Ray Hubbard Mobile Home Park. The city j4•'.LLe{;, staff feels that if the City accepts the mobile home park with the drainage problem, which we believe has been caused by the park' s ( construction, consequently resulting in damage to Mr. Al lard' s ''1 �J `+F property, we may be assuming liability. (See city letter datedr April 27, 1987 to Mr. Jackson, City Attorney - Exhibit VI ) . b. Sewer fees - Since the district (Cottonwood Creek Lift Stat ion) has not been created, nor the fees set ; The staff feels, along with our attorney that the city has the right to establish j ZA,..4„ the fees, no matter what budgetary figures were given to Mr. j ___ Finholt by Gus or myself, and hold them to it. _______ c. Interior water/sewer lines have not been accepted by the City, nor a maintenance bond posted. d. Staging of park opening - Mr. Finholt wants to open the park in stages, so as to minimize our sewer problems. Any phasin r^ on the park would have to have been done in the planning stag ,,7 .+c .,i (site plan, prior to construction) , rather than after construction ) ?' An amended plat plan showing amended development would, as i appears to me, have to be filed with P & Z, and then to the Counci for the staged opening of the park. (Roy Fiares, Code Officer wi be available for this one) . -------- Additionally,` Mr. Jackson was at City Hall, Friday, May 1, 1987, and was briefed on these items, as well as visiting the site and the road. /// I // E' 4 t Al< ( t V. r, I ( 1 t / /71�t Ati:(4;A V51;. CITY OF WYLIE 108 S.JACKSON ST. — P.O. 80X 428 WYLIE,TEXAS 75098 (214)442-2236 April 27, 1987 Bob Medlin Frontier Adjusters of Dallas P. O. Box 28841 Dallas, Texas 75228 Re: Sandra Brunson Claim Dear Bob, I am enclosing a claim against the city by a Sandra G. Brunson of 2502 Rochdale, Garland, Texas. I suggest that you may want to also talk with Don White of the City' s engineering department. The contractor, Reed Construction of Lewisville, Texas, has also been contacted. Should you need additional information, please call me. Respect ively, es Jo son cting ity Manager JJ/cw Pending File -. L L NOTICE OF CLAIM Claim # 031687- 1 AGAINST THE CITY OF WYLIE, TEXAS PERSONAL INJURY - PROPERTY DAMAGE File this claim within 45 days of the injury or property damage with: CITY SECRETARY CITY OF WYLIE, P. 0. BOX 428 WYLIE, TEXAS 75098 (;: PQ }A try . Br IA h Soy c,2jq - t/ 95- y7/ 9 Please print full name Telephone Numbers Roekcil Gqrjad IA 73o `/° Mailing Address City, State, Zip The TOTA__11a-- -W a7nee",- -31/(942,714q1- A- dhth-i-71-rtvn:z,/ L amount of your claim against the city is: ($) ue: (Use other side for details) Describe in your own words WHERE, WHEN, and HOW the damage or injury occurred. Attach additional pages if necessary. Give names and addresses of others involved if known. == ==================__=_____====== Location: c f V� nsov ci Date: Approximate Time (AM/PM) : cthouf b 3o 3_ g-81 ov or PM dAz zi.1 7/ _6"_5' Y- Va_.6-.--.. Alikz_.- j e ka."A-41 f)ILAru__ 4 .5�y - .. J,1,_ "AIL duiA... . `,1 9-- nm iArn/7 e 41 �2 __� /IA_ Id _ tl-ist.___ /1.4,--„,tc=yy21;1}- A:4_4dt .14- -11/i,c) illi,L ,e- ol4z) .1,ydat.4040(. 4144. Leg Give details of your claim against the City. Attach copies of any repair estimates, medical reports, etc. R $ . /,.,14,- .tk c-- Ie }rutr --"1"1-Ag ALL THE STATEMENTS MADE IN THIS CLAIM ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE: o g Date gnature of C a mant Article 18, Section 8 - Damage Suits of the Charter of the City of Wylie states before the City shall be liable for any claim for damages for the death or personal injuries of any person or for damages to property, the complainant or his authorized representative shall notify the City Secretary. The notification shall be in writing and shall state specifically how, when and where the death, injury or damage occurred; the amount of loss claimed; and the identity of any witnesses upon whom it is relied to establish the claim. The notification shall be filed within forty-five (45) days of the date of injury or damage or , in the case of death, within forty-five (45) days of the date of death. The failure to so notify the City within the time and manner specified shall exonerate, excuse and exempt the City from any liability whatsoever. No action at law shall be brought against the City until at least sixty (60) days have elapsed since the date of notification. J7,411..ipded.r- :k! SALES DAY-STAR 7 Ad. Ai P.O. BOX 270587 • 4001 SOUTH BUCKNER BLVD. • DALLAS, TEXAS 75227 TELEPHONE (214) 388-4408 April 22 , 1987 City of Wylie P . 0 . Box 429 Wylie , Texas 75098 Attn : Mr . James Johnson , City Manager Dear Mr . Johnson : As per our telephone conversation of this date , I am sub- mitting the following information to you regarding the "Lake Ray Hubbard Mobil Home Estates , 0ff-Site Water Project" . The line is currently owned by Mr . Roger Finholt of Big D Construction Co . and was installed by Mr . John Reed of Reed Contractors . We supplied the materials for construction . As of this date there remains $68 , 242 . 23 of unpaid invoices dating back to February of this year . Naturally we are con- cerned about payment of these invoices . Anything that the City of Wylie can do to assist us in this matter will be appreciated . Possibly a joint check could be issued to Reed Contractors and Day-Star Sales , Inc . We would then issue a check to Mr . Reed for the balance after the cost of materials has been taken out . After we receive payment we will issue a full release of lien to Reed Contractors and the City of Wylie . Very truly yours , DAY STAR SALES , I . littia44 • Arthur J . L sila Credit Mana er AJL ; js UTILITY AND MUNICIPAL SUPPLIES • PIPES • VALVES • FITTINGS Tee., COLLIN COUNTY Department of Public Works February 10, 1987 I . W. Santry, Jr. , P.E. Engineer City of Wylie 114 North Ballard P.O. Box 428 Wylie, Texas 75098 Subject : Waterline Installation County Road 381 Dear Mr. Santry: On November 25, 1986, Commissioners Court issued Court Order 86-980-11-25 authorizing the installation of a waterline by the City of Wylie within the prescriptive right-of-way of County Road 381 . We define the prescriptive right-of-way to include the backslope of the ditches. (A copy of the Court Order is attached) . Please note that in the Court Order there are certain conditions that must be complied with: 1 ) No damage will occur to county roads as a result of the waterline installation; if roads are damaged, they will be fixed to the satisfaction of the Department of Public Works. 2) The Department of Public Works must be notified prior to beginning any construction; 3 ) The lines should be installed in the backslope of the ditch; McKinney, Texas 75069 • (214) 548-4616 • 231-7170 (Metro) -2- 4 ) Drainage along the county road must not be obstructed so as to damage the county road; 5) The County is not responsible or liable for any damages caused by the installation. None of the above conditions have been met . We feel that the City of Wylie and the contractor are trying to comply with the conditions and prevent any long-term damage caused by the undermining of the road due to the excavation of the waterline along the edge of the road surface. We also feel that the City and contractor will repair both the base and the surface to the satisfaction of the Department of Public Works. Please let us know of your plan on how the damage to the road will be repaired so we may properly respond to complaints by citizens who live on County Road 381 . Sincerely, • 1. e ((.t.k Q Richard Boston •�_ Assistant Director of Public Works Maintenance xc: Clarence Daugherty Ruben Delgado /./f /WA -46,dadt__ , _ 5‘4..-4;1 Coil in County Commissioner , Precinct 2 Mt- . Jerry Hoagland Collin County Courthouse McKinney , Texas 75069 ^,1;r Mr . Hoagland: We the concerned citizens along County Road 381 or Elm Drive South cf Wylie , would appreciate your cooperation in completely repaving this road . Currently , a development south east of Wylie in RocKwall County needs a 12 inch water line . The City of Wylie has approved this development , and we assume the county gave them the easemerrit for the water line . In the process the heavy equipment and the bacKhoe 's legs have left holes in the pavement approximatly every 6 feet . • We expect an increase in traffic from this development; therefore , the road should be completely repaved . Collin County tax payers shouldn 't have to pay the bill for road repair due to a RocKwall County development . We the undersigned citizens would appreciate your rornpt atte on to this matter . 7-10 / �% 4 ?vit.; / C5A.4L.464"-'• CZebil-; 3t, , /5.a l pit vL � � w.,.. � •�.:+.�,�. Gott. / MEMORANDU ,P - \ J April 22, 1987 I, -t�''' , Kr iv r �ti, X To: City Council \. -,, ,• . From: I . W. Santry, Jr. , City Engineer ;= (Ir itz) Subject: Lake Ray Hubbard Mobile Home Park Offsite - " Water Line Oversizing Original water requirement by Finholt's Engineers showed 12-inch water line from tank on South Ballard to intersection of Collin County Road No. 381 , then a 10-inch water line to the East End of Phase I Development on Vinson Road. Only the above arrangement will be used in the oversizing costing to 14-inch and 12-inch. ORIGINAL 12-INCH AND 10-INCH COSTING FIGURES USING THE REED CONTRACTORS UNIT FIGURES. Length (L.F) or Unit Cost Total Cost Item Number (dollars) (dollars) 12-inch PVC Pipe 2,960 L.F. $ 13.46 $ 39,841 .60 12" Gate Valve & Box 5 ea. 823.10 4,115.50 10" Gate Valve & Box 15 ea. 710.00 10,650.00 12" Plug 5 ea. 157.24 786.20 10" PVC Pipe 10,980 L.F. 10.50 115,290.00 Fire Hydrant 4 ea. 843.60 3,374.40 12" Cross 2 ea. 336.26 672.52 10" x 6" Tee 3 ea. 172.54 517.62 8" Valve & Box 1 ea. 318.31 318.31 12" x 6" Tee 1 ea. 416.50 416.50 6" Gate Valve & Box 4 ea. 213.11 852.44 8" Plug 3 ea. 107.86 323.58 12" x 10" Tee 1 ea. 259.91 259.91 10" x 10" Tee 8 ea. 209.55 1 ,676.40 10" Plug 5 ea. 147.00 735.00 10" x 8" Cross 1 ea. 218.63 218.63 10" x 8" Reducer 1 ea. 102.04 102.04 10" x 9" Tee 2 ea. 180.41 360.82 10" 45° Bend 5 ea. 270.00 1 ,350.00 Road & Drive Excay. & Repair L.S. 8,368.00 TOTAL $ 190,229.47 OVERSIZED 14-INCH AND 12-INCH COSTING FIGURES USING REED CONTRACTORS UNIT FIGURES Length (L.F. ) or Unit Cost Total Cost Item Number (dollars) (dollars) 14" PVC Pipe 2,960 L.F. $ 17.05 $ 50,468.00 12" PVC Pipe 10,980 L.F. 13.46 147,790.80 14" Gate Valve & Box 4 ea. 2,251 .10 9,004.40 14" x 12" Tee 3 ea. 526.74 1 ,580.22 14" Cross 1 ea. 843.60 843.60 14" x 12" Reducer 1 ea. 390.18 390.18 12" Valve & Box 20 ea. 823.10 16,462.00 14" Plug 2 ea. 225.36 450.72 12" Plug 8 ea. 157.24 1 ,257.92 14" x 6" Tee 2 ea. 492.20 984.40 6" Gate Valve & Box 4 ea. 213.11 852.44 Fire Hydrants 4 ea. 843.60 3,374.40 12" x 6" Tee 2 ea. 219.50 439.00 12" Tee 5 ea. 435.58 2,177.90 12" x 8" Reducer 1 ea. 287.80 287.80 8" Plug 3 ea. 107.86 323.58 8" Valve & Box 2 ea. 318.31 636.62 12" 45° Bend 5 ea. 370.66 1 ,853.30 12" x 8" Cross 2 ea. 265.40 530.80 12" x 8" Tee 4 ea. 229.85 919.40 Road & Drive Repair & Excay. L.S. 8,368.00 TOTAL $ 248,766.48 Difference between required oversizing and Lake Ray Hubbard Park original design $ 58,766.01 It is recommended by the Engineering Staff that the above amount be paid to Roger Finbolt Development. ) 4 Reed Contractors, Inc. t Complete Land Development 541 W. Main St.e 100 Lewisville, Texas 75067 (214) 221=1874 (214) 221-1917 October 29, 1986 Roger Finholt 1115 Luke St. Suite 100 Irving, Tx. 75061 PROPOSAL RE: Lake Ray Hubbard Mobil Home Estates offsite water line 14" P.V.C. 2,960 L.F. @ 17.05 L.F. $50,468.00 ,12" P.V.C. 10,980 L.F. @ 13.46 L.F. $147,790..80 14" Gate Valve & Box 4 Ea. @ 2,251.10 Ea. $9,004.40 12 " Gate Valve & Box 12 Ea. @ $823.10 Ea. $9,877.20 .4 x 12 Reducer 2 Ea. @ S390.18 Ea. 5780.36 14" Cross 1 Ea. @ $843.60 Ea. $843.60 14" Plug 2 Ea. @ $225,36 Ea. $450.52 12" Plug 7 Ea. @ S157. 24 Ea. S1,100.FS 14 x 6 Tee 1 £a. @ $492.20 Ea. $492.20 Fire Hydrant 4 Ea. @ $843.60 Ea. $3,374.40 14 x 12 Cross 1 Ea. @ $764.10 Ea. $764.10 14 x 12 Tee 1 Ea. @ $526,74 Ea. $526.74 12 x 6 Tee 3 Ea. @ $416.50 Ea. $1,249.50 12" Tee 5 Ea. $435.53 Ea. $2,177.90 12x 8 Reducer 1 Ea. @ $287.80 Ea. $287.80 8" Plug 1 Ea. @ $107.86 Ea. $107.86 12" 45° Bend 9 Ea. @ $370.66 Ea. $3,335.94 Road & driveway excavation & Repair Lump Sum $8,368.00 TOTAL THIS PROPOSAL $241,000.00 ,' Reed Contractors John Reed JR/lr Reed Contractors, Inc. Complete Land Development • 541 W. Main Ste. 100 Lewisville, Texas 75067 (214) 221-1874 (214) 221-1917 October 29, 1986 Roger Finholt 1115 Luke St. Suite 100 `" Irving, Tx. 75061 �Y PROPOSAL RE: Alternate Lake Ray Hubbard Mobil Home Estates , 10" P.V.C. 13,940 L.F. @ $10.50 L.F. $146,370.00 10" Gate Valve & Box 16 Ea. @ $710.00 Ea. $11,360.00 14 x 10 Reducer 1 Ea. @ $365.00 Ea. $365.00 10" 45° Bend 17 Ea. @ $270.00 Ea. $4,590.00 10" Plug 1 Ea. @ $147.00 Ea. $147.00 Road & Driveway Excavation & Repair Lump Sum $8,368.00 TOTAL THIS PROPOSAL $171,200.00 �/t fs , : i ",Reed Contractors John Reed JR/lr fieVy- CITY OP' WYLIE 108 S. JACKSON ST. — P.O. BOX 428 WYLIE, TEXAS 75098 (214)442-2236 April 27, 1987 Larry Jackson Sallinger, Nichols, Jackson, Kirk and Dillard 1800 Lincoln Plaza 500 N. Ackard Dallas, Texas 75201 Re: Roger Finholt - Lake Ray Hubbard Mobile Home Park Dear Larry, In follow-up to our conversation on Friday, I am enclosing a letter from Roger Finholt regarding his development, Lake Ray Hubbard Mobile Home Park. There are several problems with the park, namely drainage and providing for sewage. He also asked for the city to allow him to "stage" the opening of his park, that is to allow him so many spaces to be rented. For sake of illustration, I' ll use 35 spaces for stage one and so forth. Please examine the letters carefully from Mr. Finholt. I am concerned about the city' s liability regarding the off-site drainage. Mr. Finholt wants the city to approve and accept the park, however, I believe that if the city does, we may create a liability problem with the adjacent property owner. Additionally, Mr. Finholt has stated that Gus made a verbal commitment of $175. 00 charge per space for lift station fees on the park. The cost of that line is approximately $1OO,OOO. With 225 spaces (lot) times $175.00, his costs would be $39, 375. 00.00. Our latest calculations indicate the fee to be $425. 00 (approximately) per lot. Furthermore, the lift station ordinance creating the district has not been approved by the Council, nor the fees established. I also believe that the Council is not receptive to pumping the holding tank on site. See also enclosed, letters from the Department of Health. Etd-1:/";71 Finally, what are the arrangements in regard to the landfill and our meeting with the State? Please call me, as I believe you need to review the materials in this case as soon as possible. Respectfully, ames Johnson Acting City Manager JJ/cw Enclosure ROGER FINHOLT ENTERPRISES 1115 Luke St.,suite 100 Infirm Texas 75061 Phone:Area Code 214-399-1666 April 23, 1987 Mr. James Johnson City Manager City of Wylie 114 N . Ballard Wylie, Texas 75098 Re: Lake Ray Hubbard Mobile Home Estates Wylie, Texas Dear Sir: In regards to our meeting and conversation of yesterday afternoon, after giving this situation some further thought and discussing this at length with my attorney, we have come to the conclusion that the drainage ditch has absolutely nothing to do and should have nothing to do with holding up the opening of this project. The city engineering department did in fact approve our construction project and the drainage system as a good and sound system and it has in fact been built; so consequently nothing the city does from now on will( change the drainage or any responsibility for the drainage system. Moreover, I would like to point out that the adjacent property owner decided to sue me and not include the City of Wylie in the lawsuit. To be quite frank about it, I feel like the City is trying to hold up my project because of the sewer situation and as I previously stated to you at the meeting, I cannot afford to allow this to happen. I have eight mobile homes that are supposed to be moved in by the 30th of April. That was the reason I needed to be put on the agenda for the meeting of the 28th and I have twenty more homes to be moved in the month of May. I cannot afford to allow this situation to drag on and on. As you are aware, I have always tried to and have worked very closely with the City of Wylie on this project and have bent over backwards in this endeavor. This situation must be brought to a head now as any further delays will cause me to consider taking other legal action, which I would prefer not to do. I am going to push to get the entire project completed in the next two weeks and the City of Wylie needs to tell me what I need to do with the drainage ditch so I can appear before the City Council no later than the 12th of May for approval. This means I must be on the agenda by the 5th of May. I need to have something in writing from the city before May 5th in regards to both the drainage ditch and the sewer situation. If a further meeting would help, I would be glad to come to the city anytime you desire. I understand from my conversations with the city and the adjacent land owner, Mr. Allard, that the Allard lawsuit has been settled; and that any such matter is now between me and Mr. Allard. Whether the city allows me to operate this park or not should have nothing to do with the city having already approved the construction project and the drainage plans. The city needs to make up its mind that pumping (continued - page 2) _ Page 2 Mr. James Johnson April 23, 1987 sewerage will be necessary for a short period of time until the sewer system is installed. I am still agreeable to phasing the park in six stages as shown on the map I submitted to you this past Tuesday. This way the city could control how much sewerage they pumped although I would have to have an understanding that at least one-half of the park would be released within the next three months. What am I going to do about these eight mobile homes I have that are supposed to be moved into the park by the end of this month? Are you going to allow me to put these in the park on a temporary permit? Please advise as soon as possible in view of the importance and urgency of this situation. Very truly yours, C. inho RCF/ks cc: I. W. Santry, City Engineer Ron Homeyer, Asst. City Engineer Roy Faires, Code Enforcement Officer Bill Windham, Public Works Director Don White, Development Inspector Burt Shryock John Guittard ‘4 fG4 `r ROGER FINHOLT ENTERPRISES 1115 Luke St,Suite 100 Irvine.Texas 75061 • 1)\I/? , T\ Pbooe:Area Code 214-399-1666 - - April1,1 22, 1987 _ • Mr. James Johnson City Manager City of Wylie 114 N. Ballard Wylie, Texas 75098 Re: Lake Ray Hubbard Mobile Home Estates Wylie, Texas Dear Sir: Attached is a copy of the tape whereas Gus gave me and told me this was the amount I had to pay for sewer impact fees. If:you have any questions, please advise. Very truly yours, r C. Finholt • RCF/ks attachment cc: Burt Shryock r!. i . . . . . , ..\ , • >^' �"• [� \� 'ki r f' \ , "tick t ;. ),o - ft ♦w ti sY r.`i ' ,, ? r,I ' J 't. - .`Sr 1 + < (fk . . • • l t 7 t .!> �{ y\w�,y •Mr.? r r' rye alb..:i ,. t t lj' 4 t r! ,//! r f r Lr kyr f�� \` icy ;I i i ` '.n .T ?.1w.• • • {-fit� >Z .. ...¢jt ,r • L . • r + ti • • b f�1 • F t•I rl, {;ar ^s` ! `. • r rK t s4 ,++, .ir '' f y • • n r T�� r p �, {� 'l�'r . �� \ :)J.r► t rvy. yr ,r- (r i • • r,{y, .�-+.. • • ,•ridgy i''.. /' 5:;1. 1j 44r•,•-ti.},!Y. • ! ,,. 1, ! ;. ,� - t�r , 7 ',1.A ,_ '`tp T• f T ,a$ • 41� � 0 v' E.gM�y 4i .. Hmay: r.. •3. .F r ..'k`„i .� •!' • • + � t r.•,+rt�.y'_.i • YY� 1.+.yra1R )• , r• ! . J.Jt..'.-...-.. -• !,• r. • `I •7 ! 1 ^l�l • `. .4 + �t{;.v ,s Ind + 0'1 r . • I' / r q Y.: X 11 * y / l V r • A. rw • • . •• p ..1 ...1):: i .r + { / .s. �i,. y)t G1 + it { , N ,�: • • r: t r r ,, $ti,rv� • k'Si r r . o It Sr "f } M ,. r .: 4(+ T � (� ., ; ON t •.: ,: ,e,... rl \ •'1r. • I -�! 4'r'�S.'� K • 'I '4t., .'{,NJ.,+-7^4 :4! • ti• ,•' ("`!r •,�3,6., tl ,f•P !tom t�i. 'T3:��Ptilit:H7G"JiTi'::ta.. ..:.raiM1II_.i..'-'t—"c,..:tr,::klr�.......... ....__ —:3iYf'`.411S13`':0r.,,..._•,...... ..:5:::':.._..151:eG3y,..'►''.'. 5;644.4.1 .4 . 4 ER FINHOLT ENTERPRISES 1115 uke St,Suite 100 Irvin&Texas 75061 Phone:Area Code 214-399-1666 April 7, 1987 Mr. Gus Pappas City Manager City of Wylie 114 N. Ballard Wylie, Texas 75098 Re: Lake Ray Hubbard Mobile Home Estates Wylie, Texas Dear Sir: On the 28th of April, I would appreciate your putting us on the City Council agenda for approval by phases of Lake Ray Hubbard Mobile Home Estates. Attached is a drawing showing the park broken down into six phases. We request approval of Phase I at the City Council meeting on April 28th. If the City, Engineering and Planning Department and the City Council will approve this phased method for the park in some fashion, I will be agreeable to limiting the number of mobile homes to be put into the park. I understand we could put up 125 units in the park and the city could still pump sewerage for this many especially if they are senior citizens. It is my understanding that the sewer line will be available July 1, 1987 and this will prevent the city from having to hire any additional pumping facilities and enable the water department to use their own pumping truck. By the 21st of this month, we intend on having all of the water and sewer com- plete and accepted by the engineering department, the drainage completed (subject to the easement being signed by my neighbor to the west) and Phase I completed in its entirety. Please advise if we can be put on the agenda for the 28th of April meeting. Very truly yours, Rog . In It RCF/ks attachment cc: Mr. I. W. Santry Mr. Ron Homeyer Mr. Burt Shryock Park Manager Construction Superintendent 5.1ev %:;je-i* 111N%. 4%1 • 'ilt•"" Texas Department of Health Robert Bernstein, M.D., F.A.C.P. DIVISION OF WATER HYGIENF. A.Commissioner 1100 West 49th Street Deputy t C MacLean,M.D. ConnetEssiona Austin. Texas 78756-3192 Professional Services (512)4 S8-7111 Hermes L•Max March 20, 1987 Deputy Commissioner Management and Administrat Mr. I. W. Santry, Jr., P.E. City of Wylie P. 0. Box 428 • Wylie, Texas 75098 SUBJECT: Proposed Temporary Sewage Conveyance System City of Wylie TWC Permit No. 10384-01 Collin County, Texas :;c.or Mr. Santry: We are in receipt of your letter dated February 2, 1987, requesting approval for "honey wagoning" sewage from new subdivisions, businesses or residences on a temporary basis until a more permanent sewage conveyance system is constructed. Although the use of "honey wagons" is discouraged, this Department will offer no objection under the following conditions: • 1. The holding tanks are fenced with controlled access. 2. Two haul trucks are continuously available for the City. 3. Dual holding tanks are provided at each site, each tank sized for 24-hour storage. 4. Holding tanks shall have a high water alarm system with automatic switch-over to the spare tank. 5. Once a tank alarm system has been enacted, the tank must immediately be emptied by the City. We appreciate your concern for this matter. If you have any questions feel free to contact Mr. Stephen J. Tencza, P.E., of our Plan Review Branch at 512/458-7293 for further assistance. Sincerely, 4:e2 1/47 �• . D. Thurman, P.E.. Chief • Bureau of Environmental Health SJT/re ccs: Collin County Health Department Public Health Region 5 Texas Water Commission -ATTN -WiteriQtiality Division -- — — 4.• .5"..4444$0.- • 14 Texas Department of Health Robert Bernstein,M.D..F.A.C.P. DIVISION OF WATER HYGIENE. Robert A.MacLean,M.O. Commissioner 1100 West 49th Street Deputy Commissioner Austin. Texan 78756-3192 Pro(essona Services (S 12)4 S8-7111 Hernias I..Muter March 24, 1987 Deputy Commissioner Management and Administratio • Mr. I. W. Santry, P.E. City of Wylie P.O. Box 428 Wylie, Texas 75098 • Subject: Temporary Sewage Conveyance System City of Wylie TWC Permit No. 10384-01 Collin County, Texas Dear Mr. Santry: After further discussions with the staff of the Texas Water Commission, we would like to add the following conditions to those of my March 20, 1987 letter in regard to the subject operation: 1. Sewage hauling must be performed by city-owned vehicles or by a licensed private firm. 2. Sewage spills are prohibited. Accidental spills must be removed and treated with granular chlorine disinfectant. 3. Only typical domestic sewage is allowed to be trucked-hauled. 4. Disposal of the trucked sewage at the City of Wylie Wastewater i ' Treatment Plant can only take place during times when the treatment facility is receiving low wastewater flows. 5. Stored sewage must be kept in an aerobic condition with the dissolved oxygen maintained at 1.0 mg/l. 6. Sewage hauling is allowed to- serve only those areas which are 2,000 feet or more away from the nearest sewerage facility and that are within the city limits. The maximum volume of wastewater to be hauled shall not exceed 9,000 gallons per day. 7. Sewage hauling shall not be approved after March 20, 1988. ,-- .2e7L-...44.011..- Mr. I. W. Santry, P.E. March 24, 1987 Page-Two . We appreciate your cooperation in this matter. If you have any questions feel free to contact Mr. Jerry Salgado, P.E. of our Plan Review Branch at . 512/458-7293 for further assistance. Sincerely, / , ; .D. Thurman, P.E., Chief Bureau of Environmental Health • • JS:mer ccs: Collin County Health Department Public Health Region 5 . . Texas Water Commmission _ Attn: Water Quality Division ROGER FINHOLT ENTERPRISES 1115 Luke St,Suite 100 Irving,Texas 75061 Plane:Area Code 214-399-1666 May 1, 1987 Mr. James Johnson City Manager City of Wylie Wylie, Texas Re: City Council Meeting May 4, 1987 at 6: 30 pm regarding Lake Ray Hubbard Mobile Home Estates Dear Mr. Johnson: As previously discussed with you, we need to resolve all our problems so we may open our facility as soon as possible. In regards to our meeting on Monday night, it is my understanding that the problems to be resolved are as follows: OFFSITE WATER 1. The city seems to be worried about a proposed lien by Day Star Sales for materials. To briefly explain this situation, our subcontractor, John Reed, in his contract is paying Day Star Sales, the material supplier, out of the portion of money that comes from the city for oversizing, so consequently, he cannot pay Day Star Sales until the city pays their portion. I think this can be resolved by a simple legal instrument between the city and myself. 2. There apparently is a problem with the county on an asphalt patch along some of the route that John Reed installed the offsite water line on. We have met with the county and we will have a conclusion on this next Tuesday. 3. I received second-hand information that some woman claims John Reed, the offsite contractor, owes her $3,500 due to damage sustained on her car when she hit a mound of dirt apparently when Reed was installing the water line. We would like to see the police report on this. Our subcontractor has insurance to handle this sort of thing. If there has been no police report on this, he will not consider any payment towards this damage. If my understanding is correct, the above items are all the problems concerning the offsite water line. If there are any others, we want to know of them prior to our meeting on Monday night. ONSITE WATER 1. To my knowledge, the only problem with the onsite water line is we have a problem with our subcontractor, D/FW Utility Co. He has failed to return to the site to check out his water system and make adjustments to same, consequently, I have had to hire another contractor to complete the work. We still owe D/FW Utility Co. his 10% retainage which will not be paid until this matter has been settled. Again, we(feel like a simple legal instrument between the city and myself will resolve this matter. 2. Due to the above item, I am going to have to furnish a one-year maintenance bond myself. This is ready to be issued when the interior water and sewer system has been accepted by the City. (continued - page 2) Page 2 gl/tY":11 ‘ Mr. James Johnson May 1, 1987 SEWER IMPACT FEES When I originally made the deal with the City of Wylie, I was told at that time and this can be verified, that the impact fees were $100 per lot. I have 225 lots, so this comes to $22,500. During a meeting I had with Gus Pappas, the ex-city manager, approximately 6 weeks ago, he advised me that it was $175 per lot or $39, 375.00. During a meeting I had with you and your city staff last week, you advised me that the sewer impact fee was $225/lot or $50,625.00. During a conversation I had with you two days ago, you advised me that the sewer impact fee was $422/lot or $94,950. Mr. Johnson, we had in our budget the $22,500 and that is the amount we expect the city to live with. To my knowledge, the above two items are the only problems I have associated with the interior water and sewer system. If there are any others, we want to know of them prior to the meeting on Monday, May 4th. PAYMENT BY CITY FOR OVERSIZING Before I let the contract for the offsite water line, I questioned your city staff several times (copies of letters attached) concerning approval of the amount the city would pay before I let the contract. The total amount due by our calculations from the city was $78,843.50. Mr. Santry now advises me that the city will only pay $58,766.01 . This is a $20, 077.49 difference. I most certainly would not have started the water line unless Mr. Santry had agreed to the $78,843.50. I am in the process of trying to bbtain a breakdown from Mr. Santry on the $58,766.01 so we can have a conversation on this before Monday night. To my knowledge, this is the only problem regarding the payment by city for oversizing. If there are any others, we want to know about them befbre the meeting on Monday. OFFSITE SEWER As you are aware, it is the city's responsibility to bring the sewer to my manhole as previously agreed. According to yourself and your city staff, you are now contemplating running the temporary line up FM 544 to an existing manhole and this, of course, is sometime off as the city, to my knowledge, has done no engineering or anything whatso- ever in this regard. Consequently, the city has to pump sewerage as they did at Southfork until this line is installed. This seems to be the major problem with getting the entire subdivision accepted and I assume will be rectified at the meeting. To my knowledge, the above item is the only problem regarding offsite sewer. If there are any others, we want to know about them prior to the meeting on Monday. OFFSITE DRAINAGE You have previously told me that you will not allow the park to open because of the problem with the offsite drainage and that the city would have liability if you allowed it to open because the adjacent property owner, H. B. Allard, has a lawsuit with me. My attorney advises me that this is not the case but regardless, this should be resolved by a simple instrument, hold harmless or whatever, between the city and myself. As you are aware, the adjacent property owner is making unheard of demands which neither the city nor I can comply with so this problem will have to take its natural course but we are willing to sign any agreement to hold the city harmless or whatever else is required. Perhaps you are not aware, but I am very close to completing this facility. I have the drainage channel completed with the exception of concrete rip-rap and seeding. We are held up on this work until a slight grade change has been made in the channel so we don't feel like this should hold up up on opening the park as we will be agreeable to doing this work and feel the city should accept the facility without it being done (continued - page 3) 6-lL" '44 Page 3 Mr. James Johnson May 1, 1987 so we can open the facility immediately. To my knowledge, the above are all the problems and differences on the entire project. We must have all of the above problems resolved Monday night so we can open the facility Tuesday therefore we request that the city attorney be present along with my attorney so an agreement can be hammered out between them immediately. Apparently your city attorney is not full-time and works for another law firm so we are willing to pay his fee for his time so he may be present at the Monday night meeting. Please advise your thoughts on this matter as soon as possible. Very truly yours, ti oge C. Finholt RCF/ks attachments cc: Burt Shryock J. Stanley Knight 4044 ROGER FINHOLT ENTERPRISES • i 15 L..te St. Sure :00 Inn;-Texas 7_:'61 Phone:Aran Cale 214-399.1665 I January 29, 1987 Mr. I . W. Santry City Engineer City of Wylie P. 0 . Box 423 Wylie, Texas 75098 Re: Lake Ray Hubbard Mobile Home Estates Offsite water line Dear Mr. Santry: Recently I sent you the proposals for the offsite water line extension to bring water to our development. The 13, 940 l.f. of pipe only went to our northern property line. Another sewer and water contractor installed the additional 1, 330 I.f. In addition to the $69, 800. 00 owed by the City of Wylie, you also owe me 1, 330 I .f. of difference between the 12" and 10" along the street frontage of our development as per the attached proposal from my other seti•.er and water contractor. Amount to be paid will be as follows: 1. Proposal you already have in your possession t 03 2. Proposal attached 9, 043. 50 TOTAL 573, 843.50 Please advise. Very truly yours, Roger C. Finhclt RCF/ks attachment cc: Burt Shryock <32/4::444,4: D/FW UTILITY CO., INC. UNDERGROUND UTILITIES 525 W. Rock Island • Grand Prairie, Texas 75C50 P.O. Box 153741 • lrving, Texas 75015 790-3602 790-7576 AUGUST 15, 1986 MR. ROGER FINHOLT 1115 LURE STREET IRVING, TEXAS 75061 TO WHOM IT MAY CONCERN: AN INCREASE OF $9,043.50 WAS RESULTED FROM INCREASING THE WATER MAIN SIZE OF 10" WATER PIPE TO 12". THE INCREASE IS DUE FROM THE FOLLOWING ITEMS: 10" CL-150 WATER PIPE 1,330 LF $ 10.25 LF $13,632.50 12" CL-150 WATER PIPE 1,320 LF 14.05 LF 18,456.00 NET INCREASE $ 4,913.50 10" GATE VALVE 2 EA $635.00 EA $ 1 ,270.00 12" GATE VALVE 6 EA 875.00 EA 5,250.00 NET INCREASE $ 3,980.00 CAST IRON FITTINGS 150 LBS 1.00 LB 150.00 TOTAL INCREASE $ 9,043.50 o_ Quality is long remembered after money is forgotten. ROGER FINHOLT ENTERPRISES ‘d il 1115 �.i- St.,SlIi:e 100 Inin;,Texas 75061 Phone:Arta Code 214.399-1666 January 21, 1987 Mr. I. i . Santry City Engineer City •of Wylie P. 0. Box 428 Wylie, Texas 75098 Re: Offsite Water Line Lake Ray Hubbard Mobile Home Estates Wylie, Texas Dear Mr. Santry: To date I have not received a confirmation from you concerning the city's payment of the $69, 800. 00 per the proposal submitted to you in person by myself and Reed Contractors last week. Reed Contractors has already started the water line installation and I didn't intend on him doing this until you confirmed that the City would pay the $69, 800. 00. Eddie Johnson wrote me on January 19, 1937 concerning the inspection fee in the amount of $2, 410.00. Attached is our check for same. Please advise. Very truly yours, Roger C. Finholt • RCFr'ks attachment cc: Burt Shryock -tZ,ll, -1 r -II 4 CITY OF WYLIE 108 S.JACKSON ST. — P.O. BOX 428 WYLIE,TEXAS 75098 (214)442-2236 January 1‘ , 1' 87 Mr. Roger Finholt 115 Luke Street, Suite 700 Irving, Texas 75061 F:E: Lake Ray Hubbard Mobile Home Park - Off-Site Water Line Dear Mr. Finholt: The off-site water line plans for Lake Ray Hubbard Mcbile Home Park , have been approved by the Wylie City Council and the City Engineer. However, we have not yet received the Inspection Fee for this project which is One ( 1 ) percent of the total construction cost. According to the figures previously submitted this fee should be g2, 41O.00. You may pick UP your sets of plans when this amount is paid in full at the Engineering Office. If you have any questions please feel free to contact me at Thank vou, � DiC Jcdoxj Eddie i=hnson Eng. Tecnnician EJ/am cc : I .W. Santry, Jr. , P. E. , City Engineer Files . . . . R eed Contractors, Inc. v‘le--t'" Complete Land Development 541 W. ''.3in St.e l'0 Lewisville, Texas 75067 (214) 221=1374 (214) 221-1917 October 29, 1986 Roger Finholt 1115 Luke St. Suite 100 Irving, Tx. 75061 PROPOSAL RE: Lake Ray Hubbard Mobil Home Estates offsite water line 14" P.V.C. • 2,960 L.F. @ 17.05 L.F. S50,468.0,0 12" P.V.C. 10,980 L.F. @ 13.46 L.F. $147, 790.80 14" Gate Valve & Box 4 Ea. @ 2,251.10 Ea. $9,004.40 12 " Gate Valve & Box 12 Ea. @ $823.10 Ea. $9,377.20 14 x 12 Reducer 2 Ea. @ $390.18 Ea. S730.36 14" Cross 1 Ea. ` $S43.60 Ea. c„ 3.c ,3 14" Plug 2 Ea. @ $225,36 Ea. $450.52 12" Plug 7 Ea. @ $157.24 Ea. $1,100.68 .F 1.P e- a 14 x 6 Tee @ $492.20 Ea. c.!92,_0 Fire rvdrant 4 Ea. 3 $043.60 La. $3,374.; 14 x 12 Cross 1 Ea. @ $764.10 Ea. $764.10 14 x 12 Tee 1 Ea. @ $526,74 Ea. $526.74 12 x 6 Tee 3 Ea. @ S416.50 Ea. $1,249.50 12" Tee 5 Ea. @ $435.58 Ea. $2,177.90 12x 8 Reducer 1 Ea. @ $287.80 Ea. S287.50 5" Plug 1 Ea. @ S107.86 Ea. S107.56 12" 45° Bend 9 Ea. @ $370.66 Ea. $3,335.94 Road & driveway excavation & Repair Lump Sum - $8,368.00 TOTAL THIS PROPOSAL $241,000.00 ,<_,•ce .eed Contractors John Reed JR/lr • ' / g / . BIG D CONSTRUCTION CO. 1115 Luke St-.Suite 100 Irving.Texas 75061 +/-L4:i"-- ;14/4 Phone:Area Code 214-399-1666 December 12, 1986 Mr. John need Reed Contractors, Inc. 5:11 W. Main, Suite 100 Lewisville, Texas 75067 Re: Lake Ray Hubbard Mobile Home Estates Wylie, Texas Dear Joh I just tal ed to Mr. Santry, the City Engineer with the City of Wylie and he advises Ehat he needs a breakdown of my cost and the city's cost per your recent bid submitted. We need this within the next few days so I can get it to Mi.. Santry and he can get it approved by the City Council on December 23rd. Please advise. Very truly yours, Roger C. Finholt RCF/ks cc: Burt Shryock