Loading...
08-13-2019 (City Council) Agenda Packet Wylie City Council NOTICE OF MEETING Regular Meeting Agenda August 13, 2019 - 6:00 pm Wylie Municipal Complex Council Chambers 300 Country Club Road, Building #100 Wylie, Texas 75098 Eric Hogue Mayor David R. Duke Place 1 Matthew Porter Place 2 Jeff Forrester Mayor Pro Tern Candy Arrington Place 4 Timothy T.Wallis, DVM Place 5 David Dahl Place 6 Chris Hoisted City Manager Richard Abernathy City Attorney Stephanie Storm City Secretary In accordance with Section 551.042 of the Texas Government Code, this agenda has been posted at the Wylie Municipal Complex, distributed to the appropriate news media, and posted on the City website: www.wylietexas.gov within the required time frame. As a courtesy, the entire Agenda Packet has also been posted on the City of Wylie website: www.wylietexas.gov. The Mayor and City Council request that all cell phones and pagers be turned off or set to vibrate. Members of the audience are requested to step outside the Council Chambers to respond to a page or to conduct a phone conversation. The Wylie Municipal Complex is wheelchair accessible. Sign interpretation or other special assistance for disabled attendees must be requested 48 hours in advance by contacting the City Secretary's Office at 972.516.6020. Hearing impaired devices are available from the City Secretary prior to each meeting. CALL TO ORDER Announce the presence of a Quorum INVOCATION & PLEDGE OF ALLEGIANCE PRESENTATIONS 00 Battle of the Badges Award 00 Senator Pat Fallon -Legislative Update August 13,2019 Wylie City Council Regular Meeting Agenda Page 2 of 4 CITIZENS COMMENTS ON NON-AGENDA ITEMS Residents may address Council regarding an item that is not listed on the Agenda. Residents must fill out a non- agenda form prior to the meeting in order to speak. Council requests that comments be limited to three (3) minutes. In addition, Council is not allowed to converse, deliberate or take action on any matter presented during citizen participation. CONSENT AGENDA All matters listed under the Consent Agenda are considered to be routine by the City Council and will be enacted by one motion. There will not be separate discussion of these items. If discussion is desired, that item will be removed from the Consent Agenda and will be considered separately. A. Consider, and act upon, approval of the Minutes of July 23, 2019 Regular Meeting and July 23,2019 Work Session of the Wylie City Council. (S. Storm, City Secretary) B. Consider, and act upon, a final plat of Woodlake Village Addition Lot 1 Block D, to allow for a Police or Fire Station use on 7.136 acres, located at 2000 N. State Highway 78. (J. Haskins, Planning Manager) C. Consider, and act upon, Ordinance No. 2019-18 a change of zoning from Neighborhood Services (NS) to Planned Development (PD-NS), to allow for a Wholesale Contractors Maintenance Yard use on 1.89 acres,located at 634 North Ballard. ZC 2019-09. (J. Haskins, Planning Manager) D. Consider,and act upon,Ordinance No.2019-19 setting a date for a public hearing on October 8,2019 to discuss and review updates to the Land Use Assumptions and Capital Improvements Plan. (T. Porter, Public Works Director) E. Consider, and act upon,the approval of a Job Order Contract#W2019-71-I for the Remodel of the Utility Billing Department Windows from Core Construction, Inc. in the estimated amount of$59,456.53 through a cooperative purchasing contract with National Cooperative Purchasing Alliance (NCPA), and authorizing the City Manager to execute any necessary documents. (G. Hayes, Purchasing Manager) REGULAR AGENDA 1. Hold a Public Hearing to consider, and act upon, a change of zoning from Agricultural-30 (AG-30) to Single Family(SF 10/24), to allow for single family development, not to exceed 49 residential lots on 16.48 acres,located at 2605 E.Stone Road. ZC 2019-10(J.Haskins,Planning Manager) Executive Summary The applicant is requesting to rezone a 16.48-acre property located on East Stone Road from AG/30 to Single Family(SF 10/24)for a single-family development of no more than 49 residential lots and one open space lot. The property currently contains a single-family home and was annexed into the City in 2014. The property is generally bordered on the east and west by low density residential and to the north by a utility use,all outside the city limits,and a planned development residential development to the south,located within city limits. August 13,2019 Wylie City Council Regular Meeting Agenda Page 3 of 4 2. Consider, and act upon, Resolution No. 2019-19(R) of the City Council of the City of Wylie, Texas, accepting the proposed property tax rate for fiscal year 2019-2020, accepting the calculation of the effective tax rate, establishing dates for public hearings on the proposed property tax rate, and providing for the publication as provided by the Texas Local Government Code, Section 140.010. (M. Beard, Finance Director) Executive Summary The City is required by law to follow certain meeting and notice (publication) guidelines identified in the "Truth in Taxation"guide. In accordance with the"Truth in Taxation"laws of the State of Texas,the effective and rollback tax rates and other information must be published and two public hearings must be held if an entity's proposed tax rate exceeds the lower of either the effective tax rate or the rollback tax rate. This year's effective tax rate is$0.688454 and the rollback tax rate is $0.723543. 3. Consider, and act upon, Ordinance No. 2019-20 amending Ordinance No. 2018-24, which established the budget for fiscal year 2018-2019; providing for repealing, savings and severability clauses; and providing for an effective date of this ordinance. (M. Beard, Finance Director) Executive Summary Staff is recommending a transfer of$1,300,000 from the General Fund to a new Capital Fund (461) for Fire Station#2. The$1.3 million is included in the Fire Department's 2018-2019 budget for remodel of Fire Station #2. This money was from General Fund Balance in the 2018-2019 budget. Council discussed the Fire Station #2 remodel and decided to forgo the remodel and pursue building Fire Station#2 on the land adjacent to the Municipal Complex. The amendment is to move the money from the Fire Department's budget into Combined Services"Transfer to Capital Fund"account in the General Fund. The$1.3 million will then be moved to the Capital Fund 461 fund balance for the future construction of Fire Station#2. 4. Consider, and act upon, the appointment of a board member to the North Texas Municipal Water District (NTMWD) Board to fill an expired term of June 1, 2019 to May 31, 2021. (S. Storm, City Secretary) Executive Summary The Board of Directors of the North Texas Municipal Water District (NTMWD) is a policy making body similar in nature to the City Council. The Board is responsible to both the State of Texas and to the member Cities for assuring that NTMWD operations occur in accordance with state and federal law,in alignment with NTMWD policy, and in the best interests of the Cities receiving services. EXECUTIVE SESSION If during the course of the meeting covered by this notice,the City Council should determine that a closed or executive meeting or session of the City Council or a consultation with the attorney for the City should be held or is required, then such closed or executive meeting or session or consultation with attorney as authorized by the Texas Open Meetings Act,Texas Government Code§551.001 et. seq.,will be held by the City Council at the date,hour and place given in this notice as the City Council may conveniently meet in such closed or executive meeting or session or consult with the attorney for the City concerning any and all subjects and for any and all purposes permitted by the Act,including,but not limited to,the following sanctions and purposes: Texas Government Code Section: §551.071—Private consultation with an attorney for the City. §551.072—Discussing purchase,exchange,lease or value of real property. §551.074—Discussing personnel or to hear complaints against personnel. §551.087--Discussing certain economic development matters. §551.073—Discussing prospective gift or donation to the City. §551.076—Discussing deployment of security personnel or devices or security audit. Recess into Closed Session in compliance with Section 551.001, et.seq. Texas Government Code, to wit: August 13,2019 Wylie City Council Regular Meeting Agenda Page 4 of 4 RECONVENE INTO OPEN SESSION Take any action as a result from Executive Session. READING OF ORDINANCES Title and caption approved by Council as required by Wylie City Charter,Article III,Section 13-D. ADJOURNMENT CERTIFICATION I certify that this Notice of Meeting was posted on August 9, 2019 at 5:00p.m. as required by law in accordance with Section 551.042 of the Texas Government Code and that the appropriate news media was contacted. As a courtesy, this agenda is also posted on the City of Wylie website: www.wylietexas.gov. Stephanie Storm,City Secretary Date Notice Removed Wylie City Council Minutes Regular Meeting July 23, 2019—6:00 p.m. Wylie Municipal Complex—Council Chambers 300 Country Club Road, Bldg. 100 Wylie, TX 75098 CALL TO ORDER Mayor Eric Hogue called the regular meeting to order at 6:00 p.m. The following City Council members were present: Councilman David R. Duke, Councilman Matthew Porter, Mayor pro tern Jeff Forrester, Councilwoman Candy Arrington, Councilman Timothy T. Wallis (6:02), and Councilman David Dahl. Staff present included: City Manager Chris Holsted; Assistant City Manager Brent Parker; Assistant City Manager Renae 011ie; Police Chief Anthony Henderson; Chief Building Official Bret McCullough; Public Information Officer Craig Kelly; Parks and Recreation Director Robert Diaz; Finance Director Melissa Beard; Fire Chief Brandon Blythe; Public Works Director Tim Porter; Library Director Rachel Orozco; Human Resources Director Lety Yanez; Planning Manager Jasen Haskins; WEDC Executive Director Sam Satterwhite; Project Engineer Wes Lawson; City Secretary Stephanie Storm, and various support staff. INVOCATION& PLEDGE OF ALLEGIANCE Mayor Hogue gave the invocation and Councilwoman Arrington led the Pledge of Allegiance. Councilman Wallis took his seat at the dais. PRESENTATIONS 0o Wylie PD Promotional Badge Pinning Police Chief Henderson administered the Texas Oath of Honor to newly appointed Lieutenant Randy Hooker. Lieutenant Hooker was pinned by his wife. CITIZEN COMMENTS ON NON-AGENDA ITEMS Residents may address Council regarding an item that is not listed on the Agenda. Residents must fill out a non- agenda form prior to the meeting in order to speak. Council requests that comments be limited to three (3) minutes. In addition, Council is not allowed to converse, deliberate or take action on any matter presented during citizen participation. There were no citizens present wishing to address Council. Minutes July 23,2019 Wylie City Council Page 1 CONSENT AGENDA All matters listed under the Consent Agenda are considered to be routine by the City Council and will be enacted by one motion. There will not be separate discussion of these items. If discussion is desired, that item will be removed from the Consent Agenda and will be considered separately. A. Consider, and act upon, approval of the Minutes of July 9, 2019 Regular Meeting, July 9, 2019 Work Session and July 11, 2019 Special Called Work Session of the Wylie City Council. (S. Storm, City Secretary) B. Consider, and act upon, a vendor application for the Fall Fire Classic Softball Tournament event to be held at Founders Park on October 27, 2019. (R. Diaz, Parks &Recreation Director) C. Consider, and place on file, the City of Wylie Monthly Revenue and Expenditure Report for June 30, 2019. (M. Beard, Finance Director) D. Consider, and place on file, the City of Wylie Monthly Investment Report for June 30, 2019. (M. Beard, Finance Director) E. Consider, and act upon, granting an extension of time for the FY 2019-20 proposed budget filing with the City Secretary from August 5, 2019 to August 9, 2019 per the Home Rule Charter; Article VII, Section 2. (M. Beard, Finance Director) F. Consider, and place on file, the monthly Revenue and Expenditure Report for the Wylie Economic Development Corporation as of June 30,2019. (S. Satterwhite, WEDC Director) Council Action A motion was made by Mayor pro tem Forrester, seconded by Councilwoman Arrington, to approve the Consent Agenda as presented. A vote was taken and motion passed 7-0. REGULAR AGENDA 1. Hold a Public Hearing and consider, and act upon, a change of zoning from Neighborhood Services (NS) to Planned Development (PD-NS), to allow for a Contractor's Maintenance Yard use on 1.89 acres, located at 634 North Ballard. ZC 2019-09 (J. Haskins, Planning Manager) Staff Comments Planning Manager Haskins addressed Council stating the applicant is requesting to rezone one lot of approximately 1.89 acres located at 634 North Ballard Street. In May Council requested the applicant reapply for zoning under a Planned Development (PD) citing concerns about the other potential uses allowed in Commercial Corridor (CC) should the applicant sell the property. The development standards of the proposed PD allow for Wholesale Contractor's Maintenance Yard as an allowed use within the Neighborhood Services (NS) zoning district on the subject property. The conditions of this PD require the zoning to revert to the baseline NS zoning if the existing telecommunications engineering firm ceases to own or occupy the subject property. Additionally, as part of the development standards, the applicant will also be required to screen the outside storage areas from adjacent residential properties and streets, and parking space for this development will be at a ratio of one space for every 500 square feet of main building area. Public Hearing Mayor Hogue opened the public hearing on ZC2019-09 at 6:10 p.m. asking anyone present wishing to address Council to come forward. Minutes July 23,2019 Wylie City Council Page 2 No citizens were present wishing to address Council. Mayor Hogue closed the public hearing at 6:10 p.m. Council Action A motion was made by Councilman. Porter seconded by Councilwoman Arrington, to recommend approval regarding a change of zoning from Neighborhood Services (NS) to Planned Development (PD- NS), to allow for a Wholesale Contractor's Maintenance Yard use on 1.89 acres, located at 634 North Ballard ZC 2019-09. A vote was taken and motion passed 7-0. 2. Consider, and act upon, authorizing the City Manager to execute all documents to pay for an environmental cleanup located in the area of Steel Road and Decker Drive in the amount of $50,264. (B. Parker, Asst. City Manager) Staff Comments Assistant City Manager Parker addressed Council stating he received an update from the cleanup company, and the insurance company has authorized them to proceed with the final cleanup and will pay for it entirely; there will no cost to the City. Parker requested direction from Council for potential future events, if the originator cannot fund the cleanup. Direction from Council was to recoup the money spent by the City. Council Action No action was taken by Council on this item. 3. Consider, and act upon, accepting a donation to the City in the amount of$7,829.00 from the Friends of the Smith Public Library to the Rita and Truett Smith Public Library. (R. Orozco, Library Director) Staff Comments Library Director Orozco addressed Council stating the Friends of the Smith Public Library would like to donate funds to the City to assist with the library's computer lab. Council Action A motion was made by Councilman Porter seconded by Councilman Dahl, to recommend accepting a donation to the City in the amount of$7,829 from the Friends of the Smith Public Library to the Rita and Truett Smith Public Library. A vote was taken and motion passed 7-0. 4. Consider, and act upon, Ordinance No. 2019-17 amending Ordinance No. 2018-24 (2018- 2019 Budget) for proposed budget amendments for fiscal year 2018-2019; providing for repealing, savings and severability clauses; and providing an effective date of this ordinance. (M. Beard, Finance Director) Staff Comments Finance Director Beard addressed Council stating staff is requesting to amend the fiscal year 2018-2019 budget for the donation approved in Item 3. The revenue will be credited to the General Fund and the expense will be allocated to the library to spend the funds. It is a neutral effect to the budget. Council Action A motion was made by Mayor pro tern Forrester seconded by Councilman Wallis, to approve Ordinance No. 2019-17 amending Ordinance No. 2018-24 (2018-2019 Budget) for proposed budget amendments for Minutes July 23,2019 Wylie City Council Page 3 fiscal year 2018-2019; providing for repealing, savings and severability clauses; and providing an effective date of this ordinance. A vote was taken and motion passed 7-0. Mayor Hogue convened the Council into Executive Session at 6:20 p.m. EXECUTIVE SESSION If during the course of the meeting covered by this notice,the City Council should determine that a closed or executive meeting or session of the City Council or a consultation with the attorney for the City should be held or is required, then such closed or executive meeting or session or consultation with attomey as authorized by the Texas Open Meetings Act,Texas Government Code§ 551.001 et. seq.,will be held by the City Council at the date,hour and place given in this notice as the City Council may conveniently meet in such closed or executive meeting or session or consult with the attorney for the City concerning any and all subjects and for any and all purposes permitted by the Act,including, but not limited to,the following sanctions and purposes: Texas Government Code Section: §551.071—Private consultation with an attorney for the City. §551.072—Discussing purchase,exchange,lease or value of real property. §551.074—Discussing personnel or to hear complaints against personnel. §551.087—Discussing certain economic development matters. §551.073 Discussing prospective gift or donation to the City. §551.076 -Discussing deployment of security personnel or devices or security audit. Recess into Closed Session in compliance with Section 551.001, et.seq. Texas Government Code, to wit: SECTION 551.087. DISCUSSING CERTAIN ECONOMIC DEVELOPMENT MATTERS. CLOSED MEETING. This chapter does not require a governmental body to conduct an open meeting: (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1). 0o Deliberation regarding commercial or financial information that the WEDC has received from a business prospect and to discuss the offer of incentives for Project 2019-6a, 2019-6b, and 2019-7a. SECTION 551.072. DELIBERATION REGARDING REAL PROPERTY; CLOSED MEETING. A governmental body may conduct a closed meeting to deliberate the purchase, exchange, lease, or value of real property if deliberation in an open meeting would have a detrimental effect on its negotiating position. 0o Consider the sale or acquisition of property located near Highway 78 and Cooper Drive. RECONVENE INTO OPEN SESSION Take any action as a result from Executive Session. Mayor Hogue reconvened into Open Session at 7:01 p.m. Council Action A motion was made by Councilman. Porter seconded by Councilman Duke, to authorize the Wylie EDC to formalize negotiations with Project 2019-6a via the development and approval of a Performance Agreement outlining the provision of incentives designed to secure new investment and create new primary jobs as presented in Executive Session, specific details not provided at this time as negotiations continue for final agreement. A vote was taken and motion passed 7-0. Minutes July 23,2019 Wylie City Council Page 4 Council Action A motion was made by Mayor pro tern Forrester seconded by Councilman Wallis, to authorize the Wylie Economic Development Corporation to enter into Performance Agreement with SAF Holland for the funding of a job training program in an amount not to exceed $11,500 as presented in Executive Session. A vote was taken and motion passed 7-0. READING OF ORDINANCE Title and caption approved by Council as required by Wylie City Charter,Article III, Section 13-D. City Secretary Storm read the caption to Ordinance No. 2019-17 into the official record. ADJOURNMENT A motion was made by Mayor pro tern Forrester, seconded by Councilman.Duke, to adjourn the meeting at 7:03 p.m. A vote was taken and the motion passed 7-0. Eric Hogue,Mayor ATTEST: Stephanie Storm, City Secretary Minutes July 23,2019 Wylie City Council Page 5 Wylie City Council 01 Minutes Work Session July 23, 2019—7:00 p.m. Wylie Municipal Complex—Council Chambers 300 Country Club Road, Bldg. 100 Wylie, TX 75098 CALL TO ORDER Announce the presence of a Quorum. Mayor Eric Hogue called the work session to order at 7:04 p.m. The following City Council members were present: Councilman David R. Duke, Councilman Matthew Porter, Mayor pro tern Jeff Forrester, Councilwoman Candy Arrington, Councilman Timothy T. Wallis, and Councilman David Dahl. Staff present included: City Manager Chris Hoisted; Assistant City Manager Brent Parker; Assistant City Manager Renae 011ie; Police Chief Anthony Henderson; Chief Building Official Bret McCullough; Public Information Officer Craig Kelly; Parks and Recreation Director Robert Diaz; Finance Director Melissa Beard; Fire Chief Brandon Blythe; Public Works Director Tim Porter; Library Director Rachel Orozco; Human Resources Director Lety Yanez; WEDC Executive Director Sam Satterwhite; City Secretary Stephanie Storm, and various support staff. WORK SESSION co Discuss the potential partnership with Enterprise Fleet Management for the city's fleet. (B. Parker, Asst. City Manager) Assistant City Manager Parker addressed Council stating the city's vehicle fleet continues to grow to meet the demands of the city. Staff has researched options to address fleet management, and Enterprise Fleet Management was identified as an option to provide a true fleet management program. Nathan Pickle, representing Enterprise Fleet Management, gave a presentation that included a financial analysis and an overview of the fleet management program, which included the account team, programs and services, tools and technology, implementation process, and accountability. Pickle responded to questions from Council. The consensus of Council was for staff to explore a Fleet Management Program. 00 Discuss update on remodel and expansion of Public Safety Building. (B. Parker, Asst. City Manager) Assistant City Manager Parker addressed Council stating staff has been working with Pogue Construction and Architects Design Group (ADG) over the last several months to finalize the construction documents to obtain a guaranteed max price. Parker gave an update on the site plan, floor plan, front elevation, available funding, estimated budget, and project schedule. Minutes July 23,2019 Wylie City Council Work Session Page 1 Parker reported there has been a construction increase of $618,104.73, there are two requested alternatives, a metal security fence and covered parking, and four FFE requests that include owner- supplied equipment, dispatch consoles, furniture, and fitness equipment. Council gave direction to move forward with including a metal security fence and four covered parking spaces. 00 FY 2019-2020 Budget Discussion. City Manager Hoisted addressed Council regarding the FY 2019/20 proposed budget, including expenditures and revenues for the following funds. Hoisted answered questions regarding the proposed FY 2019/20 budget. O Utility Fund O 4B Sales Tax Fund O Fire Training Center Fund O Municipal Court Technology Fund O Municipal Court Building Security Fund O Hotel Occupancy Tax Fund O General Fund O New Capital Project Fund City Manager Hoisted gave recommendations for department ELS requests to be included in the proposed budget. Hoisted gave scenarios of available funding for the new capital project fund if certain tax rates were requested by Council. Hoisted requested Council direction regarding the tax rate. Councilwoman Arrington and Councilman Dahl gave direction for an effective tax rate plus $.02. Mayor Hogue, Mayor pro tern Forrester, and Councilmen Porter, Wallis, and Duke gave direction to move forward with an effective tax rate for further consideration and discussion. Staff answered budget-related questions from Council. Hoisted reported based on Council direction the effective tax rate will be published at the August 13 meeting as the proposed tax rate. September 10 will be the consideration and adoption of the tax rate and budget. ADJOURNMENT A motion was made by Councilman Dahl, seconded by Councilman Duke, to adjourn the meeting at 9:10 p.m. A vote was taken and the motion passed 7-0. Eric Hogue,Mayor ATTEST: Stephanie Storm, City Secretary Minutes July 23,2019 Wylie City Council Work Session Page 2 Wylie CityCouncil Y AGENDA REPORT Meeting Date: August 13, 2019 Item Number: B Department: Planning (City Secretary's Use Only) Prepared By: Jasen Haskins Account Code: Date Prepared: August 2, 2019 Exhibits: 1 Subject Consider, and act upon, a Final Plat of Woodlake Village Addition Lot 1 Block D, to allow for a Police or Fire Station use on 7.136 acres,located at 2000 N. State Highway 78. Recommendation Motion to recommend approval regarding a Final Plat of Woodlake Village Addition Lot 1 Block D,to allow for a Police or Fire Station use on 7.136 acres,located at 2000 N. State Highway 78. Discussion OWNER: City of Wylie APPLICANT: Brent Parker,ASM City of Wylie The 7.136 acre tract is located at 2000 N. SH 78 between Eubanks Lane and Spring Creek Parkway, and is zoned Commercial Corridor—Special Use Permit. This final plat creates one lot for a Police/Fire Station Use. The plat dedicates the necessary firelane, access, and utility easements. The plat is technically correct and abides by all aspects of the City of Wylie Subdivision Regulations. Approval is subject to additions and alterations as required by the City Engineering Department. P&Z Discussion The Commission recommended approval 6-0 Page 1 of I OWNER'S CERTIFICATE & DEDICATION STATEMENT ' LEGEND STATE OF TEXAS ) ) COUNTY OF COLLIN ) 0 . . . SET 1/2"REBAR WITH ALUMINUM CAP STAMPED "MLA RPLS 4873"(UNLESS NOTED OTHERWISE) WHEREAS, CITY OF WYLIE IS THE SOLE OWNER OF THAT CERTAIN TRACT OR PARCEL OF LAND LOCATED IN THE ° DIMENSION POINT, NOTHING SET OR FOUND FRANCISCO DE LA PINA SURVEY,ABSTRACT NO. 688, COLLIN COUNTY, TEXAS, BEING ALL OF THAT CERTAIN TRACT OF`IV MI . . . FOUND MONUMENT AS DESCRIBED LAND DESCRIBED IN A DEED TO CITY OF WYLIE,RECORDED IN VOLUME 2216,PAGE 990,DEED RECORDS, COLLIN COUNTY, TEXAS,AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: FD . . . FOUND 60 0 60 120 180 D.R.C.C.T . . . DEED RECORDS, COLLIN COUNTY, TEXAS BEGINNING AT A 1/2"REBAR FOUND AT THE SOUTHWEST CORNER OF SAID CITY OF WYLIE TRACT, SAID POINT BEING ON FD 1/2"REBAR WITH BLUE P.R.C.C.T. . . . PLAT RECORDS, COLLIN COUNTY, TEXAS THE NORTH RIGHT OF WAY LINE OF STATE HIGHWAY NO. 78, SAID POINT ALSO BEING THE SOUTHEAST CORNER OF LOT \ PLASTIC CAP STAMPED M.R.C.C.T. . . . MAP RECORDS, COLLIN COUNTY, TEXAS 1,BLOCK A, WOODLAKE VILLAGE ADDITION,AN ADDITION TO THE CITY OF WYLIE, COLLIN COUNTY, TEXAS,RECORDED IN \i G-ORRONDONA&ASSOC." GRAPHIC SCALE 1"=60' VOLUME G,PAGE 385,PLAT RECORDS, COLLIN COUNTY, TEXAS; \-..•..'5g��, \ I T ( O.P.R.C.C.T. . . . OFFICIAL PUBLIC RECORDS, COLLIN COUNTY, TEXAS R.P.R.C.C.T. . . . REAL PROPERTY RECORDS, COLLIN COUNTY, TEXAS THENCE ALONG THE WEST LINE OF SAID CITY OF WYLIE TRACT AND THE EAST LINE OF SAID LOT 1,NORTH 00 DEGREES 53 MINUTES 14 SECONDS WEST A DISTANCE OF 776.00 FEET TO A 1/2"REBAR WITH ALUMINUM CAP STAMPED"MLA RPLS \ \ _ 4873"SET AT THE NORTHWEST CORNER OF SAID CITY OF WYLIE TRACT, SAID POINT BEING ON THE SOUTH RIGHT OF WAY LINE OF CENTENNIAL DRIVE, SAID POINT ALSO BEING THE NORTHEAST CORNER OF SAID LOT 1; \ \ VICINITY MAP THENCE ALONG THE NORTH LINE OF SAID CITY OF WYLIE TRACT AND SAID SOUTH RIGHT OF WAY LINE, NORTH 75 DEGREES 47 MINUTES 25 SECONDS EAST A DISTANCE OF 389.44 FEET TO A 1/2"REBAR WITH ALUMINUM CAP STAMPED \ \ "J 1/2"REBAR WITH I SCALE 1"= 1,000' "MLA RPLS 4873"SET AT THE NORTHEAST CORNER OF SAID CITY OF WYLIE TRACT FROM WHICH A 1/2"REBAR WITH ALUMINUM CAP STAMPED ALUMINUM CAP STAMPED"JPH LAND SURVEYING"FOUND BEARS NORTH 61 DEGREES 11 MINUTES 42 SECONDS WEST A "JPH LAND SURVEYING" LOT 1 R-5, BLOCK C, I W DISTANCE OF 0.58 FEET,• \ \ WOODLAKE VILLAGE CC#2004-0143897 z 7 O.P.R.C.C.T I Q THENCE ALONG THE EAST LINE OF SAID CITY OF WYLIE TRACT, SOUTH 00 DEGREES 53 MINUTES 14 SECONDS EAST A \ \ DISTANCE OF 877.43 FEET TO A 1/2"REBAR FOUND AT THE SOUTHEAST CORNER OF SAID CITY OF WYLIE TRACT, SAID COI°1\11AL POINT BEING ON SAID NORTH RIGHT OF WAY LINE OF STATE HIGHWAY NO. 78; Y THENCE ALONG THE SOUTH LINE OF SAID CITY OF WYLIE TRACT AND SAID NORTH RIGHT OF WAY LINE, NORTH 89 \ \ /� SITE cr W DEGREES 06 MINUTES 46 SECONDS EAST A DISTANCE OF 376.00 FEET TO THE POINT OF BEGINNING,CONTAINING FD 1/2"REBAR wires p p„ U 310,845 SQUARE FEET OR 7.136 ACRES OF LAND,MORE OR LESS. ALUMINUM CAP STAMPED I Z � "JPH LAND SURVEYING" NOW, THEREFORE,KNOW ALL MEN BY THESE PRESENTS: \ LOT 1R-3R1, BLOCK C WOODLAKE VILLAGE LOT 1R-3R2R, BLOCK C, STATE HIGHWAY NO.78 THAT CITY OF WYLIE,ACTING HEREIN BY AND THROUGH HIS(ITS)DULY AUTHORIZED OFFICERS, DOES HEREBY ADOPT \ CABINET R, SLIDE 137, WTHIS PLAT DESIGNATING THE HEREIN ABOVE DESCRIBED PROPERTY AS LOT 1,BLOCK D, WOODLAKE VILLAGE \ P.R.C.C.T. WOODLAKE VILLAGE _ Z ADDITION,AN ADDITION TO THE CITY OF WYLIE, TEXAS AND DOES HEREBY DEDICATE,IN FEE SIMPLE, TO THE PUBLIC \ CC NO. 20070123010000220, I 127.37' FD YELLOW REBAR WITH USE FOREVER, THE STREETS, RIGHTS-OF-WAY,AND OTHER PUBLIC IMPROVEMENTS SHOWN THEREON. THE STREETS O.P.R.C.C.T. YELLOW PLASTIC CAP AND ALLEYS, IF ANY,ARE DEDICATED FOR STREET PURPOSES. THE EASEMENTS AND PUBLIC USE AREAS,AS SHOWN, \ I iZt STAMPED"RPLS5587" DEVONSHIRE ARE DEDICATED, FOR THE PUBLIC USE FOREVER, FOR THE PURPOSES INDICATED ON THIS PLAT.NO BUILDINGS, \ = z CALLIE FENCES, TREES, SHRUBS OR OTHER IMPROVEMENTS OR GROWTHS SHALL BE CONSTRUCTED OR PLACED UPON, OVER ICQ VVYNDHAM OR ACROSS THE EASEMENTS AS SHOWN,EXCEPT THAT LANDSCAPE IMPROVEMENTS MAYBE PLACED IN LANDSCAPE \ \ I EASEMENTS, lF APPROVED BY THE CITY COUNCIL OF THE CITY OF WYLIE. IN ADDITION, UTILITY EASEMENTS MAYALSO LOT 1R-4RR, BLOCK C, I: W SHEPARD i� BE USED FOR THE MUTUAL USE AND ACCOMMODATION OF ALL PUBLIC UTILITIES DESIRING TO USE OR USING THE SAME WOODLAKE VILLAGE co •a UNLESS THE EASEMENT LIMITS THE USE TO PARTICULAR UTILITIES, SAID USE BY PUBLIC UTILITIES BEING SUBORDINATE LOT 1, BLOCK A, CC NO. 20070123010000220, o DONNA TO THE PUBLIC'S AND CITY OF WYLIE'S USE THEREOF. THE CITY OF WYLIE AND PUBLIC UTILITY ENTITIES SHALL HAVE \ \ O.P.R.C.C.T. °, SHAHI GROUP OLD KNOLL �- THE RIGHT TO REMOVE AND KEEP REMOVED ALL OR PARTS OF ANY BUILDINGS,FENCES, TREES,SHRUBS OR OTHER o�I ADDITION IMPROVEMENTS OR GROWTHS WHICH MAY IN ANY WAY ENDANGER OR INTERFERE WITH THE CONSTRUCTION, \ CC NO. 20060726010003180, MAINTENANCE, OR EFFICIENCY OF THEIR RESPECTIVE SYSTEMS IN SAID EASEMENTS. THE CITY OF WYLIE AND PUBLIC UTILITY ENTITIES SHALL AT ALL TIMES HAVE THE FULL RIGHT OF INGRESS AND EGRESS TO OR FROM THEIR \ O.P.R.C.C.T. RESPECTIVE EASEMENTS FOR THE PURPOSE OF CONSTRUCTING,RECONSTRUCTING,INSPECTING,PATROLLING, MAINTAINING, READING METERS,AND ADDING TO OR REMOVING ALL OR PARTS OF THEIR RESPECTIVE SYSTEMS\ FD STAMPED REBAR WITH ALUMINUM I ACCESS EASEMENT GENERAL NOTES CAP "JPH LAND FD"PK-NAIL"WITH WASHER VOLUME 5552,PAGE 408, \ (SURVEYING'N 61' ' " FD 1/2"REBAR WITH ALUMINUM CAP WITHOUT THE NECESSITY AT ANY TIME PROCURING PERMISSION FROM ANYONE FROM PROPERTY CORNERI I42W0.58' STAMPED"JPH LAND SURVEYING"0.49'WEST OF CITY STAMPED"JPH LAND SURVEYING"0.23' D R.C.C.T. OF WYLIE TRACT EAST LINE( S 00°53'14"W 877.43' WEST OF CITY OF WYLIE TRACT EAST LINE (HATCHED) FD 5/8"REBAR 1. THE BASIS OF BEARINGS FOR THIS SURVEY IS THE TEXAS COORDINATE SYSTEM NORTH • • ••• CENTRAL ZONE(NAD 83)DERIVED FROM GPS OBSERVATIONS USING THE DALLAS/FORT WORTH WITNESS, MY HAND AT WYLIE, COLLIN COUNTY, TEXAS, \ T AREA VIRTUAL REFERENCE NETWORK(VRN). THE VRN IS MAINTAINED BYALLTERRA AND IS . L3 ACCESS EASEMENT FD 5/8"REBAR WITH ( ) THIS DAY OF 20 VOLUME 5877,PAGE 94, °4 -BASED ON TEXAS DEPARTMENT OF TRANSPORTATION REGIONAL REFERENCE POINTS(RRP). \ FIRE LANE,ACCESS YELLOW PLASTIC CAP 2.03' AND UTILITY D.R.C.C.T. _ FAMPEDRPL55587 " L23 EASEMENT L5 � 2. OWNERSHIP REFERENCES SHOWN HEREON ARE BASED ON COLLIN APPRAISAL DISTRICT WEB \ L11 - - - �.s� - -- - PAGE DATA (WWW.COLLINCAD.ORG). 1 L13 �� 32 "� 5.02' /C4 C5 ClC1 G0 WATER EASEMENT cn J CHRIS HOLSTED o CITY MANAGER, CITY OF WYLIE, TEXAS N� L25 C7 L31 M L27 3.ACCORDING TO THE FEDERAL EMERGENCY MANAGEMENT AGENCY'S FLOOD INSURANCE \ '� WATER EASEMENT -'L29 J RATE MAPS NUMBER 48085C0420J, EFFECTIVE DATE JUNE 2, 2009. THE SUBJECT PROPERTY L21 L26 (SEE LEGAL DESCRIPTION SHOWN HEREON)APPEARS TO LIE WITHIN: STATE OF TEXAS ) ZONE'X"(NOT SHADED ON PANEL)DEFINED THEREIN AS: ) COUNTY OF COLLIN ) \ °tom° w "OTHER AREAS. AREAS DETERMINED TO BE OUTSIDE THE 0.2%ANNUAL CHANCE FLOODPLAIN". BEFORE ME, THE UNDERSIGNED AUTHORITY, ON THIS DAY PERSONALLY APPEARED LOT 1, BLOCK D, o Q \ Z ' ALLEN NATIONAL THE ABOVE INFORMATION WAS DERIVED FROM FEMA'S WEB SITE. THE REFERENCED FLOOD KNOWN TO ME TO BE THE PERSON WHOSE NAME IS WOODLAKE VILLAGE M >- o a PROPERTY LLC INSURANCE RATE MAP WAS THE CURRENT MAP ACCORDING TO SAID WEB SITE DURING THE SUBSCRIBED TO THE FOREGOING INSTRUMENT,AND ACKNOWLEDGED TO ME THAT HE EXECUTED THE SAME FOR THE \ ADDITION I CfTY OF WYLIE M CC NO. RESEARCH PHASE OF THIS SURVEY.ADDITIONAL RESEARCH INTO LETTERS OF MAP REVISION, PURPOSES AND CONSIDERATIONS THEREIN STATED. VOLUME 2216, PAGE 990, = T 200804170C.C.T. 80, AMENDMENT, OR ANY OTHER INFORMATION ON SAID WEB SITE WAS NOT PERFORMED. WD.R.C.C.T co (� 2 a O.P.R.C.C.T. \ v D.{ .C.C,T, o o MARSHALL LANCASTER&ASSOCIATES,INC.MAKES NO REPRESENTATION AS TO THE _o gb 310,845 SQUARE FEET _ CV d U w / w w ACCURACY OR CURRENT STATUS OF SAID MAPS. GIVEN UNDER MY HAND AND SEAL OF OFFICE J J OR 7.136 ACRES J WW", Z ~ Qj \ > wM O` Q p CC Q ° 4. TITLE ENCUMBRANCE RESEARCH(SUCH AS EASEMENTS) SHOWN ON THIS SURVEY IS BASED -.1 z W ? THIS DAY OF , 20 FEMA ZONE "X" w ON INFORMATION CONTAINED IN A 75 YEAR EASEMENT SEARCH PREPARED BY PROVIDENCE N OO �; TITLE COMPANY, GF NO. 124002490, WITH AN EFFECTIVE DATE OF OCTOBER 17, 2018. \ Q>d I (NOT SHADED) w REFERENCE IS MADE TO RECORD DOCUMENTS LISTED THEREIN FOR FULL PARTICULARS. 2.3 A °ten WATER C (SEE NOTE NO. 3) _EASEMENTS AND OTHER TITLE ENCUMBRANCES, BOTH RECORDED AND UNRECORDED, MAY o¢ z EASEMENT z a 6 EXIST THAT ARE NOT CONTAINED WITHIN SAID RESEARCH(AND THEREFORE NOT SHOWN ON \ �' _° I o 0 THIS SURVEY). MARSHALL LANCASTER&ASSOCIATES,INC.MAKES NO REPRESENTATION AS NOTARY PUBLIC Z L16 ZONING CLASSIFICATION "CC/SUP" --1 w \ _ ,{,°• S i TO THE ACCURACY OR COMPLETENESS OF SAID TITLE ENCUMBRANCE RESEARCH. U ,. (SEE NOTE NO. 5) m L20 0 30'DRAINAGE& 5.ACCORDING TO THE ZONING MAP FROM THE CITY OF COLLIN PLANNING&DEVELOPMENT COUNTY, TEXAS \ J L18 UTILITY EASEMENT DEPARTMENT WEBSITE, ON JUNE 12, 2019, THE SUBJECT PROPERTY IS ZONED CC/SUP, DEFINED L38 VOLUME G,PAGE 385, ": AS COMMERCIAL CORRIDOR/SPECIAL USE PERMIT DISTRICT IN THE CITY OF WYLIE CODE OF \ 10.53' • '� L40 P.R.C.C.T. 2UNICI NORTH TEXASSURVEYOR'S CERTIFICATE C3 MUNICIPAL WATER ORDINANCES,ARTICLE 4, SECTION 4.1. SEE SAID CODE OF ORDINANCES FOR MORE N �-/ C6 C2 3• WATER EASEMENT -. ,,,F INFORMATION. r. L9 �9 L34 65 00' DISTRICT EASEMENT \ a o ° FIRE LANE,ACCESS L7 VOLUME 744,PAGE 751, D.R.C.C.T. ALLEN NATIONAL STATE OF TEXAS AND UTILITY / PROPERTY, LLC 6. SELLING A PORTION OF THIS ADDITION BY MEETS AND BOUNDS IS A VIOLATION OF THE CITY ) \ °- EASEMENT cn cn VOLUME 4205, ORDINANCE AND STATE LAW AND IS SUBJECT TO FINES AND WITHHOLDING OF UTILITIES AND ) L1 co PAGE 2089, BUILDING PERMITS. COUNTY OF TARRANT ) D.R.C.C.T. \ • ie-- KNOW ALL MEN BY THESE PRESENTS: N 00°53'14"E 776.00' 127.56' POINT OF RECOMMENDED FOR APPROVAL THAT I, MARSHALL LANCASTER, REGISTERED PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT \ BEGINNING ( THIS PLAT WAS PREPARED FROM AN ACTUAL AND ACCURATE SURVEY OF THE LAND AND THAT THE CORNER LOT 1, BLOCK A, FD 1/2"REBAR MONUMENTS SHOWN THEREON AS SET WERE PROPERLY PLACED UNDER MY PERSONAL SUPERVISION IN \ WOODLAKE VILLAGE \ VOLUME G, PAGE 385, ACCORDANCE WITH THE PLATTING RULES AND REGULATIONS OF THE CITY OF WYLIE, TEXAS. P.R.C.C.T. \ \ i,.._ CHAIRMAN, PLANNING AND ZONING COMMISSION DATE CITY OF WYLIE, TEXAS "PRELIMINARY, THIS DOCUMENT SHALL NOT FIRE LANE ACCESS AND FD1"PIPE BE RECORDED FOR ANY Pt�RPOSEAND LOT 1, BLOCK B, SHALL NOT BE USED OR VIEWED OR RELIED p if::::).,f LOT 2, BLOCK A, APPROVED FOR CONSTRUCTION .E.07ssWOODLAKE VILLAGE \ BOB HEATHUPON AS A FINAL SURVEY DOCUMENT �,�?••��STVOLUME G, PAGE 385, UTILITY EASEMENT TABLE WATER EASEMENT TABLE • ��\ ADDITION MARSHALL LANCASTER DATE *; ty * P.R.C.C.T. \ CC NO. REGISTERED PROFESSIONAL LAND SURVEYOR NO. 4873 20151214090004450, MARSHALL LR \ COURSE BEARING DISTANCE COURSE BEARING DISTANCE `* 1864 NORWOOD DRIVE, SUITE E\ COURSE BEARING DISTANCE COURSEBEARINGDISTANCE O.P.R.C.C.T HURST, TEXAS 76054 •,q 487L1 N 00°56'44"E 746.60' C1 R=28.00 L=43.95 L15 N 75°47'25"E 10.36' L28 N 89°10'30"W 8.76' Ca.M MAYOR, CITY OF WYLIE, TEXAS DATE �q•��Ffss TAN=27.9T CA=89°56'14" L 16 S 00°52'52"W 91.25' L29 N 00°49'30"E 10.00' FD'x'cur tiD•SU R y \ \ L2 S 89°02'52"E 339.72' - E L3 S00°51'25"W 746.21' L17 N89°12'10"W 25.00' L30 S89°10'30"E 8.76' CB=N 44°08'37"W CL=39.58' ACCEPTED L4 N 89°06'46"W 29.11' C2 R=28.00' L=43.98' L18 N 00°4T50"E 10.00' L31 N 00°49'30"E 19.48' o ( FINAL/, / PLAT T \ \ L5 N 00°49'30"E 251.89' L19 S 89°12'10"E 15.01' L32 S 00°49'30"W 186.88' °, �Y/�"1L L/�'1 TAN=28.00' CA=90°00'18" co L6 N 89°06'44"W 225.55' CB=S 45°53'07"W CL=39.60' L20 N 00°52'52"E 78.57' L33 N 89°10'30"W 15.00' Z LOT 1, BLOCK D \ L7 S 00°52'58"W 251.86' R=28.00' L=43.95' L21 N 00°4T29"E 295.35' L34 N 00°52'58"E 186.86' L8 N 89°06'46"W 29.32' C3 TAN=27.96' CA=89°55'49" L22 S 89°15'41"E 33.57' L35 S 00°52'S8"W 15.85' - ( WOODLAKE VILLAGE ADDITION L9 _ N 00°52'58"E 364.70' L23 S 00°49'30"W 10.00' L36 S 89°07'02"E 10.00' LOT 1, BLOCK A, FD 1/z"REBAR WITH BLUE •' G}' L 10 S 89°12'10"E 231.15' CB=N 45°50'24"E CL=39.57' - • • MAYOR, CITY OF WYLIE, TEXAS DATE • 1 L24 N 89°15'41"W 23.56' L37 S 00°52'58"W 10.00' BOB HEATH PLASTIC CAP STAMPED '' 60' \ L 11 S 00°43'39"W 78.14' R=28.00' L=43.95' ADDITION "GORRONDONA&ASSOC." C4 L25 .S 00°47'29"W. 284.99' L38 N 89°07'02"W 10.00' 7.136 ACRES OF LAND OUT OF THE L12 S 20°14'39"W 18.59' TAN=27.97' CA=89°55'49" L26 N 89°06'44"W 5.36' L39 S 00°52'58"W 185.81' CC NO. L13 S 00°49'30"W 269.44' CB=S 44°14'15"E CL=39.57' 20151214010004450, THE UNDERSIGNED, THE CITY SECRETARY OF THE CITY OF WYLIE, TEXAS, HEREBY CERTIFIES FRANCISCO DE LA PINA SURVEY, ABSTRACT NO. 688 \ \ L14 N 89°06'44"W 225.47' C5 R=28.00' L=44.01' L27 N 00°49'30"E 182.19' L40 N 89°06'46"W 15.00' O.P.R.C.C.T. THAT THE FOREGOING FINAL PLAT OF THE CITY OF WYLIE, COLLIN COUNTY, TEXAS TAN=28.03' CA=90°03'46" COURSE BEARING DISTANCE SUBDIVISION OR ADDITION TO THE CITY OF WYLIE WAS SUBMITTED TO THE CITY COUNCIL ON \ \ CB=S 45°51'23"W CL=39.62' C7 R=28.00' L=4.66' THE DAY OF 20 ,AND THE COUNCIL, BY FORMAL ACTION, THEN AND THERE ACCEPTED THE DEDICATIONS OF STREETS,ALLEYS, PARKS, EASEMENTS, PUBLIC R=28.00' L=43.98' TAN=2.33' CA=9°31'47" THIS PLAT FILED AS DOCUMENT ON DATE \ \ C6 FD 5/8"REBAR WITH RED PLACES,AND WATER AND SEWER LINES AS SHOWN AND SET FORTH IN AND UPON SAID PLAT TAN=28.00' CA=89°59'42" CB=S 86°07'22"W CL=4.65' PLASTIC CAP STAMPED CB=N 44°06'53"W CL=39.60' C8 R=28.00' L=30.46' "BOUNDARY SOLUTIONS"joe_FD TXDOT CAP AND SAID COUNCIL FURTHER AUTHORIZED THE MAYOR TO NOTE THE ACCEPTANCE THEREOF FD 1/2"REBAR�-� 127 61' BY SIGNING HIS NAME AS HEREINABOVE SUBSCRIBED. \ \ TAN= 16.94'=S 30°20'35"E CA=62°20'10" DATE:07/08/2019 JOB NO.: 18118B DRAWN BY:KF CHECKED BY: MLL CB CL=28.98' \ \ C9 R=28.00' L=30.46' WITNESS MY HAND THIS DAY OF ,A.D., 20 MARSHALL LANCASTER & ASSOCIATES INC. SURVEYOR OWNER TAN= 16.94' CA=62°20'90" CB=N 32°03'03"E CL=28.98' CONSULTING LAND SURVEYORS \ \ MARSHALL LANCASTER&ASSOCIATES, INC. CITY OF WYLIE I - commercial, retail and industrial construction surveying 1864 NORWOOD DRIVE, SUITE E, 300 COUNTRY CLUB RD., land title surveys ' topography •subdivision platting \ \ HURST, TX 76054 BUILDING 100 WYLIE, TX 75098 I CITY SECRETARY 1864 Norwood Drive, Suite E, Hurst, TX 76054 PHONE:817-268-8000 PHONE:972-516-6000 CITY OF WYLIE, TEXAS metro(817) 268-8000 fax(817) 282-2231 www.mla-survey.com firm no.10045100 \ \ CASE NO. SCALE: 1"= 60' SHEET NO. 1 OF 1 \ -I- of Wylie City Council AGENDA REPORT Meeting Date: August 13, 2019 Item Number: C Department: Planning (City Secretary's Use Only) Prepared By: Jasen Haskins Account Code: Date Prepared: August 5, 2019 Exhibits: 2 Subject Consider, and act upon, Ordinance No. 2019-18 a change of zoning from Neighborhood Services (NS) to Planned Development(PD-NS), to allow for a Wholesale Contractors Maintenance Yard use on 1.89 acres,located at 634 North Ballard. ZC 2019-09. Recommendation Motion to adopt Ordinance No. 2019-18 a change of zoning from Neighborhood Services(NS)to Planned Development (PD-NS), to allow for a Wholesale Contractors Maintenance Yard use on 1.89 acres, located at 634 North Ballard. ZC 2019-09. Discussion Owner: TDC2,LLC Applicant: Steve Purcell Zoning Case 2019-09 requires an Ordinance to amend the zoning accordingly in the Official Zoning map of the City; and providing a penalty clause, a repeal clause, a savings clause,a severability clause, and an effective date. The subject ordinance allows for the rezoning a 1.89-acre property located at 634 North Ballard Avenue from Neighborhood Services (NS) to Planned Development (PD-NS). Exhibit A (Legal Description) and Exhibit B (PD Conditions) are included and made a part of this Ordinance. The above described property shall be used only in the manner and for the purposes provided for in the Comprehensive Zoning Ordinance of the City, as amended herein by the granting of this zoning classification. Page 1 of 1. ORDINANCE NO. 2019-18 AN ORDINANCE OF THE CITY OF WYLIE, TEXAS, AMENDING THE COMPREHENSIVE ZONING ORDINANCE OF THE CITY OF WYLIE,AS HERETOFORE AMENDED, SO AS TO CHANGE THE ZONING ON THE HEREINAFTER DESCRIBED PROPERTY, ZONING CASE NUMBER 2019-09, FROM NEIGHBORHOOD SERVICES (NS) TO NEIGHBORHOOD SERVICES — PLANNED DEVELOPMENT COMMERCIAL CORRIDOR (NS-PD) TO ALLOW FOR A WHOLESALE CONTRACTORS MAINTENANCE YARD; PROVIDING FOR A PENALTY FOR THE VIOLATION OF THIS ORDINANCE; PROVIDING FOR THE REPEAL OF ALL ORDINANCES IN CONFLICT; PROVIDING A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS,the Planning and Zoning Commission and the governing body of the City of Wylie, Texas, in compliance with the laws of the State of Texas with reference to the amendment of the Comprehensive Zoning Ordinance, have given the requisite notices by publication and otherwise, and after holding due hearings and affording a full and fair hearing to all property owners generally and to owners of the affected property, the governing body of the City is of the opinion and finds that the Comprehensive Zoning Ordinance and Map should be amended; NOW,THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS: SECTION 1: That the Comprehensive Zoning Ordinance of the City of Wylie, Texas,be, and the same is hereby, amended by amending the Zoning Map of the City of Wylie, to give the hereinafter described property a new zoning classification of Commercial Corridor (CC), said property being described in Exhibit A (Legal Description) hereto and made a part hereof for all purposes. SECTION 2: That all ordinances of the City in conflict with the provisions of this ordinance be, and the same are hereby, repealed and all other ordinances of the City not in conflict with the provisions of this ordinance shall remain in full force and effect. SECTION 3: That the above described property shall be used only in the manner and for the purposes provided for in the Comprehensive Zoning Ordinance of the City, as amended herein by the granting of this zoning classification. SECTION 4: Any person, firm or corporation violating any of the provisions of this ordinance or the Comprehensive Zoning Ordinance, as amended hereby, commits an unlawful act and shall be subject to the general penalty provisions of Section 1.5 of the Zoning Ordinance, as the same now exists or is hereafter amended. Ordinance No. 2019-18 - Change the zoning on the hereinafter described property, Zoning Case Number 2019-09, from Neighborhood Services(NS)to Neighborhood Services—Planned Development Commercial Corridor(NS-PD) to allow for a wholesale contractors maintenance yard SECTION 5: Should any paragraph, sentence, subdivision, clause, phrase or section of this ordinance be adjudged or held to be unconstitutional, illegal or invalid, the same shall not affect the validity of this ordinance as a whole or any part or provision thereof, other than the part so declared to be invalid, illegal or unconstitutional, and shall not affect the validity of the Comprehensive Zoning Ordinance as a whole. SECTION 6: This ordinance shall be in full force and effect from and after its adoption by the City Council and publication of its caption as the law and the City Charter provide in such cases. SECTION 7: The repeal of any ordinance, or parts thereof, by the enactment of this Ordinance, shall not be construed as abandoning any action now pending under or by virtue of such ordinance; nor shall it have the effect of discontinuing, abating, modifying or altering any penalty accruing or to accrue, nor as effecting any rights of the municipality under any section or provisions of any ordinances at the time of passage of this ordinance. DULY PASSED AND APPROVED by the City Council of the City of Wylie, Texas, this 13th day of August, 2019. Eric Hogue, Mayor ATTEST: Stephanie Storm, City Secretary DATE OF PUBLICATION August 21,2019,in the Wylie News. Ordinance No. 2019-18 - Change the zoning on the hereinafter described property, Zoning Case Number 2019-09, from Neighborhood Services(NS)to Neighborhood Services—Planned Development Commercial Corridor(NS-PD) to allow for a wholesale contractors maintenance yard Exhibit 'A' ZC 2019-09 Address: 634 North Ballard Avenue Legal: PARKER SCHUERHOFF ADDITION (CWY), LOT 1 EXHIBIT "B" CONDITIONS FOR PLANNED DEVELOPMENT ZONING CASE No 11 . 2019-09 I. PURPOSE: The purpose of this Planned Development(PD) District is to allow for wholesale contractor's maintenance yard as an allowed use within the Neighborhood Services zoning district on the subject property. II. GENERAL CONDITIONS: 1. This Planned Development District shall not affect any regulations within the Zoning Ordinance or Code of Ordinances, current or as amended, except as specifically provided herein. 2. All regulations of the Neighborhood Services (NS) District set forth in Article 4, Section 4.3 of the Zoning Ordinance(adopted as of August 2017) are included by reference and shall apply herein. 3. The conditions of this Planned Development revert to the baseline Neighborhood Services Zoning development standards if the existing telecommunications engineering firm, known as TDC 2 LLC, ceases to own or occupy the subject property. III. SPECIAL CONDITIONS: 1. The Wholesale Contractor's Maintenance Yard use as defined in Section 5.1.2 of the August 2017 Comprehensive Zoning Ordinance shall be permitted by right on the subject property: a. as defined in Section 5.1.2 of the Zoning Ordinance 2. Screening of outside storage areas from adjacent residential properties and streets with a wooden fence and living screen shall be allowed in lieu of masonry screening. 3. Parking spaces shall be required at one space for every 500 sq. ft. of main building area for the Wholesale Contractor's Yard Use. Wylie City Council oF 1 AGENDA REPORT Meeting Date: August 13, 2019 Item Number: D Department: Public Works (City Secretary's Use Only) Prepared By: Tim Porter Account Code: Date Prepared: July 22, 2019 Exhibits: Ordinance, Draft Reports Subject Consider, and act upon, Ordinance No. 2019-19 setting a date for a public hearing on October 8, 2019 to discuss and review updates to the Land Use Assumptions and Capital Improvements Plan. Recommendation Approve Ordinance No. 2019-19 setting a date for a public hearing on October 8, 2019 to discuss and review updates to the Land Use Assumptions and Capital Improvements Plan. Discussion Chapter 395 of the Texas Local Government Code outlines the process for the adoption and update of Water, Wastewater and Thoroughfare Impact Fees. The Capital Improvements Advisory Committee met on July 16th and August 6th to discuss the Comprehensive Land Use Plan, Land Use Assumptions, 10-year Capital Improvements Plan, and draft Impact Fees (attached). Approval of this ordinance sets the date for the public hearing to discuss the Land Use Assumptions and Capital Improvements Plan. Page 1 of 1 ORDINANCE NO. 2019-19 AN ORDINANCE OF THE CITY OF WYLIE, TEXAS, SETTING A DATE, ORDERING A PUBLIC HEARING FOR OCTOBER 8, 2019 TO DISCUSS AND REVIEW UPDATES TO THE LAND USE ASSUMPTIONS,CAPITAL IMPROVEMENTS PLAN, AND WATER, WASTEWATER AND THOROUGHFARE IMPACT FEES; PROVIDING FOR REPEALING, SAVINGS AND SEVERABILITY CLAUSES; AND PROVIDING FOR AN EFFECTIVE DATE HEREOF. WHEREAS, the City Council of the City of Wylie,Texas ("City Council")has previously appointed the City's Planning and Zoning Commission plus an ad hoc member to serve as the Capital Improvements Advisory Committee in accordance with Chapter 395 of the Local Government Code; and WHEREAS,the City Council has previously adopted Land Use Assumptions by Ordinance No. 2012-18 and Ordinance No. 2014-35; and WHEREAS, the City Council desires to conduct a public hearing in regards to the Capital Improvements Plan and Water, Wastewater and Thoroughfare Impact Fees in accordance with Chapter 395 of the Local Government Code regarding the adoption of impact fees. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS: SECTION 1: Findings Incorporated. The findings set forth above are incorporated into the body of this Ordinance as if fully set forth herein. SECTION: 2: Call for Public Hearing. On the 8th day of October, 2019, at 6:00 pm in the City Council Chambers of Wylie City Hall, 300 Country Club Road, City of Wylie, Texas, the City Council will hold a public hearing giving all interested persons the right to appear and be heard on the Capital Improvements Plan and Water, Wastewater and Thoroughfare Impact Fees by the City of Wylie, Texas. Notwithstanding the foregoing,the above stated date for public hearing may be changed to any other date that is in accordance with law and for which notice is provided in accordance with law, if it is determined by the City Manager, or his designee, that good reason exists for changing said date. Ordinance No.2019-19 setting a date,ordering a public hearing for October 8,2019 to discuss and review updates to the Land Use Assumptions, Capital Improvements Plan,and Water,Wastewater and Thoroughfare Impact Fees SECTION 3: Notice of Hearing. The City Manager, or his designee, is hereby authorized and directed to cause notice of such hearing to be published in a newspaper in each county in which the City lies and send it by certified mail to anyone who has requested to receive it at least thirty (30) days before the date of such hearing, in accordance with Chapter 395 of the Texas Local Government Code and to be provided as otherwise required by law. SECTION 4: Savings/Repealing Clause: All provisions of any ordinance in conflict with this Ordinance are hereby repealed, but such repeal shall not abate any pending prosecution for violation of the repealed ordinance, nor shall the repeal prevent a prosecution from being commenced for any violation if occurring prior to the repeal of the ordinance. Any remaining portions of said ordinance shall remain in full force and effect. SECTION 5: Severability: Should any section, subsection, sentence, clause or phrase of this Ordinance be declared unconstitutional or invalid by a court of competent jurisdiction, it is expressly provided that any and all remaining portions of this Ordinance shall remain in full force and effect. Wylie hereby declares that it would have passed this Ordinance, and each section, subsection, clause or phrase thereof irrespective of the fact that any one or more sections, subsections, sentences, clauses and phrases be declared unconstitutional or invalid. SECTION 6: Effective Date: This Ordinance shall become effective immediately upon its adoption. DULY PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS on August 13, 2019. Eric Hogue, Mayor ATTESTED TO AND CORRECTLY RECORDED BY: Stephanie Storm, City Secretary DATE OF PUBLICATION August 21,2019,in the Wylie News. Ordinance No.2019-19 setting a date,ordering a public hearing for October 8,2019 to discuss and review updates to the Land Use Assumptions, Capital Improvements Plan,and Water,Wastewater and Thoroughfare Impact Fees III WATER AND WASTEWATER IMPACT FEE UPDATE IIII 2019 - 2029 Prepared For El iii iii . Eli ir' N, 0�KKa WY L I E III Prepared By BIRKHOFF, HENDRICKS & CARTER, L.L.P. PROFESSIONAL ENGINEERS 11910 GREENVILLE AVENUE, SUITE 600 DALLAS, TEXAS TEXAS FIRM 526 IIIIJune 2019 Birkhoff,Hendricks&Carter,L.L.P. CITY OF WYLIE 2018 WATER AND WASTEWATER IMPACT FEE UPDATE I. INTRODUCTION On April 24, 2001, the City of Wylie adopted Ordinance No. 2001-19 "Establishing Water and Wastewater Impact Fees" in accordance with Chapter 395 of the Local Government Code. The ordinance and associated impact fees were established and based on the Service Area Land Use Assumptions and Capital Improvements Plan prepared by Hunter Associates of Texas, Ltd., dated March 2001. The City updated their water and wastewater impact fees by Ordinance 2012-18 in response to the adoption of a new Comprehensive Land Use Plan in May 2012 and an expansion of the City's corporate boundaries and environmental jurisdiction. The maximum calculation fee and current imposed fees are summarized below: Fee Per Service Unit Calculated Fees Imposed Maximum (Ordinance 2011-11) Water $3651.42 $3651.42 Wastewater $773.48 $773.48 Chapter 395 requires that an update of the land use assumptions, capital improvements plan, and impact fees be performed every five years, unless it is determined by the political subdivision after a review that such an update is not necessary. In accordance with the requirements of Chapter 395.052 of the Local Government Code, this report reviews the City of Wylie's Land Use Assumptions and updates the Capital Improvement Plan. Chapter 395, of the Local Government Code is an act that provides guidelines for financing capital improvements required by new development in municipalities, counties, and certain other local governments. The basis for determination of an impact fee requires the preparation and adoption of a land use plan and growth assumption, and the preparation of a 10-year capital improvement plan. A master plan of the water and wastewater systems is j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -1 - Birkhoff,Hendricks&Carter,L.L.P. necessary to prepare a 10-year capital improvement plan. From these two phases, a maximum impact fee is calculated. The Act allows the maximum impact fee to be charged if revenues from future ad valorem taxes and water and sewer bills are included as a credit in the analysis. If not, the Act allows the maximum fee to be set at 50% of the calculated maximum fee. The following items were included in the impact fee calculation: A. The portion of the cost of the new infrastructure that is to be paid by the City, including engineering, property acquisition and construction cost. B. Existing excess capacity in lines and facilities that will serve future growth and which were paid for in whole or part by the City. C. Engineering and quality control fees for construction projects. D. Interest and other finance charges on bonds issued by the City to cover its portion of cost. The engineering analysis portion of the Water and Wastewater Impact Fee review determines utilized capacity cost of the major water distribution and wastewater collection facilities between the year 2019 and the year 2029. Facilities in this analysis include, water pump stations, elevated and ground water storage tanks, water transmission lines, wastewater treatment plants, wastewater lift stations and wastewater collection lines. The North Texas Municipal Water District (NTMWD) owned water treatment and distribution components were excluded from this analysis. The study period is a ten-year period with 2019 as the base year. The impact fee calculation for the water and wastewater systems is based on land uses provided by the City of Wylie. Concurrently with this Impact Fee Update, the City's Water Distribution Master Plan has been updated. The Master Plans are available for review from the City of Wylie. The equivalency factors utilized in this analysis conform to the latest American Water Works Association Standards (C700 - C703). j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-r apart.doc -2- Birkhoff,Hendricks&Carter,L.L.P. II. GLOSSARY 1. Advisory Committee means the capital improvements advisory committee established by the City for purposes of reviewing and making recommendations to the City Council on adoption and amendment of the City's impact fee program. The City Planning and Zoning Commission plus one business representative will serve this role. 2. Area-related facility means a capital improvement or facility expansion which is designated in the impact fee capital improvements plan and which is not a site-related facility. Area-related facility may include a capital improvement that is located off-site, or within or on the perimeter of the development site. 3. Assessment means the determination of the amount of the maximum impact fee per service unit that can be imposed on new development. 4. Capital improvement means either a water facility or a wastewater facility, with a life expectancy of three or more years, to be owned and operated by or on behalf of the City. 5. City means the City of Wylie, Texas. 6. Credit means the amount of the reduction of an impact fee due, determined under this ordinance or pursuant to administrative guidelines, which is equal to the value of area- related facilities provided by a property owner pursuant to the City's subdivision or zoning regulations or requirements, for the same type of facility. 7. Facility expansion means either a water facility expansion or a sewer facility expansion. 8. Final plat approval means the point at which the applicant has complied with all conditions of approval in accordance with the City's subdivision regulations, and the plat has been approved for filing with the County. 9. Impact fee means either a fee for water facilities or a fee for wastewater facilities, imposed on new development by the City pursuant to Chapter 395 of the Texas Local Government Code in order to generate revenue to fund or recoup the costs of capital improvements or facility expansion necessitated by and attributable to such new development. Impact fees do not include the dedication of rights-of-way or easements for such facilities, or the construction of such improvements, imposed pursuant to the City's zoning or subdivision regulations. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -3- Birkhoff,Hendricks&Carter,L.L.P. 10. Impact fee capital improvements plan means either a water capital improvements plan or a wastewater capital improvements plan, adopted or revised pursuant to the impact fee regulations. 11. Land use assumptions means the projections of population and growth, and associated changes in land uses, densities and intensities over at least a ten-year period, as adopted by the City and as may be amended from time to time, upon which the capital improvements plans are based. 12. Land use equivalency table means a table converting the demands for capital improvements generated by various land uses to numbers of service units, as may be amended from time to time. 13. New development means the subdivision of land; the construction, reconstruction, redevelopment, conversion, structural alteration, relocation, or enlargement of any structure; or any use or extension of the use of land; any of which increases the number of service units. 14. Plat has the meaning given the term in the City's subdivision regulations. Plat includes replat. 15. Platting has the meaning given the term in the City's subdivision regulations. Platting includes replatting. 16. Property owner has the meaning given the term in the City's subdivision regulations. Property owner includes the developer for a new development. 17. Recoupment means the imposition of an impact fee to reimburse the City for capital improvements that the City had previously oversized to serve new development. 18. Roadway means any freeway, expressway, principal or minor arterial or collector roadways designated in the City's adopted Thoroughfare Plan, as may be amended from time to time. Roadway does not include any roadway designated as a numbered highway on the official Federal or Texas highway system. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -4- Birkhoff,Hendricks&Carter,L.L.P. 19. Roadway capital improvements plan means the adopted plan, as may be amended from time to time, which identifies the roadway facilities or roadway expansions and their costs for each road service area, which are necessitated by and which are attributable to new development, for a period not to exceed 10 years. 20. Roadway expansion means the expansion of the capacity of an existing roadway in the City, but does not include the repair, maintenance, modernization, or expansion of an existing roadway to better serve existing development. 21. Roadway facility means an improvement or appurtenance to a roadway that includes, but is not limited to, rights-of-way, whether conveyed by deed or easement; intersection improvements; traffic signals; turn lanes; drainage facilities associated with the roadway; street lighting or curbs. 22. Service area means either a water service area or wastewater benefit area within the City, within which impact fees for capital improvements or facility expansion will be collected for new development occurring within such area, and within which fees so collected will be expended for those types of improvements or expansions identified in the type of capital improvements plan applicable to the service area. 23. Service unit means the applicable standard units of measure shown on the land use equivalency table in the Impact Fees Capital Improvements Plan that can be converted to water meter equivalents, for water or for wastewater facilities, which serves as the standardized measure of consumption, use or generation attributable to the new unit of development. 24. Site-related facility means an improvement or facility which is for the primary use or benefit of a new development, and/or which is for the primary purpose of safe and adequate provision of water or wastewater facilities to serve the new development, and which is not included in the impact fees capital improvements plan and for which the property owner is solely responsible under subdivision or other applicable development regulations. 25. Utility connection means installation of a water meter for connecting a new development to the City's water system, or connection to the City's wastewater system. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-r apart.doc -5- Birkhoff,Hendricks&Carter,L.L.P. 26. Wastewater facility means a wastewater interceptor or main, lift station or other facility included within and comprising an integral component of the City's collection system for wastewater. Wastewater facility includes land, easements or structure associated with such facilities. Wastewater facility excludes site-related facilities. 27. Wastewater facility expansion means the expansion of the capacity of any existing wastewater facility for the purpose of serving new development, but does not include the repair, maintenance, modernization, or expansion of an existing wastewater facility to serve existing development. 28. Wastewater capital improvements plan means the adopted plan, as may be amended from time to time, which identifies the wastewater facilities or wastewater expansions and their associated costs which are necessitated by and which are attributable to new development, for a period not to exceed 10 years. 29. Water facility means a water interceptor or main, pump station, storage tank or other facility included within and comprising an integral component of the City's water storage or distribution system. Water facility includes land, easements or structures associated with such facilities. Water facility excludes site-related facilities. 30. Water facility expansion means the expansion of the capacity of any existing water facility for the purpose of serving new development, but does not include the repair, maintenance, modernization, or expansion of an existing water improvement to serve existing development. 31. Water improvements plan means the adopted plan, as may be amended from time to time, which identifies the water facilities or water expansions and their associated costs which are necessitated by and which are attributable to new development, for a period not to exceed 10 years. 32. Water meter means a device for measuring the flow of water to a development, whether for domestic or for irrigation purposes. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-r apart.doc -6- Birkhoff,Hendricks&Carter,L.L.P. III. LAND USE ASSUMPTIONS (Provided By: The City Of Wylie) A. Purpose Chapter 395 of the Texas Local Government Code prescribes the process by which cities in Texas must formulate development impact fees. The initial step in this process is the establishment of"land use assumptions" for the City upon which the impact fee program is based. An executive decision has been made to use the 2005 Future Land Use Plan instead of the 2012 Future Land Use Plan due to the land use categories used in the 2012 Future Land Use Plan being too broad for a hydraulic analysis. These land use assumptions, which are derived from the 2005 Future Land Use Map and from the 2018 Population Projections provided by City Staff, will become the basis for the preparation of impact fee capital improvement plans for water and wastewater facilities. To assist the City of Wylie in determining the need for, and the timing of, capital improvements to serve future development, a reasonable estimation of future growth is required. The growth and development projections were formulated by the City of Wylie based upon assumptions pertaining to the type, location, quantity and timing of various future land uses within the community, and to establish and document the methodology used for preparing the growth and land use assumptions. B. Elements of The Land Use Assumption Report This report contains the following components: 1) Methodology -- Explanation of the general methodology used to prepare the land use assumptions. 2) Service Zone Map — The impact fee service area for water and wastewater facilities is shown on Figure 1. 3) Base Data — Information on population and land use for Wylie for each capital facility/impact fee service area. 4) Ten-Year Growth Assumptions — Population and land use growth assumptions for ten years for each capital facility/impact fee service area. 5) Ultimate Population Projections —Projections that reflect a completely developed condition, based upon the City's ultimate "build-out" scenario. 6) Summary—Brief synopsis of the land use assumptions report. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -7- Birkhoff,Hendricks&Carter,L.L.P. C. Methodology Based upon the growth assumptions and the capital improvements that will be needed to support future growth, it is possible to develop an impact fee structure which fairly allocates capital improvement costs to growth areas in relationship to their impact upon the entire infrastructure system. The database and projections in this report have been formulated using reasonable and generally accepted planning principles and methodologies. These land use assumptions and future growth projections take into consideration several factors influencing development patterns, including the following: 1) The character, type, density and quantity of existing development 2) Existing land use patterns 3) Anticipated future land uses (as shown in the City's 2005 Future Land Use Plan) 4) Availability of land for future expansion, and the City's physical holding capacity 5) Current growth trends in the City and region 6) Location and configuration of undeveloped(vacant) land 7) Known or anticipated development projects 8) Potential sanitary sewer availability(e.g., topographical constraints) 9) Growth policies adopted in the Future Land Use Plan A summary of the general methodology used for the preparation of this report follows: 1) Establish impact fee water and wastewater service areas (Part III D — Service Area Map). 2) Collect/determine benchmark (i.e., base year) data on population and land use as of January 2018 (Part III E—Base Year Data). 3) Project population and land use growth for ten years by impact fee service areas (Part III F—Ten-Year Growth Assumptions). 4) Project the ultimate population for a fully developed City, assuming full development of service area(s) (Part III G—Ultimate Population Projections). A more detailed methodology for each is contained within the referenced sections. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -8- Birkhoff,Hendricks&Carter,L.L.P. D. Service Area Maps Figure 1 on the following page shows the proposed service area for water and wastewater facilities. The service area boundary for wastewater includes all land area within the existing City limits, all land within the Wylie Water CCN, and those portions of shared Water CCNs that Wylie will provide wastewater facilities as development occurs. The service area boundary for water includes all land within the Wylie Water CCN, and those portions of shared CCNs that Wylie will serve as development occurs. However, portions of the existing and proposed development within the City limits obtain water from alternative suppliers, namely the Wylie Northeast Water Supply Corporation District and the Eastfork Special Utility District. This background information provides insight to the discrepancy between the overall City population and the population within the water service area (discussed later in the report). A recommended priority listing of projects for water and wastewater facilities will be outlined in the City's Capital Improvements Program (CIP). The actual ten-year CIP upon which the impact fee program must be based has been prepared,per the requirements of Chapter 395. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -9- LEGEND WYLIE CITY LIMITS WASTEWATER > 04 / , *A. maim SERLAIN (APPROXIMATE) " EA WATER SERVICE AREA CCN r ', to ,,,,''' , ,, kr , ... ° �,,X "' 'I y 730 SERVICE P►REA_ ✓ ✓ ; u ,<<sc MoMI ROAD .., ....._ _..,w.� _ �� "' ie. / yy O ' p /"m' /�,r' F„+°P ,,✓..,,.�., .';ALL " 1et a» .' m ,/ir ✓' i "� / D.A. T. �C i 1 S.H.78 .rrrr .r+1 — "r° " /'h „ 0 T` ros ,'/ a fir'r' Ra 0. r �r s. /' '� F ..... .� r� ✓, 3,€.r`r.i ....._„.,A' F.M. 3412 :� '�0 6� a-t',�.�..._we... d "" "� " g - , € " p T... 7 �4. y W.BROMIN ST. iC,�O3 r...�.s " ; " P. 1 679h.SERVICE AREA a " k $ � " ? ..m, „_a. n.M_ �' " F.IM....b44 s a P.M. 544 r.�t / " f / -,-. - 1._ , 4* ,01._ ,, ,7" //,, 4 ✓ , , m PLANTS DR. ,,,`, 1 /T✓,E rjA, / i ..._,,,,,,,,, ..4r. ,►� ,...n , , sr VI / ' ....444=, / '4:'111:/ '!'''; ' 4, //,;7/7//////,"."/ .F.,, i 9,04.', .4 / ,„ , ,, „4,71,,,, . ,,, 4, ✓ ,, 1 r / 4. N SCALE: 1"=4000' WATER&WASTEWATER t ;` /T ' FIGURE 1 SERVICE AREA MAP BIRKHOFF.HENDRICCS de CARTER.L.LP. .. �; ;j PROFESSIONAL ENGINEERS " r .. 0 / 10 Birkhoff,Hendricks&Carter,L.L.P. E. Base Year Data This section documents historical growth trends and base data for the City. This "benchmark" information provides a starting basis of data, as established in the City's Future Land Use Plan and updated in April 2005, and the City's Comprehensive Land Use Plan, adopted in 2012 for the ten-year growth assumptions. One method of predicting future growth is looking at past growth. The historical growth rates for Wylie are shown in Table 1 below. Table 1 HISTORICAL GROWTH RATE City of Wylie, Texas Compounded Year City of Wylie % Change Average Annual /o Change per Period 1970 (1) 2,675 0.00% 0.00% 1980 (1) 3,152 17.83% 1.65% 1990 (1) 8,716 176.52% 10.71% 2000 (1) 14,965 71.70% 5.55% 2010 (1) 41,427 176.83% 10.72% 2018 (2) 52,003 25.53% 2.88% (') Source: U.S. Census. (2) Source: Current Population Estimate, Provided by City Staff. Over the 40-year period of 1970 to 2010, the City of Wylie experienced a significant amount of growth. The City is continuing to experience an increase in population, housing, and commercial development activity, although the rapid growth experienced through the early 2000's began tapering down in 2006-2007 due to a variety of economic factors. As of 2018,. the City of Wylie is projected to have a total of around 600 residential lots to be constructed. The build-out of these lots will increase the existing housing stock as follows: 17,128 existing units (2018) + 600 future units (2019) = 17,728 units or a 3.5% increase. Accordingly, it is anticipated that the City has the lot inventory to maintain the increases in population and housing growth experienced over the last few years. It is also anticipated that the City will continue to receive petitions for the zoning and platting of new subdivisions. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact tee Areports\03-report.doc - 1 1 - Birkhoff,Hendricks&Carter,L.L.P. Another comparison and useful base data source for population growth is the past trends in residential construction. Table 2 shows the growth trend in residential construction in the City from 2013 to 2018. At the end of 2013 there were approximately 15,024 residential units; this is the base number for percentage of growth. Table 2 RESIDENTIAL BUILDING PERMITS PER YEAR City of Wylie, Texas Year Prior Total Residential Units New Residential Units % Growth 2013 15,024 (1) 250 1.7% 2014 15,274 (1) 298 2.0% 2015 15,572 (1) 542 3.5% 2016 16,114 (1) 447 2.8% 2017 16,561 O 567 3.4% 2018 17,128 (1) 600 3.5% Average: 451 new residential units per year over 6 years l>> City of Wylie 2018 Population Projections The growth in housing shown in Table 2 illustrates the recent trend in residential activity for the City of Wylie. The trend shown here reflects that observed for the recent trend in population growth. The City has seen moderate gains in residential growth over the past few years. As mentioned earlier, the City's available lot inventory is increasing. For the purposes of documenting changes in population, land use, density and intensity, the data format to be used as a basis to formulate the land use assumptions will be principally population and land use estimates. These estimates and the land use inventory, from the City's 2005 Future Land Use Map, were used to establish a beginning baseline and updated to June 2018 for the population projections provided by the City. 1) Population and Land Use Existing land uses were documented throughout each of the service areas in development of the Land Use Plan. Residential and non-residential building activity for each of the service areas was then analyzed to establish base population for 2018. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact tee Areports\03-report.doc - 12- Birkhoff,Hendricks&Carter,L.L.P. The estimated population in 2018 for both service areas is: Water Wastewater • Population 43,147 52,003 • Dwelling Units 14,479 17,451 • Households 13,842 16,683 These residential calculations are based on the following assumptions: • Occupancy Rate 95.6 percent (2010 U.S. Census for Wylie); and • Average Household Size 2.98 persons/household (2010 U.S. Census). 2) Land Use Prior to an evaluation and projection of future land use patterns, an understanding of existing conditions is essential. Documentation of existing land use patterns within the City and its ETJ was included as part of the Land Use Plan prepared by others. This data was updated based on information provided by the City to reflect residential and non-resident development activity that occurred through 2018. This documentation provides an overview of the general present physical composition and condition of the City. Table 3 shows a summary of estimated existing land uses for the land area within the water and sanitary sewer service zones. TABLE 3A Existing Land Use For The Water Service Zones—2018 City of Wylie, Texas Acres Used Percent of Land Use (Developed) Developed Area Low Density Residential 379 5.20% Medium Density Residential 2,864 39.30% High Density Residential 306 4.20% Commercial/Retail/Office 309 4.24% Commercial Corridor 399 5.47% School, Public/Semi-Public, Services 295 4.05% Neighborhood Services 55 0.75% Downtown Historic District 34 0.47% Utilities/Heavy Industrial 375 5.15% Light Industrial 459 6.30% Parks & Open Space 320 4.39% Agricultural 1,493 20.49% Total Area: 7,288 100.00% j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact tee Areports\03-report.doc - 13- Birkhoff,Hendricks&Carter,L.L.P. TABLE 3B Existing Land Use For The Sanitary Sewer Service Zones—2018 City of Wylie, Texas Acres Used Percent of Land Use (Developed) Developed Area Low Density Residential 2,210 17.73% Medium Density Residential 4,556 36.54% High Density Residential 385 3.09% Commercial /Retail/Office 658 5.28% Commercial Corridor 399 3.20% School, Public/Semi-Public, Services 518 4.15% Neighborhood Services 55 0.44% Downtown Historic District 34 0.27% Utilities/Heavy Industrial 641 5.14% Light Industrial 678 5.44% Parks & Open Space 525 4.21% Agricultural 1,808 14.50% Total Area: 12,467 100.00% Table 4 shows a summary of estimated existing land uses in acres per 100 persons. TABLE 4A Existing Land Use Per 100 Persons For The Water Service Zones—2018 City of Wylie, Texas Acres Per Land Use Category 100 Persons Low Density Residential 0.88 Medium Density Residential 6.64 High Density Residential 0.71 Commercial/Retail/Office 0.72 Commercial Corridor 0.92 School, Public/Semi-Public, Services 0.68 Neighborhood Services 0.13 Downtown Historic District 0.08 Utilities/Heavy Industrial 0.87 Light Industrial 1.06 Parks & Open Space 0.74 Agricultural 3.76 Total Area: 16.89 Based upon 2018 water service area population of 43,147 persons. j:Aclerical wylie1201 8-1 1 8 w&ww-thoroughfare-impact teeAcip&impact teed eports\03-report.doe - 14- Birkhoff,Hendricks&Carter,L.L.P. TABLE 4B Existing Land Use Per 100 Persons For The Sanitary Sewer Service Zones—2018. City of Wylie, Texas Land Use Category Acres Per 100 Persons Low Density Residential 5.24 Medium Density Residential 10.80 High Density Residential 0.91 Commercial/Retail/Office 1.56 Commercial Corridor 0.95 School, Public/Semi-Public, Services 1.23 Neighborhood Services 0.13 Downtown Historic District 0.08 Utilities/Heavy Industrial 1.52 Light Industrial 1.61 Parks & Open Space 1.24 Agricultural 4.28 Total Area: 29.55 Based upon 2018 sewer service area population of 42,196 persons. F. Ten-Year Growth Assumptions Growth is characterized in two forms: population (residential land use) and non- residential land use. Several assumptions were necessary in order to arrive at reasonable growth rates for population and employment in the City of Wylie. The following assumptions were made as a basis from which 10-year projections are initiated: 1) Future land uses will occur as shown on the Future Land Use Plan. 2) The City will be able to finance the necessary improvements to the water and wastewater systems to accommodate expected growth. 3) School facilities will accommodate expected increases in school-age population. 4) Densities will be as projected,based upon anticipated zoning districts. 5) Known or anticipated development projects will occur as presently planned. The 10-year projections, or land use assumptions, are based upon the establishment of a reasonable growth rate based upon past trends and/or other considerations. Considering the increasing trends in population and housing growth (Table 2) and the City's proximity to the Dallas/Fort Worth metropolitan area and combining these factors with anticipated development projects provides a reasonable indication of growth potential. Based upon these assumptions, the annual average number of residential dwelling units constructed j:Acler cal\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc - 15- Birkhoff,Hendricks&Carter,L.L.P. per year over the next 10-year period is projected to be approximately 234. A household size of 2.98 persons per household with an occupancy rate of 95.6 percent was used to calculate the future population based on the projected residential activity. The 2018 population of 52,003 (source: City of Wylie) is projected to increase to approximately 58,667 by the year 2028, representing a compounded annual growth rate of 1.2%. This rate would generate an average population increase of about 667 persons per year. The following shows the formula for calculating the ten-year growth assumptions: Residential: 234 dwelling units x 0.956 occupancy rate = 224 occupied dwelling units/year 224 occupied dwelling units/year x 2.98 household size= 667 persons/year(+/-) 667 persons/year x 10 years= 6,670 persons net 10-year residential growth "Note: It should be noted that the 10 year population and housing projection assumes growth potential within the existing municipal boundaries and the existing extraterritorial jurisdiction (ETJ). These projections do not assume residential growth beyond the existing ETJ." This rate of growth (1.2% compound annual growth rate) is a conservative reasonable rate for Wylie to be expected to grow at over the next 10 years. The growth rate projected for Wylie is less than the compounded annual growth rate over the last 8 years (2.88%) and is consistent with other comparable cities within the region. Table 5 shows the average annual compounded growth rates for other cities in the area and for Collin County from 2010 to 2018:. TABLE 5 Populations and Growth Rates of Area Cities and Collin County—2010. to 2018 Compounded Average City/Jurisdiction 2010 2018 Annual Population Population Change (2010-2018) Wylie 41,427 52,003 2.88% Allen 84,253 96,870 1.76% Frisco 116,989 172,940 5.01% McKinney 131,117 179,970 4.04% Murphy 17,708 20,010 1.54% Plano 259,841 281,390 1.00% Prosper 9,423 22,650 11.59% Collin County 782,341 969,730 2.72% Source: U.S. Census, 2010 and 2018 Population Estimates, North Central Texas Council of Governments (2018). j:Acler ca➢wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact tee Areports\03-report.doc - 16- Birkhoff,Hendricks&Carter,L.L.P. Table 5 illustrates that the regional growth pattern is continuing to move outward from Dallas toward the City of Wylie. Those cities that experienced the greatest amount of growth from the 1980s to the 1990s have achieved significant levels of build-out and those cities further north have begun to experience significant population and housing increases. Those cities north and west of Wylie are currently experiencing growth rates similar to those projected for Wylie through 2028. The projected annual growth rate for the City of Wylie and the resulting population projection of 58,667 persons (48,694 persons within Wylie's Water CCN) for the 10-year planning horizon is considered reasonable for planning purposes. As mentioned, this growth is projected throughout the City's water and wastewater service area, with a substantial amount of the growth being beyond the current municipal boundaries during the next ten years. The previously described growth rate represents growth throughout the water and wastewater service zones. It is anticipated that most of this projected growth will ultimately be incorporated into the City service area limits for several reasons: 1) More stringent environmental laws pertaining to septic waste systems. 2) Increasing insurance rates outside corporate City limits. 3) The City's progressive philosophy regarding water and sewer line extensions. 4) Proposed upgrading of construction standards in the City's ETJ. Changes in population affect the use of land. In the case of Wylie, increased population is due to the conversion of vacant or agricultural land into residential and other land uses. Non-residential development will increase to provide the goods and services that the increased population will demand. The estimation of the additional acres to be developed for the next 10 years will aid in the determination of demand for additional water and wastewater facilities. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc - 17- Birkhoff,Hendricks&Carter,L.L.P. Table 6 shows the additional. Retail/Office, Commercial, and industrial land uses required for the increase in population projected through 2028 (6,670 people). TABLE 6 TEN-YEAR LAND USE PROJECTIONS -- 2028 For The Water Service Zones—2028 City of Wylie, Texas Future Acres Acres Required For Land Use Per 100 Persons 6,670 Persons Commercial/Retail/Office 1.80 120 School, Public/Semi-Public, Services 0.67 45 Utilities, Heavy and Light Industrial 2.50 167 Parks & Open Space 1.03 69 Total Acres: 6.00 401 Source: City of Wylie, April 2005. The future acres per 100 persons reflect those ratios that have been observed for Texas cities with healthy local economies. It should be noted that these ratios also closely reflect the existing land use mix for Wylie's water and wastewater service areas. The ratios are used to calculate the amount of non-residential development that the local population may support. G. Ultimate Population Projection An ultimate, or holding capacity, land use and population projection was also established in the City of Wylie's Future Land Use Plan. First, known densities of development were considered. Then, based upon the remaining developable vacant land in Wylie and its ETJ, densities of anticipated development projects were applied. The ultimate population of the City of Wylie is a function of anticipated residential land use area (acres), housing density (dwelling units per acre), and population density (persons per dwelling unit). Based upon the land uses identified on the Future Land Use Plan, the total ultimate land use areas of residential development were calculated using the density standards adopted as part of the Future Land Use Plan. The ultimate holding capacity for the planning area, assuming that each residential area is built out to its maximum capacity, generates a maximum population of approximately 50,589 persons for the water service area and 60,950 persons for the sewer service area, excluding the unincorporated lake areas. j:Acler cal\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc - 18- Birkhoff,Hendricks&Carter,L.L.P. H. Summary The data used to compile these land use assumptions were from three sources, anticipated development for the City of Wylie, residential building data and other data from the City, and information from the Future Land Use Plan. The ten-year growth projections were calculated based upon reasonable growth rates and trends for Wylie and the surrounding area. Ultimate projections were based upon the holding capacity of vacant land using land use types and applying densities as established by development policies, the Future Land Use Plan, and known proposed development plans. The land use assumptions may be summarized as follows: 1) The Wylie wastewater planning area contains approximately 19.75 square miles. 2) The 2018 estimated population in the existing water service area is 43,147. The 2018 estimated population in the existing wastewater service area is 52,003. 3) The ten-year growth projections were calculated using a compounded average annual growth rate of approximately 1.2%. 4) The ten-year population projection for Wylie is approximately 48,694 persons inside the water service area and 58,667 in the sanitary sewer service area. As noted, the population within the water service area excludes those residents obtaining water from providers other than the City of Wylie and the population within the sanitary sewer service area excludes a small percentage not connected to the wastewater system. 5) The ultimate (build-out) population within the water service area is approximately 50,589 persons and 60,950 persons in the wastewater service area, according to the 2018 population projections. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc - 19- Birkhoff,Hendricks&Carter, L.L.P. IV. DEFINITION OF A SERVICE UNIT — WATER AND WASTEWATER Chapter 395 of the Local Government Code requires that impact fees be based on a defined service unit. A "service unit" is a standardized measure of consumption, use generation, or discharge attributable to an individual unit of development calculated in accordance with generally accepted engineering or planning standards. This update defines a water and wastewater service unit to be a 3/4-inch water meter and has referred to this service unit as a Single Family Living Unit Equivalent (SFLUE). The SFLUE is based on the continuous duty capacity of a 3/4-inch water meter. This is the typical meter used for a single-family detached dwelling, and therefore is considered to be equivalent to one "living unit". Many single-family dwellings were constructed with 5/8-inch meters in the City; therefore, 5/8-inch meters are also considered one "living unit". Other meter sizes can be compared to the 3/4-inch meter through a ratio of water flows as published by the American Water Works Association as shown in Table 7 below. This same ratio is then used to determine the proportional water and wastewater impact fee amount for each water meter size. TABLE 7 Living Unit Equivalencies For Various Types and Sizes of Water Meters Continuous Duty Meter Type Meter Size Maximum Rate (gpm) (a) Ratio to 3/4" Meter Simple 5/8" & 3/4" 15 1.0 Simple 1" 25 1.7 Simple 11/2" 50 3.3 Simple 2" 80 5.3 Compound 2" 80 5.3 Turbine 2" 100 6.7 Compound 3" 160 10.7 Turbine 3,, 240 16.0 Compound 4" 250 16.7 Turbine 4" 420 28.0 Compound 6" 500 33.3 Turbine 6" 920 61.3 Compound 8" 800 53.3 Turbine 8" 1,600 106.7 Compound 10" 2,300 153.3 Turbine 10" 2,500 166.7 Turbine 12" 3,300 220.0 (a) Source: AWWA Standard C700(1995)- C703 (1996) klelicaL wyhe N2018-118 w&ww-thoroughfare-impact teekip&impact tee\lepotts\03-tepott doc -20- Birkhoff,Hendricks&Carter,L.L.P. V. CALCULATION OF WATER& WASTEWATER-LIVING UNIT EQUIVALENTS The City of Wylie provided the existing water meter count by size category as of June 2018. In total, there are 13,048 water meters serving the existing population of 43,147 residents and businesses. Table 8 shows the number of existing meters, the living unit equivalent factor and the total number of living unit equivalents for water accounts. The City reports there are 16,341 accounts in 2019, this represents an approximate annual increase of 2.91% and is similar to the growth rate for the water system. Table 9 illustrates the existing accounts and SFLUE's based on the same percentage of growth as shown in the water system. Using the growth rate provided by the 2018 Population Projections prepared by the City, a straight-line extrapolation of water meters and wastewater accounts were calculated for the year 2028. Living unit equivalents were then applied to the water meters and wastewater accounts for 2018 and 2028 resulting in a total number of living units. The difference in the total number of 2018 and 2028 living units results in the new living unit equivalents during the impact fee period. The calculation of living unit equivalents is summarized in Table 8 and Table 9. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -21 - Birkhoff, Hendricks&Carter, L.L.P. TABLE 8 Water Living Unit Equivalents 2019 - 2029 2019 2029 New Living Unit Total Living Unit Total SFLUE's Meter Size Number Equivalent Number Number Equivalent Number During of Water of Water Impact Fee Ratio for 1" of Living Ratio for 1" of Living P Meters Used Units Meters Used Units Period 5/8"&3/4" 12,510 1.0 12,510 14,118 1.0 14,118 1,608 1" 214 1.7 363 242 1.7 410 47 1-1/2" 19 3.3 62 21 3.3 70 8 2" 274 6.7 1,835 309 6.7 2,071 236 3" 8 16.0 128 9 16.0 144 16 4" 12 28.0 336 14 28.0 379 43 6" 9 61.3 551 10 61.3 622 71 8" 2 106.7 213 2 106.7 240 27 Totals 13,048 15,998 14,725 18,054 2,056 TABLE 9 Wastewater Living Unit Equivalents 2019 - 2029 2019 2029 Number Number New of Water Living Unit Total of Water Living Unit Total SFLUE's Meters Equivalent Number Meters Equivalent Number During w/Sewer Ratio for 1" of Living w/Sewer Ratio for 1" of Living Impact Fee Meter Size Accounts Used Units Accounts Used Units Period 5/8"&3/4" 15,803 1.0 15,803 17,834 1.0 15,780 2,031 1" 214 1.7 363 242 1.7 411 48 1-1/2" 19 3.3 62 21 3.3 69 7 2" 274 6.7 1,835 309 6.7 2,070 235 3" 8 16.0 128 9 16.0 144 16 4" 12 28.0 336 14 28.0 392 56 6" 9 61.3 551 10 61.3 613 62 8" 2 106.7 213 2 106.7 213 0 Totals 14,532 17,482 16,387 19,692 2,455 j:Aclerical\wylie\2018-I I w&ww-lhoroughlare-impact leeAcip&impact tee A reports V03-report.doc -22- Birkhoff,Hendricks&Carter,L.L.P. VI. WATER DISTRIBUTION SYSTEM Birkhoff, Hendricks & Carter, L.L.P. Professional Engineers prepared computer models for the years 2018 and 2028. The models were developed from the 2018. Population Projections provided by the City of Wylie. The land areas follow closely to the construction of major facilities in the system as outlined in Figure 2. These facilities include major distribution lines, pump stations, ground storage reservoirs and elevated storage tanks. All computer models were run for the Maximum Hourly Demand and the Minimum Hourly Demand to insure proper sizing of the facilities to meet peak demand periods. A. Existing Pump Stations, Ground Storage Reservoirs & Elevated Storage Tanks Table 10 outlines a summary of the City's existing water facilities. TABLE 10 Water Distribution System--Existing Pump Stations & Ground Storage Total Number of Total Number Rated Ground Ground Storage of Capacity Storage Available Pump Station Pumps (MGD) Tanks (Gallons) Nortex 5 9.20 2 2,500,000 East Brown 5 10.64 1 1,500,000 Newport Harbor 4 11.73 1 2,000,000 Total: 4 6,000,000 Elevated Storage Tanks Capacity in Gallons Creekside Elevated Storage Tank 2,000,000 South Ballard Elevated Storage Tank 250,000 Regency(Decker) Elevated Storage Tank 750,000 Total 3,000,000 The pump stations and ground storage facilities were analyzed with the maximum daily demand, while elevated storage act dynamically and are therefore analyzed utilizing the difference between the Maximum.Hourly Demand and the Maximum Daily Demand. B. Distribution Lines The distribution lines consist of all lines within the service area boundary supplying water to customers in the City of Wylie. Lines vary in size from 5/8-inch and 3/4-inch services to j:Acler cal\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact tee Areports\03-report.doc -23- Birkhoff,Hendricks&Carter,L.L.P. 24-inch transmission lines. Only those water lines 12-inches and larger in diameter were considered in the Impact Fee calculations. The cost of water lines includes the approximate construction cost, appurtenances (water valves, fire hydrants, taps and the like), utility relocations, purchase of easements, and engineering costs in 2018. Financing cost over a 20-year term with an assumed bond rate of 5%is included for each project. Unit cost for proposed capital improvement water lines 12-inches and larger in diameter were classified as City initiated water lines including the full cost of the facility. Developer initiated water line projects, 12-inches or less in diameter, are not included in this Impact Fee analysis, as the cost for these size lines are the responsibility of the developer. C. Water Supply The City of Wylie currently receives all of its water supply from the North Texas Municipal Water District (NTMWD). Wylie's allocation of the capital cost of services as a customer of the NTMWD was specifically excluded from the impact fee analysis. If included, Wylie's share of the NTMWD capital cost could include the original construction cost, expansion cost, financing cost, engineering cost and real estate cost of the following components: 1) Water Rights Cost in Lake Lewisville and Other Reservoirs 2) Raw Water Intake Structures 3) Raw Water Pump Stations 4) Water Treatment Plant and Expansions 5) High Service Pump Stations 6) Transmission Lines 7) NTMWD Owned Ground Storage Facilities 8) Metering Facilities j:Acler cal\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -24- Birkhoff,Hendricks&Carter,L.L.P. D. Water Distribution System Capital Improvement Projects In order to meet the demands of the anticipated growth over the next 10-years, as provided in the 2018 Population Projections, certain water distribution system improvements are required. Figure 2 shows the recommended system improvements and Table 11 itemizes each project and the project cost. These recommended improvements assist to fortis the basis for the Water System Impact Fee Calculation. Actual capital cost, including construction, engineering and easements of the various elements of the existing water distribution system was utilized where the information was known. The existing cost of facilities was determined from records provided by the City of Wylie. Where actual costs are not known, an average cost in 2018 dollars has been calculated. The average unit cost is from a limited survey of projects, which bid recently, plus an estimated cost for engineering and easements. There are many variable factors that can have a significant impact on the actual construction cost of a project such as local conditions, material cost increases and fuel cost increases to name a few. The capital improvement plan provides for system improvements within the defined service area. Some of the system improvements may be physically located beyond the boundaries of the services area; however, they are necessary to provide adequate system service and capacity. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -25- EXISTING NEWPORT HARBOR PUMP STATION • GSR#1 (EWF-1) r I • PUMP STATION CREEKSIDE 2.0 MG * PROPOSED GSR#2 ELEVATED STORAGE TANK (EWF-9) (PWF-2) ,.. , , EL6 fie' S:srTMq x 1 � d �w �t � t2 , EL24, y fr't ,r,„,,, ,,',,,,,„,„4 r'll;v 2.1 t 1° EL316" bt _.w ."" .. L11 I. 70 a 1 ' ) .. , pi P r WYLIE Est o"lt�_ ( 1 3 1 , fir''' ,� -� tim � �I _' t° 4 i 1 p �, LEGEND c 1 ,."'' _ ) L4 -• WYLIE CITY LIMITS 1� i I: s .za ��� .... � , .I. ... _.,.... ig.,__i � °3 °, �„`1- �'2 � � 12".... � WYLIE CCN BOUNDARY 1 TEL8,,, " 1 ..., :._ f �� I a as 12 28" 12" ) € �," , „,,. o EL9 �.�r �: SERVICE AREA BOUNDARY L [ 12" • ------- --------EXISTING WATERLINE-NO IMPACT FEE 4 .. r - .„ ` , ry t 24"� BROWN sr. ,< Ili p 24 �em EXISTING WATERLINE IMPACT FEE � `�� �' fat.....�� � } EXISTINGt2" (PIPE NO.) ( "" 24 EAST BROWN STREET ( PROPOSED WATERLINE IMPACT FEE PUMP STATION t2 a � . . (PIPE NO.) x, & `" � EXISTING N • PUMP STATION EWF-6) ORTEX PUMP STATION ) • GSR#1 (EWF-7) ,x EXISTING JUNCTION NODE or .e • PUMP STATION(EWF-3) ,., " • NTMWD METER VAULT(EWF-8) • GSR#1 (EWF-4) ?" c` ' (IIP EXISTING a, • GSR#2(EWF-5) #) STONE .-m." �n�=� ) (PROJECT NO.) STORAGE TANK ,, f 1 L1 12 EL5 iffl ( PROPOSED SOUTH BALLARD EXISTING ELEVATED STORAGE TANK rt .. .a., �" 1,5 MSG TANK ELEVATED STORAGE _.. '4 ( E s TO BE ABANDONED j TANK(PWF-1) xxroSmTrw ,asr wwx 'e I , , „.t,,. 1 ,.,,.n t .:O PROPOSED ELEVATED STORAGE TANK r E L 1 :AIAN .: . , • L5 24 (PROJECT NO.) 12"od v r" e v 12 18 AtAr. R. 1 • "")� II EXISTING PUMP STATION (PROJECT NO.) " 14 4 w SCALE: 1"=3500' 1 I 1 WATER DISTRIBUTION SYSTEM ' " CAPITAL IMPROVEMENT PLAN AND RECOVERY MAP BIRKHOFF,HENDRICKS&CARTER,L.L.P. la a/ �}� r PROFFSSIONA[,FNGINFFRS Texas firm I'526 11910 Greenville Ave.,Suite 600 Dallas,Texas 75243 (214)361-7900 May,2019 FIGURE 2 26- Birkhoff,Hendricks&Carter,L.L.P. TABLE 11 CITY OF WYLIE TEXAS 2018-2028 WATER& WASTEWATER IMPACT FEE 10-YEAR CAPITAL IMPROVEMENT PLAN PROPOSED Water System(Capital Improvement Plan) Total 10-Year Utilized j Project Capital ServiceDebt Total Pr)ect Cost(�s o Capacity ID Project Cost tr) Cost($) PROPOSED FACILITIES PWF-1 South Ballard 1.5 MG EST $4,715,000 $2,851,876 $7,566,876 $7,566,876 PWF-2 Newport Harbor 1.0 MG GSR $2,300,000 $1,391,159 $3,691,159 $3,395,866 SUBTOTAL: $7,015,000 $4,243,035 $11,258,035 $10,962,742 PROPOSED WATER DISTRIBUTION LINES LI Southwest 12-Inch Connector[679 Service Area] $488,000 $295,168 $783,168 $783,168 L2 State Highway 78 Distribution Line No.2[679 Service Area] $573,400 $346,822 $920,222 $920,222 L3 Cotton Belt Avenue Water Line[679 Service Area] $133,000 $80,446 $213,446 $210,092 L4 State Highway 78&Spring Creek Parkway Loop[679 Service Area] $976,000 $590,336 $1,566,336 $1,566,336 L5 24-Inch Distribution Line from Ballard Elevated Tank $60,000 $36,291 $96,291 $96,291 SUBTOTAL: $2,230,400 $1,349,063 $3,579,463 $3,576,109 WATER SYSTEM PLANNING EXPENSES Water System Master Plan $37,700 $0 $37,700 $37,700 Water&Wastewater Systems Impact Fee Review $31,300 $0 $31,300 $31,300 SUBTOTAL: $69,000 $0 $69,000 $69,000 PROPOSED WATER SYSTEM TOTAL: $9,314,400 $5,592,098 $14,906,498 $14,607,851 j:Aclencal\wylie12018-118 w&ww-thoroughfare-impact feeNcip&impact fee1reports\03-report.doc -27- Birkhoff,Hendricks&Carter,L.L.P. Utilized Capacity Utilized capacity for the water distribution system was calculated based on the water line size required for each model year (2018, 2028 and build out). Master planning of the water distribution system is based on the maximum daily demand, maximum hourly demand, and the minimum hourly demand. Pump station capacity is generally based on the maximum daily system demand while transmission and distribution facilities are sized based on either the maximum hourly demand or the minimum hourly demand, whichever demand is greater for a particular water line. Often, the capacity of a water line is determined by the flows generated by the minimum hourly demand. The minimum hourly flows are usually higher in those lines that are used to refill elevated storage. For each line segment in the water distribution model, the build-out flow rate in the line was compared to the flow rate in the same line segment for the 2018 and the 2028 models. The percentage of utilized capacity was calculated for each year based on the build-out capacity. The utilized capacity during the Impact Fee period is the difference between the year 2028 capacity and the year 2018 capacity. Table 12 below summarizes the total 20- year project cost and utilized cost over the impact fee period of 2018 - 2028 for each element of the Water Distribution System. The total 20-year cost includes financing cost over a 20-year term with an assumed bond rate of 5%. The utilized capacity for each water distribution facility, both existing and proposed, is presented in detail in Impact Fee Capacity Calculation Tables 13, 14, and 15. TABLE 12 Summary of Eligible Capital Cost and Utilized Capacity Cost Utilized Total 20-Year Water System Facility Capacity($) in the Project Cost CRP Period Existing Water Lines $9,579,634 $980,204 Existing Water Facilities $23,805,756 $2,069,874 Proposed Water Facilities $11,258,035 $10,962,742 Proposed Water Lines $3,579,463 $3,576,109 Planning Expenses $69,000 $69,000 Total $48,291,888 $17,657,929 j:Aclerical\wylie12018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -28- Dioldwff,f I ertdrydu Caner,I.1..P. 58,20 I'9 TABLE 13 CITY OF WYLIE, TEXAS 2018-2028 WATER DISTRIBUTION IMPACT FEE STUDY EXISTING WATER FACILITIES 1 CosLl Capacity Utilioed(Vs) Capacity Utilized(3) - , Debt Service Total Interest 20 Year Debt In The In The Year Engineering& Project Rate Service Utilizing Total 20 Yr, CRF CRF Project No. System Improvements Collat.___Capacity Coast, Testing Cast % Simple Interest Project Cost 3 2018 2028 Period 2018 2028 Period smimaimsi.---- Newport Harbor Pump Station ._ . EWF-I Ground Storage Reservoir No,I I 2010 2.0 MG $1,868,862 $70,200 $1,939,062 5. % 31,172,845 $3,111,907 79% 92% 13% $2,458,407 $2,862,954 $404,547 EWE-2 Pump Station 2 2018 11.7 MCI) $809,953 $86,950 0896,903 5 0% $542,493 $1,439,396 79% 92% 13% $1,137,123 $1,324,244 $187,121 - Subtotal Newport Harbor Pump StatMod 52,678,815 =MEM $2,835,965 IIIIMIIIIIEFE=MIEMEM 33,595,530 34,187,198 $591,668 18510rIes Pump Sint-ion E,WE-3 Pump Station 3 2007 9.2 MGD $1,130,939 395,000 $1,225.939 5.0% $741,511 $1,967,450 94% 100% 6% 51,849,403 $1,967,450 $118,047 EWF-4 Ground Storage Reservoir No.I 4 2010 1.5 MG 31,801,142 $70,200 $1,871,342 5_0% $1,131,884 53,003.226 94% 100% 6% $2,823,032 $3,003.226 $180,194 EWF-5 Ground Storage Reservoir No,2 5 2018 1,0 MG.. $2,007,247 $127,950 32,135,197 5.011/n $1,291,478 $3,426,675 94% 100% 6% $3,271,075 $3,426,675 $205,600 ,..............---. Subtotal Nodes Pump Station:.I $4,939,328 3293,150 35,232,473 63,164,873 $8,397,351 $7,893,510 I 38,397,351 I 3503,841 I East Brown Street Pump Station EWF-6 Pump Station 6 2014 10.7 MGD $1,855,140 ' $162,872 52,018,01.2 5.0% $1,220,399 $3238,610 94% 100./n 61,. 01044,293 $3,238,610 3194,317 EWE-7 Ground Storage Reservoir No I 7 2014 1,5 MG $1,411,000 3123,879 $1,534,879 5.0% I $928,374 $2,463,253 94% 100% 6% $2,315,458 $2,463,253 $147,795 EWE-8 NTMWD Meter Vault 8 2014 NA $310375 $27,249 $337,624 5,0% 1 $204,212 1 $54 1,836 94% 100% 6% $509,326 $541 836 $32 510 I1_ Subtotal East Brown Street Pump Station:[ $3,576,515 $314,000 33,890,515 ' 32,353,184 , 36,243,699 35,869,077 I_ 36,243,699 I 3374,622 I I Existing Elevated Storage . EWF-9 Creeksidc EST 9 2009 2.0 j $2,728,660 $146,000 ' $2,874,660 5.0% $1,738,743 64,613 403 F 79% I 928ii I 13% $1644,588 1 $4,244,331 I $599,743 Subtotal Existin Elevated Store e: S2,728,660 $146,000 52,874,60 1111111132KEEM S4,613,403 II 53,644,588 1 $4,244,331 I S599,743 I TOTAL EXISTING WATER PA ILITIES: S13,923,318 $910,300 $14,833,618 $8,972,138 $23,805,756 II$21,002,705[$23,072,579 I $2,069,874 1 .-Based on Cost Provided by the City and 2012 Impact Fee Study CITY OF WYLIE, TEXAS 2018-2028 WATER DISTRIBUTION IMPACT FEE STUDY PROPOSED WATER FACILITIES I----- -- - „ _ Cost($) Capacity Utilized( -%) Capacity Utilized(SLI Engineering, Debt Testing and Total Service 20 Year Debt in The In The Projected Projected Property Project Interest Service Utilizing Total 20 Yr, CRF CRF Proiceit No. S steno Im rovemenfir Year Capacity Const, Acquisition Cost Rote% Simple Interest Project Cost S 2018 2028 Period 2018 7023 Period Proposed Facilities PWF-I (I)South Ballard 1 5 MG EST Il'WF-2 (1)Newport Harbor 1.0 MG GSR 25 25 2020 1,5 MG $4,100,000 2025 1.0 MG $2,000,000 $615,000 $300,000 $4,715,000 5,0% $2,851,876 57,566,876 $3,691,1_59 TOTAL PROPOSED WATER FACILITIES: $6,160,000 $915,000 $$72,0'31T00)0 5 r°''''''' I $$ 4 I,243'39I',01 5;5 $I 1,258,035 o% in% 0% _ _ 9% _ 197%% ' :0° $7,566,876 $7,566,876 $3,395.866 53,395,866 , .4111.. 610,962,742 $10,962,742 (I)Estimated Cast 11[4(AICA,1,..29,11-1.W.Weqb......,,mcnc,lee1CIP 6 4,ml ree.1,c,,,,,,,,,e 2018.4-rer flIp.E.,ee.....Cern,,alie.141P F. -29- Hirkhoif,.Hendricks Carter,L.L.P. 5r8 2019 TABLE 14 CITY OF WYLIE, TEXAS 2018-2028 WATER SYSTEM IMPACT FEE STUDY EXISTING-WATER LINES Debt . (%) Utilized Capacity (S) Utilized Capacity Avg.Unit Service 20 Year Debt Total 20 Year During_ Pipe Length. Diameter. Date or Cost Total Capital Intersest Service Utilizing Project Fee During Number IFL) (Inches) Const. (S/FL) Cost ($) Rate% Simple Interest Cost ($) 2018 2028 Period 2018 _ 2028 Fee Period (EL1)- East Alanis Drive Distribution Line [679 Service Areal This project will connect the existing 20"waterline along South Ballard Avenue to the existing 1.2"waterline along Alanis Drive west of Martinez Lane (2) P-387 2,090 12 $55,70 $116,423 $70,419 $186,842 82% 100°/n 18% $153,211 $1.86,842 $33,631 (2) P-388 . 420 12 $55.70 $23,396 $14,151 $37,547 97% 100% 3% $36,421 $37,547 $1,126 (2) P-222 350 12 $55.70 $19,497 $11,793 $31,290 95% 100% 5% $29,725 $31,290 S1,565 (2) P-381 840 12 $55.70 $46,792 $28,302 $75,094 89% 99% 10% $66,834 $74,343 $7,509 (2) P-221 510 12 $55,70 $28,410 $17,184 $45,594 89% 99% 10% $40,578 $45,138 $4,560 Subtotal: 4,210 2005 $234,518 5.0% $141,849 $376,367 $326,769 $375,160 $48,391 (EL2)- Creekside(Riverchase)Distribution Line [730 Service Area] I This project connects the existing I6"waterline east of the Creekside Estates Subdivision to the existing 12"waterline at Creekside Estates Drive (1) P-352 2,430 20 $43,94 $106,786 $64,590 $171,376 77% 89% 12%© $131,960 $152,525 $20,565 (1) P-199 1,670 20 $43.94 $73,388 $44,389 $117,777 80% 92% 12% _ $94,222 $108,355 $14,133 (1) P-375 2,260 20 $43.94 $99,316 $60,071 $159,387 98% 99% 1% $156,199 $157,793 $1,594 ; Subtotal: 6,360 2006 $279,490 5.0% $169,050 $448,540 $382,381 $418,673 $36,292 (EL3)- McCreary Road Water Distribution Line [730 Service Area] Thisproject connects the exjsti 12"waterline at the Southfork Mobile Home to the existing 12"waterline in Creekside Estates Phase 4. (2) P-218 1,940 16 $100.95 $195,847 $118,458 $314,305 79% 92% 13% $248,301 $289,161 $40,860 (2) P-371 3,120 16 $100.63 $313,962 $189,900 $503,862 79% 92% 13% $398,051 5463,553 $65,502 (2) P-223 340 16 $75.71 $25,743 $15,571 $41,314 86% 95% 9% S35,530 S39,248 $3,718 (2) P-335 2,490 20 $125,68 $312,952 $189,290 $502,242 86% 94% 8% $431,928 $472,107 $40,179 Subtotal: 7,890 2007 $848,504 5.0% $513,219 S1,361,723 $1,113,810 $1,264,069 $150,259 (EL4)- F.M. 1378 Distribution Line(South) [730 Service Area] This•eo'ect connects the existin:12"waterline alon_-F.M.1378 at Brown Street to the existin-12"waterline in Lakefield Drive. P-360III 840 $72.57 $60,960 $36,872 $97,832 100% 100° 0° $97,832 $97,832 SO P-153 1,830 $72,57 $132,806 $80,328 $213,134 99°�° 100°f° 1°'0 $211,003 $213,134 $2,131 Subtotal: 2,670 2009 $193,766 5.0%o I $117,200 $310,966 $308,835 $310,966 $2,131. (ELS)- South Ballard Distribution Line [679 Service Area] This project connects the existing 12"&8"waterlines at the intersection of Birmingham&South Ballard to the existing 12"waterline at Alanis Drive. (2) P-382 630 16 $201.46 $126,919 S76,767 $203,686 t 100% 100% 0% $203,686 $203,686 $0 (2) P-369 700 16 $201.46 $141,021 $85,297 $226,318 100% 100% 0% $226,318 $226,318 $0 (2) P-383 610 16 $201,46 $122,890 S74,330 $197,220 93% 100% 7% $183,415 $197,220 S13,805 (2) P-384 570 16 $201.46 - $114,832 S69,456 $184,288 65% 100% 35% $119,787 $184,288 S64,501 Subtotal: 2,510 2009 $505,662 5,0% $305,850 $811,512 S733,206 S811,512 $78,306 I;\CLERIC4r\Wylle\2018--11B W&W W-lhoroughtarslmpact Fee\LAP&Impact Fee\Repofts\Wylie 201E Wal'er Impact Fee.nls,W_L4nes_q -30 19irkholj Hendricks Carter,].L.P. 5/8,2019 TABLE 1.4 CITY OF WYLIE, TEXAS 2018-2028 WATER SYSTEM IMPACT FEE STUDY EXISTING-WATER LINES Debt % Utilized Cat auk (5) Utilized Capaci Avg.Unit Service 20 Year Debt Total 20 Year During Pipe Length Diameter Date of Cost Total Capital lnitersest .Service Utilizing Project Fee During Number (Ft.) (Inches) Const,[ S/Et.- Cost $ Rate% Sim F le Interest Cost S 2018 2028 Period 2018 2028 Fee Period (EL6)- Spinnaker Way Water Line [730 Service Area] This project connects the existing 18"waterline at Anchor Drive to the existing 12"waterline at Coral Reef Lane, (2) P-372 750 12 SI77.31 $132,983 $80,435 $213,418 95% 100% 5% $202,747 $213,418 S10,671 Subtotal: 750 2009 $132,983 5.0% $80,435'', $213,418 $202,747'. $213,41$ $10,671 (EL7)- F.M. 1378 Distribution Line(North) [730 Service Area] This project connects the existing 12"waterline at Anchor Drive to the existing 12"waterline alon8,F,M, 1378 at McMillen Road, (2) P-399 700 20 $166.34 $116,438 $70,428 $186,866 100% 100% 0% $186,866 $186,866 $0 (2) P-386 490 18 $149,70 $73,353 $44,368 $117,721 74% 92% 18% ' $87,114 S108,303 $21,189 (2) P-025 1,020 18 $149,70 $152,694 $92,357 $245,051 76% 92% 16% $186,239 $225,447 $39,208 (2), P-024 980 18 $149.70 S146,706 $88,735 S235,441 69% 89% 20% $162,454 $209,542 $47,088 (2). P-403 1,600 18 $149.70 $239,520 $144,874 $384,394 78% 94% 16% $299,827 $361,330 $61,503 (2) P-155 2,320 16 $133,07 $308,722 $186,731 $495,453 88% 999/0 11% $435,999 S490,498 $54,499 (2) P-154 2,170 12 $99.80 $216,566 $130,990 S347,556. 87% 99% 12% $302,374 $344,080 S41,706 Subtotal: 9,280 2010 $1,254,000 5.0% $758,483 S2,012,482' $1,660,873 $1,926,066 S265,193 (EL8)- West Brown Distribution Line [679 Service Area] 'Thisproject connects the existing 12"waterline at FM 1378 and connects the existing 12"waterline at Sanden&Ann Drive to the existing 12"waterline at Westgate Way, (2) P-391 1,050 12 $75.13 S78,887. S47,715 $126,602' 0% 100% 100% SO $126,602 S126,602 (2) P-396 300 12 $75,13 $22,539' $13,633 S36,172 100% 100% 0% $36,172 $36,172 $0 (2) P-407 1,040 12 $75,13 $78,136 $47,261 $125,397 89% 100% 11% $111,603 $125,397 $13,794 (2) P-151 1,930 12 $75.13 $145,003 $87,705 $232,708 0% 100% 100% $0 $232,708 $232,708 (2) P-404 1,280 12 $75.13 $96,168 S58,167 $154,335 100% 100% 0% $154,335 $154,335 $0 Subtotal: 5,600 2012 $420,733 5.0% $254,481 $675,214 $302,110 $675,214 $373,104 (EL9)- East Brown Distribution Line [679 Service Area] This project connects the existing 12"waterline at SH 78 to the existing 12"waterline in Eubanks Way. (2) P-430 920 24 $219.56 $201,995 $122,177 $324,172 I00% 100% 0% $324,172 $324,172 $0 (2) P-012 2,550 24 $219,56 $559,877 $338,643' $898,520 100% 100% 0% $898,520 $898,520 $0 (2) P-365 320 24 $219.56 $70,259 $42,496 $112,755 100% 100% 0% $112,755 $112,755 $0 Subtotal: 3,790 2012 $832,131 5.0% $503,316 S1,335,447 S1,335,447 $1,335,447 $0 (EL10) - State Highway 78 Distribution Line No. 1. [679 Service Area] This project connects the existing waterline near Birmingham Avenue to the existing)2"waterline in East Brown Street, (2) P-374 920 20 $245,92 $2-26,249 $136,847 $363,096 100% 100% 0% S363,096 $363,096 $0 (2) P-376 1,650 20 $245,92 $405,773 $245,433 $651,206 t0O% 100% 0% $651,206 $651,206 $0 (2) P-379 460 12 $245,92 $113,125 $68,424 $181,549 100% 100% 0% $181,549 $181,549 $0 (2) P-402 1,320 24 $245.92 $324,619 $196,346 $520,965 100% ' 100% 0% $520,965 $520,965 $0 Subtotal: 4,350 2012. S1,069,766 5,0% $647,050 S1,716,816 S1,716,816 $1,716,816 $0 1:\CLERICAL\Wylie\1010-110 W&WW'Thoroughrare-frnpacI FeeiCln&Impact Fee\Reports\Wylie 2010 Water Impact Fee.ds,W Li"ee R -31- Blrkhaff Hendricks Carter,L.L.P. 5/X.2019 TABLE 14 CITY OF WYLIE, TEXAS 2018-2028 WATER SYSTEM IMPACT FEE STUDY EXISTING -WATER LINES Debt (%) Utilized Capacity $ Utilized Capacity Avg.Unit Service 20 Year,Debt Total 20 Year During Pipe Length Diameter Date of Cost Total Capital Intersest Service Utilizing Project Fee During Number (Ft.) (Inches) Cowl. ($/Ft.) Cost ($) Rate®/ Simple Interest Cost (5) 2018 2028 Period 2018 2028 Fee Period (EL11)- Spinnaker Way 12-Inch Water Line [730 Service Areal This project connects the existing 8"waterline at Windward Lane to the existing 8"waterline at Coral Reef Lane. (2) P-406 450 12 $439.15 $197,619 $119,530 $317,149 95% 100% 5% $301,292 $317,149 $15,857 Subtotal: 450 2012 $197,619 5.0% $119,530 $317,149 $301,292 $317,149 $15,857 TOTAL EXISTING WATER LINES: I 47,860 I S5,969,172 $3,610,463 $9,579,634 $8,384,286 $9,364,490 $980,204 1 -City Participte in Cost Oversize 2-City initiated and Funded *-Based on Cost Provided by the City and 2012 Impact Fee Study l:\CLERICHL\Wylie\2919-]1R W&W W-Thoroughfare-Ampaer Fee\CIF,&Impact Fee\Repo,L,\Wylie NIB Water Impart ree.xls,W_LIces ji -32 TABLE 15 Birkhoff,Hendricks Carter,L.L.F. 5/8./2019 CITY OF WYLIE, TEXAS 2018-2028 WATER SYSTEM IMPACT FEE STUDY PROPOSED CIP-WATER LINES Average Unit costs are based in 2018 dollars unless otherwise Indicated and includes 2©%fir engineering and easements. l (%) Utilized Capacity ($) Utilized Capacity - Debt Avg.Unit Service 20 Year Debt Total 20 Year Pipe Length Diameter Cost Total Capital Interest Service Utilizing Project During During Number (Ft.) (Inches) , ($/Ft.) Cost ($) Rate% Simple Interest Cost ($) 2018 2028 Fee Period 2018 _ 2028 Fee Period (L1)- Southwest 12-Inch Connector [679 Service Area] This project connects the 12"waterline on McCrea Road to the 12"waterline on 5 ringwell Parkway , (2) P-310 4,000 12 $122,00 $488,000 $295,168 $783,168 0% 100%. 100%1 $0 $783,168 $783,168 Subtotal: 4,000 $488,0005.0% $295,168 $783,168 ,, $fl $783,168 $783,168 (L2)- State Highway 78 Dist bution Line No.2 [679 Service Area] This project connects the existing l2"waterline in East Brown Street to the existin 12"waterline in Eubanks Lane, (2) P-377 1,700 12 $122.00 $207,400 $125,446 $332,846 0%1 100% 100% $0 $332,846 $332,846 (2) P-378 3,000 12 $122.00 $366,000 $221,376, $587,376 0% 100e/© 1.00% $0 $587,376 $587,376 Subtotal: 4,700 $573,400 5.0% $346,822 $920,222 S0 $920,222 $920,222 (L3)- Cotton Belt Avenue Water Line 1679 Service Area] This project replaces an existing 4"and 1"waterline along Cotton Belt Avenue. (2) P-393 600 8 $95.00 $57,000, $34,477 $91,477 0% 99% 99% $0 $90,562 $90,562 (2) P-397 800 8 $95.00 $76,000 S45,969 $121,969 0%© 98% 98% $0 $119,530 $119,530 Subtotal: 1,400 $133,000 5.0% $80,446 $213,446 SO $210,092 $210,092 (L4)- State Highway 78 & Spring Creek Parkway Loop [679 Service Area] This project at an existing 12"waterline on Spring Creek Parkway and extends east.Then extends south to State Hix_hway 78.Then extends along Stale Highway 78 to connect°to an existing waterline on Spring Creek Parkway (2) P-347 3,200 12 $122.00 $390,400 $236,134 $626,534 0% 100% 100% $0 $626,534 $626,534 (2) P-348 1,400 12 $122.00 $170,800 $103,309 $274,109 0% 100%• 100% $0 $274,109 $274,109 (2) P-349 3,400 12 $122.00 $414,800 $250,893 $665,693 0% 100% 100% $0 $665,693 $665,693 Subtotal: 8,000 $976,000 5.0% $590,336 $1,566,336 $0 $1,566,336 $1,566,336 (L5)- 24-Inch Distribution Line from Ballard Elevated Tank This project connects the proposed Ballard 1.5 MG elevated storage tank to an existing 16-inch water line on Ballard.Ave, (2) P-060 200 24 $300 00 $60,000 $36,291 $96,291 0% 100% 100% $0 $96,291 $96,291 Subtotal: 200 S60,000 5.0% $36,291 S96,291 $0 $96,291 $96,29I TOTAL PROPOSED WATER LINES: 18,300 $ 2,230,400 S 1,349,063 $ 3,579,463 $ - $ 3,576,109 S 3,576,109 (1)-City Participate in Cost Oversize (2)-City Initiated and Funded B-Bore Across State Highway or Interstate P-Parallel Water Line *-Based on Actual Bid Price R-Replacement 1,\CLERICALSW0e\7018-118 W&WW.fhorougl,tare-Impact Fee\CIP&impact Fee\Reports\Welie 2016 Wafer Impact Fee,elseW Lines CIP -33- Birkhoff,Hendricks&Carter,L.L.P. VIL WASTEWATER COLLECTION SYSTEM A. General At this time, most of the wastewater generated in the City of Wylie (concentrating in areas adjacent to the present city center) flows by gravity and a combination of lift stations and force mains to the Muddy Creek Regional Wastewater Treatment Plant (operated by the NTMWD) southwest of the City center. The Wylie Wastewater Treatment Plant located near the center of the City was decommissioned. A small amount of current wastewater flow is handled through local residential septic systems. The average daily flow capacity of the new Muddy Creek Regional Wastewater Treatment Plant is 10.0 MGD and the peak flow capacity is 30.0 MGD. This impact fee study considers no significant development in the Lake Ray Hubbard Collection Basins prior to 2029. Therefore, infrastructure improvements are not planned or included in the impact fee calculation. Muddy Creek, Cottonwood Creek and Rush Creek Basins are anticipated growth areas. 1) Muddy Creek: Muddy Creek includes the bulk of the existing development and produces the predominant volume of wastewater flow. The Muddy Creek Basin will add approximately 3,895 to the population by 2029. 2) Cottonwood Creek: Generally south of the City center is an expected growth area where approximately 919 will be added to the population by 2029. 3) Rush Creek: Generally east of the City center is an expected growth area where approximately 1,234 will be added to the population by 2029. B. Collection Lines The wastewater collection system analysis is a static analysis covering all of the drainage basins within the study area. The wastewater project cost includes necessary appurtenances, purchase of easements, utility relocation, pavement removal and replacement, and engineering costs. For existing Impact Fee projects, actual costs were utilized where known. Future project cost estimates were based on budget information provided by the NTMWD and include engineering, construction and inspection costs when provided. The natural ground in the area to be served by the Wylie Wastewater Collection System varies in elevation from approximately 460 feet above mean sea level near the Muddy j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -34- Birkhoff,Hendricks&Carter,L.L.P. Creek Regional. Wastewater Treatment Plant to 620 feet above mean sea level near the northwest City Limit. There is a natural divide running generally North to South near the Wylie city center(following Ballard Avenue to the Pleasant Valley Road). The land on the west side of this divide generally falls to the southwest and includes five main basins. These basins are (from south to north) Lower Muddy Creek, Tributary 1 to Muddy Creek, Tributary 2 to Muddy Creek, Tributary 3 to Muddy Creek and Upper Muddy Creek. The natural creeks, whose basins will collect wastewater through the installed system of trunk lines, flow into the geographic area normally serviced by the North Texas Municipal Water District. The fall of the land on the east side of this divide is to the southeast and includes three main basins. The basins are Cottonwood Creek (near the City center), Rush Creek (east of the City center) and Tributary 1 to Rush Creek (east of the main channel). These basins flow naturally into Lake Ray Hubbard. Flows in the City of Wylie service areas are collected in Lift Stations at the downstream limit of the service area and lifted over to the Muddy Creek basin. C. Treatment The Wylie Wastewater Treatment Plant is located just north of Alanis Drive and west of Ballard Avenue. Currently, this plant no longer serves the City and was decommissioned. The Muddy Creek Regional Wastewater Treatment Plant was constructed southwest of the City center near Lake Ray Hubbard. An expansion of the Muddy Creek Regional Wastewater Treatment Plant was completed several years ago and additional expansions are anticipated over the next five years. The North Texas Municipal Water District operates the Muddy Creek Regional Wastewater Treatment Plant. D. Capital Improvement Program The existing wastewater collection system is adequately designed to accommodate the growth expected within the impact fee period; therefore, no improvements are required based on the current projections. However, the current NTMWD wastewater treatment plant is reaching capacity and the NTMWD plans to expand the capacity to accommodate future growth. Due to this circumstance, there only new improvement shown in Table 15 is the City's percentage of the flow contribution times the cost of the expansion and the portion predicted to be used for new development over the 10-year CIP period. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -35- Birkhoff,Hendricks&Carter,L.L.P. E. Utilized Capacity The Land Use Assumptions from the City of Wylie were utilized to calculate the utilized capacity for the wastewater collection system based on land absorption from population growth projections. The population and employment growth in each wastewater drainage basin were deteuuined based on the City's growth projections. These growth rates were utilized to calculate 2018 and 2028 design flows. The following summarizes each design flow component utilized to calculate the wastewater design flows. 1) Population Based Flow: For the purpose of this wastewater impact fee study an average per capita flow of 110 gallons per day (gpcd) is a reasonable basis for the design of the wastewater collection and treatment facilities. Peak flows associated with this per capita rate have been estimated for various segments of the collection system by using the following formula PF = ((5/(population/1000)^0.167). The formula takes into account the estimated population, and, indirectly, the area of the drainage basin to be served. This method gives a ratio of peak to average flows varying from a maximum of 5.0 times the average flow for a population of 1,000 or less to 2.32 times the average flow for a population of 93,700 (includes 18,000 for the City of Murphy also served at the Muddy Creek Regional WWTP). 2) Non-Population Based Flow: Non-residential average flows are estimated based on an average daily flow per acre for each non-residential land use category. The following were used for average daily flow per acre for each category: Business/Commercial Corridor: 1,600 gallons Commercial/Retail: 1,400 gallons Neighborhood Services: 1,200 gallons Public/Semi Private: 1,000 gallons Heavy Industrial: 2,400 gallons Light Industrial: 2,000 gallons Parks/Open Space: 5 gallons Floodplains: 0.01 gallons A 2.0 Peaking factor was used for each non-residential land use. The combination of per capita and non-residential based flow is the basis for aggregate dry weather flow in the basins. 3) Infiltration and Inflow: Groundwater can infiltrate into the sanitary sewer system through faulty sewer pipe joints, tree roots, breaks in sewer pipes and manholes and faulty service lines. Infiltration creates an average day flow related burden on wastewater collection systems and treatment plants. Infiltration is fairly constant and not necessarily based on temporary storm events. Normal plant capacity must j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -36- Birkhoff,Hendricks&Carter,L.L.P. be designed to handle infiltration related flows. The City is in the process of completing a program to evaluate the actual flow rates of major system gravity sewers and may embark on a program to rehabilitate lines that contribute significant infiltration volumes when economically and environmentally feasible, and/or desirable. Inflow is generally related to storm events that increase groundwater and surface water flow into the sanitary system. The additional flow is generally recognized to enter through manholes, service lines, roof drains and storm drains. Inflow related flows could cause surcharged sewers, overflows at manholes and peak flows to surpass the capacity of the treatment plant. The wastewater collection system planning calculations include a combined infiltration and inflow rate of 400 gallons per acre per day (gpad) for the entire wastewater service area. This flow is not peaked. The percentage of utilized capacity was calculated for the design flow of each study year based on the build-out capacity. The utilized capacity during the Impact Fee period is the difference between the year 2018 capacity and the year 2028 capacity. Table No. 16 below summarizes the project cost and utilized cost over the impact fee period of 2018 - 2028 for each element of the wastewater system. The utilized capacity for each existing wastewater facility and collection line is presented in detail in Impact Fee Capacity Calculation Tables 17 and 18. TABLE 16 Summary of Eligible Capital Cost and Utilized Capacity Cost Utilized 20-Year or Outstanding Wastewater System Facility Capacity($)in the Project Cost CRP Period Existing Wastewater Collection $4,362,263 $1,090,566 Lines Existing WW Treatment Facilities $3,188,000 $ 478,200 (Wylie Share) Proposed WW Treatment Facilities $11,668,355 $2,91 7,089 (Wylie Share @ 69.5%Flow) Planning Expenses $11,000 $5,000 Total $19,229,618 $4,490,855 j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact fieAcip&impact feeAreports\03-report-I.docx -37- BirkhoJJ;Hendricks Carter,L.L.P- 7/18/20/9 TABLE 17 CITY OF WYLIE, TEXAS WASTEWATER COLLECTION SYSTEM IMPACT FEE STUDY EXISTING&PROPOSED CIP-WASTEWATER TREATMENT FACILITIES Facility Cost ($) Capacity Utilized(%) Capacity Utilized ($) Debt Projected Service 20 Year Debt In The In The Year Capacity Interest Service Utilizing Total 20 Yr. CRF CRF Improvements Const. (MGD) Const. Rate% Simple Interest Project Cost$ 2018 2028 Period 2018 2028 Period Wastewater Treatment Facilities NTMWD Muddy Creek WW Treatment Plant Expansion I 2012 10.00 $3,188,000 $0 $3,188,000 85.0% 100.0% 15.0% $2,709,800 $3,188,000 $478,200 NTMWD Muddy Creek WW Treatment Plant Expansion 2A(Admin)* 2020 1.0.00 $0 $0 $0 0.0% 100,0% 100.0% $0 $0 $0 NTMWD Muddy Creek WW Treatment Plant Expansion 2B(5 MGD)** 2021 15.00 $11,668,355 $0 $11,668,355 0,0% 25.0% 25.0% $0 $2,917,089 $2,917,089 Subotal:WWTP Facilities $14,856,355 $0 $14,856,355 $2,709,800 $6,105,089 $3,395,289 Treatment Facilities Total $14,856,355 $0 $14,856,355 $2,709,800 $6,105,089 $3,395,289 *-Proposed Construction Cost For WWTP Expansion 2A is assumed ineligible for Impact Fees(No Additional Capacity) **-Proposed Construction Cost For WWTP Expansion 2B is based on(69.5%as Wylie flow contribution)for a 5 MGD Expansion(and 25%of use at end of 10 year CIP from growth) J:ACLERICALAWylicf2018-t 18 W&W W-Thoroughfare-tmpna FccA Wastewater ATable 17-W WTI'Utilized Capacityxlsx -36- Birkho/f,Hendricks and Carter,L.L.P. 7/9/20 1 9 TABLE 18 CITY OF WYLIE, TEXAS WASTEWATER COLLECTION SYSTEM IMPACT FEE STUDY EXISTING CIP-WASTEWATER COLLECTION LINES (%) Utilized Capacity ($) Utilized Capacity Avg.Unit 20 Year Debt Total 20 Year Pipe Length Diameter Cost Total Capital Service @ 5% Project During During Number (Ft.) (Inches) Date of Const. ($/Ft.) Cost ($) Simple Interest Cost ($) 2018 2028 Fee Period 2018 2028 Fee Period Twin Lakes Relief Sewer - Phase I& II This Project includes 12,400 LF of new 30"and 42" Transfer Sewer commencing at the Twin Lakes Lift Station and running along Pleasant Valley Road to the Muddy Creek Regional Wastewater Treatment Plant. I * 4,200 30 2008-2010 $182.43 $766,205 $402,258 $1,168,463 70% 95% 25% 5817,924 $1,110,040 $292,116 1 * 8,200 42 5255.40 $2,094,295 $1,099,505 $3,193,800 70% 95% 25% $2,235,660 $3,034,110 $798,450 Subtotal: 12,400 $2,860,500 $1,501,763 $4,362,263 $3,053,584 $4,144,150 $1,090,566 Existing Wastewater Line-CtP Total $2,860,500 $1,501,763 $4,362,263 $3,053,584 $4,144,150 $1,090,566 *-Based on Actual Bid Price l-City Initiated and Funded 1:ACLERICALAWylieA2018-118 W&W W-Thoroughfare-Impact Fee AWastewaterATable 18-Exist Wastewater Utilized Cap.xlsx -39- Birkhoff, Hendricks&Carter,L.L.P. VIII. MAXIMUM IMPACT FEE CALCULATION —WATER & WASTEWATER SYSTEM The maximum impact fees for the water and wastewater systems are calculated separately by dividing the cost of the capital improvements or facility expansions necessitated and attributable to new development in the service area within the ten-year period by the number of living units anticipated to be added to City within the ten-year period as shown on Table 8 and Table 9. To simplify collection, we recommend the fee remain fixed throughout the next 5-year period, unless changed by Council. Water Impact Fee = Eligible Existing Utilized Cost + Eligible Proposed Utilized Cost Number of New Living Unit Equivalent over the Next 10 Years $3,050,078 + $14,607,851 = $17,657,929 2,056 2,056 Calculated Max.Water Impact Fee= $ 8,588.49 Allowable Max.Water Impact Fee: (Max Impact Fee x 50%)* = $ 4,294.24 *-Maximum allowable impact fee is 50%of the maximum calculated impact fee per Chapter 395 LGC Wastewater Impact Fee = Eligible Existing Facility Cost + Eligible Proposed Facility Cost Number of New Living Unit Equivalent over the Next 10-Years $1,573,766 -- $2,917,089 = $4,490,855 2,455 2,455 Calculated Max.Wastewater Impact Fee = $ 1,829.27 Allowable Max.Wastewater Impact Fee: (Max Impact Fee x 50%)= $ 914.63 * -Maximum allowable Impact Fee is 50%of the maximum calculated impact fee per Chapter 395 LGC. Based on the Allowable Maximum Impact Fee Calculation for Water and Wastewater, Table 19 calculates the maximum impact fee for the various sizes of water meters. j:Aclerical\wylie\2018-118 w&ww-thoroughfare-impact teeAcip&impact teeAreportsV03-report.doc -40- Birkhoff,Hendricks&Carter,L.L.P. TABLE 19 Allowable Maximum Fee per Living Unit Equivalent 50% Maximum Water Impact Fee per Living Unit Equivalent $4,294.24 50% Maximum Wastewater Impact Fee per Living Unit Equivalent $ 914.63 Living Maximum Impact Fee Meter Meter Unit Typical Land Use Type Size Equivalent Water Sewer Total Single Family 5/8" & Residential. Simple 3/4" 1.0 $4,294.24 $ 914.63 $ 5,208.87 Single Family Residential Simple 1" 1.7 $7,300.21 $ 1,554.87 $ 8,855.08 Single Family Residential. Simple 1-1/2" 3.3 $14,170.99 $ 3,018.28 $ 17,189.27 Single Family Residential. Simple 2" 5.3 $22,759.47 $ 4,847.54 $ 27,607.01 Comm./Retail Compound 2" 5.3 $22,759.47 $ 4,847.54 $ 27,607.01 Comm./Retail Turbine 2" 6.7 $28,771.41 $ 6,128.02 $ 34,899.43 Comm./Retail/Multi Family Compound 3" 10.7 $45,948.37 $ 9,786.54 $ 55,734.91 Comm./Retail/Multi Family Turbine 3" 16.0 $68,707.84 $ 14,634.08 $ 83,341.92 Comm./Retail/Multi Family Compound 4" 16.7 $71,713.81 $ 15,274.32 $ 86,988.13 Comm./Retail/Multi Family Turbine 4" 28.0 $120,238.72 $ 25,609.64 $ 145,848.36 Industrial Compound 6" 33.3 $142,998.19 $ 30,457.18 $ 173,455.37 Industrial Turbine 6" 61.3 $263,236.91 $ 56,066.82 $ 319,303.73 Industrial Compound 8" 53.3 $228,882.99 $ 48,749.78 $ 277,632.77 Industrial Turbine 8" 106.7 $458,195.41 $ 97,591.02 $ 555,786.43 Industrial Compound 10" 153.3 $658,306.99 $140,212.78 $ 798,519.77 Industrial Turbine 10" 166.7 $715,849.81 $152,468.82 $ 868,318.63 Industrial Turbine 12" 220.0 $944,732.80 $201,218.60 $ 1,145,951.40 Note:All amounts are rounded to the nearest$0.01. j:Aclerical\wylieA2018-118 w&ww-thoroughfare-impact feeAcip&impact feeAreports\03-report.doc -41 - c lir 0 WY L 1 E WATER AND WASTEWATER IMPACT FIE UPDATE 2019 - 2029 BIRKHOFF, HENDRICKS & CARTER, L.LP. PROFESSIONAL ENGINEERS 11910 GREENVILLE AVE., SUITE 600 DALLAS, TEXAS 75243 Phone (214) 361-7900; Fax (214) 461-8390 jcarter@bhcllp.com June2019 ROADWAY IMPACT FEE UPDATE 2019 - 2029 Prepared For Prepared By BIlaCHOFF, HENDRICKS & CARTER, L.L.P. 11910 GREENVILLE AVENUE, SUITE 600 DALLAS, TEXAS 75243 TEXAS FIRM 526 And LEE ENGINEERING 3030 LBJ FREEWAY, #1660 DALLAS, TEXAS 75234 TEXAS FIRM F-450 June 2019 CITY OF WYLIE THOROUGHFARE CAPITAL IMPROVEMENT PLAN ROADWAY IMPACT FEES The first step in the development impact fee process is the development of a 10-year Capital Improvement Plan (CIP). This capital improvement plan includes projects intended for construction by the City of Wylie in the next 10 years to serve existing and future development. Existing Facilities The City of Wylie arterial and major collector street system is partially developed at this time. Several roadways in developed areas are partially built to current thoroughfare plan standards. Many existing streets are two-lane asphalt roadways with open surface drainage. The existing Principal/Major Thoroughfares within the City include State Highway 78 (SH 78), FM 544, FM 1378 (Country Club Road), McMillen Road/Park Boulevard, and Parker Road. Several roadways, including SH 78 and FM 544, are under the operation and maintenance jurisdiction of the Texas Department of Transportation (TxDOT). Proposed Facilities The City of Wylie adopted an updated thoroughfare plan in 2018 that is the basis for development of the future street system. The thoroughfare system is a conventional network conforming to a hierarchical, functional classification system developed to support the forecast traffic demands of future land use. The highest classification of roadway is the Principal Thoroughfare type facility, followed by the Major Thoroughfare and Secondary Thoroughfare facilities. These roadways are generally multiple lanes — 4 lanes for Secondary or 6 lanes for Principal and Major Thoroughfares. These roadways also generally include medians that serve the function of controlling access, separating opposing traffic movements and providing an area for the storage of left turning vehicles. The lower classifications are the Collector and Downtown Collector facilities that are developed to serve the adjoining development. The character of the developments served should determine the sizes and alignments of collector roadways. City of Wylie—2019 Roadway Impact Fee Update Page 1 Capital Improvement Plan for Roadway Impact Fees The thoroughfare facilities determined for inclusion in the Capital Improvement Plan of this study are tabulated in Table lA and graphically illustrated in Figure 1. Each listed project includes a description of the planned improvements, the approximate project length, and an engineer's opinion of probable cost to the City. In addition, under existing State Statute, a municipalities' cost associated with TxDOT facilities can be financed with impact fees. All roadways included in the 2019 CIP are identified in the City of Wylie Thoroughfare Plan. Table lB shows recoupment costs for projects completed as part of the previous CIPs with debt not retired. These recoupment projects are also illustrated in Figure 1. The engineer's opinions of probable construction cost were prepared without the benefit of a detailed preliminary engineering study for each project. The costs are based on data provided by the City of Wylie and on recent roadway project construction bids. Financing costs for the projects in the thoroughfare CIP were also included in the total estimated cost and the interest rate of 5% was provided by the City of Wylie. City of Wylie—2019 Roadway Impact Fee Update Page 2 Table 1A -Thoroughfare Capital Improvement Plan City of Wylie 2019 Impact Fee Update PROJECT BOUNDARY PROJECT LENGTH TOTAL COST COST OF TOTAL PROJECT ARTERIAL NUMBER FROM TO EXISTING DESCRIPTION (ft) MO INTEREST INTEREST COST Woodbridge Pkwy. W5A FM 544 Hooper Road 4 lanes Build a 6-lane divided section 5,500 $ 2,324,530 $ 1,220,378 $ 3,544,908.00 McMillen Road W6 McCreary Rd FM 1378 4 lanes Build a 6-lane divided section 8,400 $ 10,653,020 $ 5,592,836 $ 16,245,856.00 Hensley Lane(East) W9 Hooper Rd McCreary Rd --- Build a 2-lane undivided section 5,100 $ 3,759,170 $ 1,973,564 $ 5,732,734.00 Woodbridge Pkwy. W10A Hooper Rd South City Limit --- Build 4-lanes of future 6-lanes 1,050 $ 967,560 $ 507,969 $ 1,475,529.00 Park Boulevard W11 FM 1378 Westgate Way 2 lanes Build 4-lanes of future 6-lanes 4,850 $ 5,530,040 $ 2,903,271 $ 8,433,311.00 Park Boulevard W12 - City Limit Skyview --- Build 4-lanes of future 6-lanes 1,550 $ 1,188,035 $ 623,718 $ 1,811,753,00 Park Boulevard W13 Skyview City Limit 2 lanes _ Build 4-lanes of future 6-lanes 1,300 $ 996,560 $ 523,194 $ 1,519,754.00 Sanden Boulevard W14 FM 544 SH 78 2 lanes Build a 4-lane divided section 3,700 $ 3,086,910 $ 1,620,628 $ 4,707,538.00 Ann Drive W15 Kamber Lane Franklin Lane --- Build a 2-lane undivided section 800 $ 770,000 $ 404,250 $ 1,174,250.00 Jackson Avenue W16 Brown Street Parker Road --- Build a 2-lane undivided section 850 $ 713,060 $ 374,357 $ 1,087,417.00 Birmingham Street W17 Marble Street Brown Street --- Build a 2-lane undivided section 750 $ 646,710 $ 339,523 $ 986,233.00 N.Ballard Ave. W18 SH 78 W.Brown St. 2 lanes Study to improve capacity 1,750 $ 30,000 $ 15,750 $ 45,750.00 Forrest Ross Rd W19 Railroad Tracks Park Blvd 2 lanes Build a 4-lane divided section 2,650 $ 3,047,200 $ 1,599,780 $ 4,646,980.00 Hensley Lane W20 Woodbridge Pkwy Sanden Blvd 2 lanes Build a 4-lane divided section 5,250 $ 5,166,900 $ 2,712,623 $ 7,879,523.00 Hensley Lane W21 Sanden Blvd SH 78 --- Build a 4-lane divided section&half 700 $ 2,802,800 $ 1,471,470 $ 4,274,270.00 of a grade separation Proposed Collector W22 McMillen Rd Country Club Rd --- Build a 2-lane undivided section 5,400 $ 4,145,600 $ 2,176,440 $ 6,322,040.00 Parker/Ballard W23 W.Brown Street City Limit 2 lanes Build a 4-lane divided section 5,250 $ 5,318,500 $ 2,792,213 $ 8,110,713.00 Steel Road W24 Springwell Pkwy Regency Dr --- Build a 2-lane undivided section 450 $ 415,700 $ 218,243 $ 633,943.00 Sub Total $ 51,562,295 $ 27,070,207 $ 78,632,502.00 Alanis Drive E1A SH 78 S Ballard 2 lanes Build a 4-lane undivided section 6,100 $ 1,977,955.00 $ 1,038,426.38 $ 3,016,381.38 Pleaasant Valley Rd. E7A S.Ballard Avenue South City Limit 2 lanes Realign&Build 4-lane divided 7,850 $ 9,408,375.00 $ 4,939,396.88 $ 14,347,771.88 FM 544 E8A Collins Vinson Road 2 lanes Build a 4-lane divided section 6,300 $ 15,502,670.00 $ 8,138,901.75 $ 23,641,571.75 Stone Road E12 FM 544 East City Limit 2 lanes Build a 4-lane divided section 9,400 $ 10,741,610.00 $ 5,639,345.25 $ 16,380,955.25 ... . 8, ' . ,ros,.,... ".." it""'H",tt .. <...'',l" „: 4w n .., d s..,. .. .,., :.' 2" 4 2.:.7 � r� Fod ,.,.;: � ...,E'1�A: .. �rp�k robing Lrt.. . . tiutti ty t,i�t.. 2.,��n� -.:_ . . =Build a I� ��itvrdti ticltl.. . �. 2,flOt}- ' : $,)3 �4,6 4 95` : .. .ttt1 ,, 22)f"a',.$ . :w 5'42, 71#{); County Line Road E14 FM 544 Troy Road 2 lanes Build a 4-lane divided section 5,000 $ 5,642,170.00 $ 2,962,139.25 $ 8,604,309.25 Kreymer Lane E15 SH 78 City Limit 2 lanes Build a 4-lane divided section 5,050 $ 5,691,005.00 $ 2,987,777.63 $ 8,678,782.63 Troy Road E17 Before Railroad Park Boulevard 2 lanes Build a 4-lane divided section 3,600 $ 3,103,680.00 $ 1,629,432.00 $ 4,733,112.00 Forrest Ross Road E21 SH 78 School Driveway 2 lanes Build a 4-lane divided section 1,500 $ 3,029,440.00 $ 1,590,456.00 $ 4,619,896.00 Park Boulevard E22 City Limit Spring Creek Pkwy. --- Build 4-lanes of future 6-lanes 2,700 $ 2,069,575 $ 1,086,527 $ 3,156,101.88 Park Boulevard E23 Spring Creek Pkwy. Centennial 2 lanes Build 4-lanes of future 6-lanes 850 $ 651,555 $ 342,066 $ 993,621.38 Park Boulevard E24 Centennial SH 78 4 lanes Build a 6-lane divided section 1,200 $ 920,105 $ 483,055 $ 1,403,160.13 Park Boulevard E24A Bridges - Railroad and Corps Bridges 1,000 , $ 7,371,615 $ 3,870,098, $ 11,241,712.88 Alanis Drive E25 SH 78 End of old alignment 2 lanes Build a 4-lane divided section&half 1,200 $ 3,258,800.00 $ 1,710,870 $ 4,969,670.00 of a grade separation Skyview E26 Realign to Forrest Ross Rd at Park Blvd --- Build a 2-lane undivided section 1,000 $ 849,100.00 $ 445,778 $ 1,294,877.50 Vinson Road E27 County Line Rd South City Limit 2 lanes Build a 4-lane divided section 1,400 $ 2,446,600.00 $ 1,284,465 $ 3,731,065.00 Elm Grove Rd E28 Pleasant Valley Sachse Road --- Build a 4-lane divided section 3,000 $ 5,236,000.00 $ 2,748,900 $ 7,984,900.00 Green Meadows Way E29 Beaver Creek Rd Stone Rd --- Build a 2-lane undivided section 5,100 $ 4,463,400 $ 2,343,285 $ 6,806,685.00 Sub Total $ 86,188,270 $ 45,248,842 $ 131,437,112 Grand Total: CIP PROJECT TOTALS: f $ 137,750,565 $ 72,319,049 $ 210,069,614 Costs based on 50%of EOPCC by Half Associates Paving&Drainage prorated for length out of 13,600'total with averagge 2.49%cost increase 2015 to 2019 )assd"t1r..§0%:.af: ? 11 ciunf t?p n7ori;f P t( 4:1', icdctu,f :itYQOf 2,60 fii7e# itli' v f*ge Vd: ist,itrpr * e 2.q1A tOg City of Wylie-2019 Roadway Impact Fee Update Page 3 Table 1 B - Recoupment Projects Completed with Previous CIP City of Wylie 2019 Impact Fee Update PROJECT BOUNDARY PROJECT LENGTH TOTAL COST COST OF TOTAL PROJECT ARTERIAL NUMBER FROM TO EXISTING DESCRIPTION (ft) W/O INTEREST INTEREST COST FM 1378 W1 FM 544 W Brown St 2 lanes Built a 6-lane divided section 3,500 $ 1,032,000 $ 541,800 $ 1,573,800 FM 1378 W2 W Brown St 800'north of Lakeway 2 lanes Built a 6-lane divided section 11,800 $ 10,683,815 $ 5,609,003 $ 16,292,818 W Brown Street W3 FM 1378 Ballard Ave 2 lanes Built a 4-lane divided section 9,500 $ 9,827,184 $ 5,159,272 $ 14,986,456 Hensley Lane(East) W4 Hensley Hooper --- Built a 2-lane undivided section 3,100 $ 445,000 $ 233,625 $ 678,625 Country Club Road W5 FM 544 South City Limit --- Built 4-lanes of future 6-lanes 5,500 $ 4,784,003 $ 2,511,602 $ 7,295,605 McCreary Road W7 FM 544 South City Limit --- Built a 4-lane divided section 3,350 $ 1,420,000 $ 745,500 $ 2,165,500 Springwell Pkwy W8 FM 544 700'south of Capital --- Built a 2-lane undivided section 2,600 $ 1,220,000 $ 640,500 $ 1,860,500 FM 1378 W2A N.of Lakeway S.of N.Parker Rd. 2 lanes Built a 6-lane divided section , 1,150 $ 2,717,815 $ 1,426,853 $ 4,144,668 Woodbridge Pkwy. W10 Hooper Rd. South City Limit --- Built 4-lanes of future 6-lanes 1,050 $ 875,800 $ 409,595 $ 1,285,395 Sub Total $ 33,005,617 $ 17,277,750 $ 50,283,367 Alanis Drive El SH 78 S Ballard 2 lanes Built 3-lanes of 4-lane section 6,100 $ 4,464,331 $ 2,343,774 $ 6,808,105 Alanis Drive E2 Twin Lakes _ FM 544 3 lanes Built a 4-lane divided section 2,700 $ 1,327,800 $ 697,095 $ 2,024,895 Kirby Street E3 SH 78 Birmingham 4 lanes Built a 4-lane divided section 1,400 $ 1,115,600 $ 585,690 $ 1,701,290 Stone Road E4 Birmingham S Ballard 2 lanes Built a 4-lane divided section 8,300 $ 999,000 $ 524,475 $ 1,523,475 Stone Road E5 Ballard Akin 2 lanes Built a 5-lane divided section 2,800 $ 3,530,000 $ 1,853,250 $ 5,383,250 S Ballard Avenue E6 Stone Rd Alanis Dr 2 lanes Built a 4-lane divided section 3,600 $ 4,955,000 $ 2,601,375 $ 7,556,375 S.Ballard Avenue E7 Alanis Dr Pleasant Valley Rd 2 lanes Built a 4-lane divided section 6,200 $ 6,667,500 $ 3,500,438 $ 10,167,938 FM 544 E8 JW Akin Collins Blvd 2 lanes Built a 4-lane divided section 4,700 $ 13,960,600 $ 7,329,315 $ 21,289,915 East Brown Street E9 SH 78 Stone 2 lanes Built a 4-lane divided section 11,100 $ 9,253,000 $ 4,857,825 $ 14,110,825 SH 78 El Eubaks Spring Creek Pkwy. 2 lanes Built 6-lane divided highway section 3,200 $ 4,829,000 $ 2,535,225 $ 7,364,225 Troy Road E16 City Limit East Fork 2 lanes Realign and build 4-lane divided 3,750 $ 3,783,900 $ 1,986,548 $ 5,770,448 Wylie E Drive E18 SH 78 School Driveway 2 lanes Built a 4-lane divided section 1,500 $ 1,574,400 $ 826,560 $ 2,400,960 Dominion Drive E19 Sachse Road City Limit --- Built a 2-lane undivided section 2,300 $ 1,535,600 $ 806,190 $ 2,341,790 Collins Bioulevard E20 Current End East Fork --- Built a 2-lane undivided section 5,300 $ 3,449,200 $ 1,810,830 $ 5,260,030 Sub Total $ 61,444,931 $ 32,258,590 $ 93,703,521 Grand Total: CIP PROJECT TOTALS: I $ 94,450,548 $ 49,536,340 $ 143,986,888 City of Wylie-2019 Roadway Impact Fee Update Page 4 ,1 M „,��. (; Q vh' "'Y „1 I q "� w,".mµ�YP,."my �I�'"�w���d�«, ' . „ . , ; 1 , ,, ,,, ",, , 1Parker 1 ,, ,"7,, ,,,Rd --,',, , VI, .._.,.M I '�In r „ . , , ,,, ; , , , , ,. ".t,„ , , ,,,, I J, w ,,, ,„ i W�.wm' A ., , ,,„ ' '''. ',.,-,,:.,.-.„...._ , _.,,,I ...,. ---- ,( 'a a„9 ._ ..... - ant a'' �--_ -_-.., - SERVICEr'r°" _.-.. CAPITAL '' �w.o,..,�..,""...�t' Yew Dr � . AREA �,',,' r'1 r IMPROVEMENT y N ,,-- k I I „ Y -_! _ a x .•• ,•.•µ;�'a +�• -- - ,. Skyview Dr/Park Blvd - . �:, , I i � ,... k'nxr..,:J�9"M�, d h,iM,�..a.,y.s,•.v� .,,,N;��,p,;31 W',n�:. � w, ..,,, ,.�,. , e""l ntr rya McMillen Rd „. -_ ( w�+:L4,„.� ,, "..;�,. ii• 'x'"n,;,, "�. _ -„.,... ._. .. _.-_- ..-._. _ _ .. W6 P k' .. r~ .o»r'iaf:>::a,W,s,..,,„uy.,« ,;;;1s't' :fr,,n'';i.2;ug� -.. _ 'ti+ '.�,aw,.' '�' w,, I�2 W13. Q� 7-a �� V m�"""",,„.,�, v / . ii' c DATE J 19 r ",, _ � o� U E 20w """ .�,,. ',,�.,�. I park Blvd " "" ^"r `v�a� �,� t,..,.,.�.i C\I • W 1 . I �z ii, Parker R �u 4o +"'a � �w,..._ m", a An Cr) i. C .; " , W' I 'Pe I _ i�������r ," s - W ,,; W22 5 a "m rK „r;;, z > y, ,:m?��!�^ ,: E 1 ;', -.u, ,:" " ,,,; "'n,,';'�,,';"'l " �, ,��'. N W : 4 c .o o ��;r';'" j'��"�`'1" o,l "u,`�, ^I�; 3 m W3 4 _ 6,r l - - _. _. .. ::! .__ m'" „,t,„a;,w' , ; ry7,V , ,�� ua;; - , , M _ :Co lll'' ..r^w " .. .,.;„„ m ! Bro _ I; ',`"��'8�',"1�.",1',:"��,'��,.,,�„i,��� ,.,II,II' . ' _ : F num 111,111111.11.1.11.1 No so ' ,'��.•,} � ,,. ., ��� �' �� � ,. �".o M� St to I Q �0 !i. ". �I ,�,',' "d:�'r�,����I �� �I�,� v'�`'ia���d;�o ek�''�u�'��•r�,' �5 �� r177 "."�" E�! rr- ,,."�., -- rv^,^m ''m ;°, .�,'".".�J "`„ n,,,'", �.,s � mm �� E eamc :V ,._ /fir r CT FM Y - ,. w -. - ..- -- �'�� IIII' ,. .�. '_ ... ['�' .,r;, 1''!", ir�ti./ ■ w, o,r "" ....`o` .,"µ r E °' F""�" ��:: Y I,, p;,';, �r�����}1,�,�.!; �,' , t Y / ..w" C .I... y " i M Jar r �/J -Co ,, ,,I�,,, ,,„ ':.TMw; � .. ". .,. J' mG -. w. "a. : --�„. -. �'"t` _ _ , ';,,w�u "'-'i ".. I. .`""^..,._k SDI R i I G�1 r,'��;;'„ilu�� ". "_ �.� `,j,.I",I. auu t-oo' . .f .rw�''' _ r �;, i _ o'�i� ,, ,» � °' :,rvl Ini,!` , ,� (a� ,o �t,.;,r �,r µ�����m,�����.�^ ,�.F ," .. '`. rl',, "; L�p i� ;m„ W24 G 4J ,o s� F� � . AREA ,,; '� oJtone Re I lob'", 544 E1 .. „""`, _ , ,' cu„ -' -. :. .. H,1,,'- -,-,4,,,,, "i' 'p1„ ; �'ti'V„(''� E8 E G yy wgd'" ,` v " , ,.�ry .,.,.".......... .. .:.,..�..mm�m�:,u., ��m'mmi,m���mm, ... �4N �I / � ,��" 1��,��,"„� "�' m" y id ''' o, q I 21 wa o�ii , ,��'s n � BtvY� '*'S to '; h- _ -. ate _ ..._ w•" Irl' Q 4 W2 o, Hensley �F _ a 8' - �. a 2 +a E O iw 'li �r�.`lamist©n�`= '`1 - ,..,. ��' s k'Y �� 1'Irt,,,".�' :• 1,", WEST D �fi m ''I , W F<"l,r', ' ; N,�: rc' . '"� •M ,- -r mr.,�u y r.. ` ', ;.> va,�w ''j�^,'. , , ;;d�' E1 I 1 �,�.., i - - ( - Alanis Dry'" it .,p w� , "���t 'i� 4 111 I IL r pp „,1w I Ay q � G AREA '.,.L. . ,, " I " �w» rye k G� m e,...,,ar; ) , :'''''':'''''',''''''''::'''''''' .,..._ ,", t... � ..,:(t „,,1 Iw,r In!L, r "' .�.k ll7j3 ± f %J��,,,�„ �,....,__.,_ ..�.., .,� ,_,",,.0,.. • g , _ C��/ �'' ,:;,;,," g iY 'I'�,�4. ," "r"""r.—� E1 ^'" �w '• : uld,s G L, 01.111111110 Recoupment Project ,,,r-I, '' /N ... �. y r—' �;;Y " .y,^,' Service Area Boundary Build Roadway to 6 Lanes op �a „w a r I r Railroad N �,a�a� „a' I a.,.I Lake F? Hubbard Build Roadway to 4 Lanes W o /�\ CT "°' N City Limit i, ea5a �" ��V [ ,. (' ;i' i. "XI" "..............r Build Roadwayto 2 Lanes ;, "" ;...:j'.„I' ... Q SERVICE I' A _ ETJ SER I C * > rr ' W a.=�c E 0 County Line "y,' ;1 1 Birkhoff, Hendricks&Carter, L L.P. Proposed Grade Separation t — �{ C �{ "', AREA 1 ProfessiDnai En ineers Rivers/Streams '; „„'..''" ',',',10!;1r'< ,' g Lea anci iEERme S G�c q ur„,' Potential Signal Location Lakes e� "°`{' 0 0.25 0.5 1 1.5 2 _mot �a 'e::" Miles Floodway CIP Project NumberI X1 J Source:'Esri Di ita{Globe GeoEye, Earthstar Geo ra hics CNES/Airbus DS, USD'A USGS AeroGRl'D+IGN and the GIS User Community IMPACT FEE CALCULATION I. INTRODUCTION The next step of the Development Impact Fee process is the determination of the maximum fee per service unit that can be charged by the City for new developments. The fee is calculated by dividing the costs of the capital improvements identified as necessary to serve growth forecast to occur during the 10-year planning period by the number of service units of growth forecast to occur. The specific steps, as described in following paragraphs of this section include: 1. Determination of a standard service unit; 2. Identification of service areas for the City; 3. Identification of that portion of the total capital improvements necessary to serve the projected growth over the next 10-year period; 4. Analysis of the total capacity, level of current usage, and commitment for usage of capacity of existing improvements; 5. Determination of the "standard service unit" and equivalency tables establishing the ratio of a service unit to the types of land use forecast for growth. II. SERVICE UNIT To determine the impact fee rate applied to thoroughfare facilities the standard service unit selected was "PM Peak Hour Vehicle-Miles." This service unit can be obtained by multiplying the number of trips generated by a specific land use type during the PM peak hour (vehicles) by the average trip length (miles) for that land use. The PM peak hour was chosen because it is usually considered the critical time for roadway analyses. The trip generation data were directly obtained or derived for each defined land use type from "Trip Generation Manual, 10th Edition" of the Institute of Transportation Engineers, which is the standard data reference to determine vehicle trip generation characteristics of particular land use types and densities. Trip length infoi oration for each land use specified was based on data developed by the Federal Highway Administration (FHWA) in the 2017 National Household Travel Survey. The trip length was set at a maximum of three (3) miles for any land use, as this trip length was assumed to be the maximum average distance a trip would travel on roadways within each service area in the City of Wylie. Table 2 shows the typical service units for each land use type. City of Wylie—2019 Roadway Impact Fee Update Page 6 Table 2 - Service Unit Calculation by Land Use Type City of Wylie 2019 Roadway Impact Fee Study Update PM Peak Trips' Trip Length2 Variable Vehicle-Miles (vehicles) (miles) Residential Dwelling Unit 0.99 3.0 2.97 Office 1,000 ft2 1.42 3.0 4.26 Commercial/ Retail 1,000 ft2 3.81 3.0 11.43 Industrial 1,000 ft2 0.98 3.0 2.94 Public and Institutional 1,000 ft2 1.04 3.0 3.12 Parks and Recreational Acre 13.11 3.0 39.33 1 Based on ITE Trip Generation, 10th Edition 2 Based on FHWA National Household Travel Survey, 2017 City of Wylie—2019 Roadway Impact Fee Update Page 7 SERVICE AREAS The State Statute governing the imposition of development impact fees require that collection and expenditure of fees imposed for street facilities "...is limited to an area within the corporate boundaries of the political subdivision and shall not exceed six miles." To comply with this State Law, two service areas (West and East) were established for the City of Wylie to ensure that funds are spent within six miles of where they are collected. The service areas include most of the developable land within the city limits of Wylie. Within Wylie, the growth and intensities of growth for the ultimate development of the City and that portion of the service area expected to occur during the 10-year period, 2019-2029, is forecast. The two service areas were shown in Figure 1. III. ASSUMPTIONS AND EVALUATION CRITERIA Determination of the eligible costs of capital improvements to serve the forecast growth over the 10-year period from 2019 to 2029 was based on data provided by the City of Wylie. The basic criteria and assumptions made for this study include the following: 1. Costs of existing facilities constructed to serve new development have been included, and City of Wylie staff identified projects of this type. 2. Bond interest costs are included. 3. Street facility improvements, although necessary for additional capacity by new growth, will logically serve all existing and future growth by improved safety and drainage characteristics. Therefore, the 10-year eligible costs have been proportioned as the ratio of the 10-year growth to the total number of service units determined for the build-out. Table 3 shows the portion of ultimate build-out service units that will be attributable to growth within the next 10 years and is used to pro-rate the identified costs in the service area. In order to maintain the equity of impact fee assessment, the cost for streets included in the 10-year Capital Improvement Plan will include the total cost of the street facilities, not reduced by any expected participation. Rather, construction by a developer of an arterial facility within or off-site should be treated as a credit to the impact fee assessment. City of Wylie—2019 Roadway Impact Fee Update Page 8 Table 3 - Summary of Vehicle-Mileage Distribution by Development Period City of Wylie 2019 Roadway Impact Fee Study Update Existing 2019 - 2029 Year 2029 - Ultimate Vehicle- Portion of Vehicle-Miles Portion of Vehicle-Miles Portion of Ultimate Service Miles Ultimate Added Ultimate Added Ultimate Vehicle- Area 2019 Vehicle-Miles 2019-2029 Vehicle-Miles 2029-Ultimate Vehicle-Miles Miles W 67,066 0.943 2,608 0.037 1,420 0.020 71,094 E 40,226 0.830 5,831 0.120 2,434 0.050 48,491 Total 107,292 8,439 3,854 119,585 City of Wylie—2019 Roadway Impact Fee Update Page 9 ELIGIBLE COSTS Table 4 presents a summary of the roadway capital improvement costs for the two service areas. The 10-year portion of the total costs was calculated using the data from Table 3. Costs of each of the individual street projects were accumulated, or apportioned, for the service area in which they were located. Boundaries of the service areas were located to be coincident with natural barriers, the center of existing or proposed street facilities included in the capital improvements plan or along city limit lines. Costs of these projects included only those costs that will be paid for by the City of Wylie. IV. DETERMINATION OF STANDARD SERVICE UNIT AND EQUIVALENCY The determination of growth of service units and resulting impact fee rates were then made. Table 5 presents the derivation of service unit equivalents for each of the six defined land use types. The service unit equivalents are referenced to and based on the residential land use. Table 6 presents a summary of the calculations and resulting eligible costs per service unit. Under current State law, municipalities are required to administer a detailed financial analysis to support the use of an impact fee higher than 50 percent of the eligible costs. As an alternative to performing the financial analysis, the impact fee can be set at or below 50 percent of the total eligible costs. The total eligible costs per service unit are shown in Table 6. The City will use either a detailed financial analysis to adjust for tax credits or will use 50 percent of these eligible costs. V. IMPACT FEE CALCULATION METHODOLOGY The methodology for calculating the maximum allowable impact fee for roadway facilities can be summarized in the following three steps. First, determine the cost of the roadway facilities (existing roadways eligible for recuperation of construction cost and proposed roadways) that can be attributed to new growth over the 10-year period. This calculation for Service Areas W and E are summarized on pages 14 and 15. City of Wylie—2019 Roadway Impact Fee Update Page 10 Table 4 - Summary of Capital Improvement Cost by Service Area City of Wylie 2019 Roadway Impact Fee Study Update Portion of Capacity of Cost of Thoroughfare Service Area Zone Cost of Thoroughfare Thoroughfare Attributed Attributed to Growth to Growth (2019-2029) (2019-2029) • W $128,915,869.00 0.037 $4,769,887.15 E $225,140,632.17 0.120 $27,016,875.86 Totals $354,056,501.17 $31,786,763.01 City of Wylie—2019 Roadway Impact Fee Update Page 11 Table 5 - Thoroughfare Land Use Equivalency City of Wylie 2019 Roadway Impact Fee Study Update Veh-Miles I Development Unit SU Equivalency Land Use Development Unit (1) (2) Residential Dwelling Unit 2.97 1.00 Office 1,000 ft2 4.26 1.43 Commercial / Retail 1,000 ft2 11.43 3.85 Industrial 1,000 ft2 2.94 0.99 Public and Institutional 1,000 ft2 3.12 1.05 Parks and Recreational Acre 39.33 13.24 Notes: (1) Based on data from the ITE Trip Generation Manual, 10th Edition and the FHWA National Household Travel Survey 2017(see Table 2) (2) Ratio of each land use to service unit of Residential City of Wylie—2019 Roadway Impact Fee Update Page 12 Table 6 - Impact Fee Calculation for Thoroughfare by Service Area City of Wylie 2019 Roadway Impact Fee Study Update Cost of Thoroughfare Number of New Cost Per Service Area Attributed to Growth Service Units Cost Per Service Service Unit Unit (2019-2029) (2019-2029) (Rounded) W $4,769,887.15 2,608 $1,828.94 $1,828 E $27,016,875.86 5,831 $4,633.32 $4,633 Totals $31,786,763.01 8,439 City of Wylie—2019 Roadway Impact Fee Update Page 13 Calculation for Service Area W Cost of Roadway Facilities (Tables IA and 1B - Service Area W) = $128,915,869.00 Proportion of Capacity Attributable to New Growth (Table 3 - Service Area W) = 0.037 Cost of Roadway Facilities Attributable to Growth (2019-2029 - Service Area W): $128,915,869.00 x 0.037 = $4,769,887.15 The second step is to determine the maximum calculated impact fee. The maximum calculated impact fee is the ratio of the total cost for roadway facilities attributable to growth in the next ten years (2019-2029) divided by the total growth in equivalent service units (ESU). The maximum calculated impact fee for Service Area W is: Maximum Roadway Impact Fee = Eligible Thoroughfare Cost Attributed to Growth (Table 4) Total Growth in Equivalent Service Units (Table 3) = $4,769,887.15 2,608 ESU = $1,828.94 /ESU= $1,828 /ESU (Rounded Service Area W) This amount represents the maximum calculated impact fee for roadway facilities. For the final step, the current impact fee legislation requires the City to produce a financial analysis to support a fee greater than 50 percent of the eligible costs or to reduce the maximum calculated impact fee by 50 percent. If the City chooses to use a maximum allowable impact fee of 50 percent of the maximum calculated fee the amount would be $1,828 x 50% = $914.00. Calculation for Service Area E Cost of Roadway Facilities (Tables I A and 1 B - Service Area E) = $225,140,632.17 Proportion of Capacity Attributable to New Growth (Table 3 - Service Area E) = 0.120 Cost of Roadway Facilities Attributable to Growth (2019-2029 - Service Area E): $225,140,632.17 x 0.120 = $27,016,875.86 City of Wylie—2019 Roadway Impact Fee Update Page 14 The second step is to determine the maximum calculated impact fee. The maximum calculated impact fee is the ratio of the total cost for roadway facilities attributable to growth in the next ten years (2019-2029) divided by the total growth in equivalent service units (ESU). The maximum calculated impact fee for Service Area E is: Maximum Roadway Impact Fee = Eligible Thoroughfare Cost Attributed to Growth (Table 4) Total Growth in Equivalent Service Units (Table 3) = $27,016,875.86 5,831 ESU = $4,633.32 / ESU = $4,633 / ESU (Rounded Service Area E) This amount represents the maximum calculated impact fee for roadway facilities. For the final step, the current impact fee legislation requires the City to produce a financial analysis to support a fee greater than 50 percent of the eligible costs or to reduce the maximum calculated impact fee by 50 percent. If the City chooses to use a maximum allowable impact fee of 50 percent of the maximum calculated fee the amount would be $4,633 x 50% = $2,316.50. Impact Fee Calculation Example The land use equivalency table is provided in Table 7. This table identifies the total service units generated by specific uses within each land use category. To obtain the impact fee to be charged for a particular land use, the impact fee per service unit adopted by the City and the service units per development unit generated for that particular land use from Table 7 are used. Examples for calculating the impact fee for both a single-family dwelling unit and a 50,000 ft2 shopping center (commercial / retail facility) assuming impact fees of$914.00 per service unit (Service Area W) and $2,316.50 per service unit (Service Area E) are shown on page 17. City of Wylie—2019 Roadway Impact Fee Update Page 15 Table 7 -Land Use Equivalency City of Wylie 2019 Roadway Impact Fee Study Update DEVELOPMENT ITE TRIP TRIP PASS-BY SERVICE MAX ALLOWABLE IMPACT FEE/ CATEGORY LAND USE DEVELOPMENT UNITE UNITS RATE2 LENGTHS TRAFFIC4 UNITS$ Service Area W Service Area E RESIDENTIAL Single-Family Detached Dwelling Unit 0.99 3.0 0 2.97 $2,714.58 $6,880.01 Multifamily Housing(Low-Rise) Dwelling Unit 0.56 3.0 0 1.68 $1,535.52 $3,891.72 Multifamily Housing(Mid-Rise) Dwelling Unit 0.44 3.0 0 1.32 $1,206.48 $3,057.78 Multifamily Housing(High-Rise) Dwelling Unit 0.36 3.0 0 1.08 $987.12 $2,501.82 Mobile Home Dwelling Unit 0.46 3.0 0 1.38 $1,261.32 $3,196.77 OFFICE Office Building 1,000 ft2 GFA 1.42 3.0 0 4.26 $3,893.64 $9,868.29 Medical Office 1,000 ft2 GFA 3.46 3.0 0 10.38 $9,487.32 $24,045.27 COMMERCIAL Automobile Care Center 1,000 ft2 GFA 3.11 3.0 0.28 6.72 $6,142.08 $15,566.88 Building Materials/Lumber 1,000 ft2 GFA 2.77 3.0 0 8.31 $7,595.34 $19,250.12 Drive-In Bank 1,000 ft2 GFA 20.45 2.4 0.35 31.90 $29,156.60 $73,896.35 Fast Food Restaurant 1,000 ft2 GFA 32.67 2.4 0.50 39.20 $35,828.80 $90,806.80 Free-Standing Discount Store 1,000 ft2 GFA 4.83 3.0 0.17 12.03 $10,995.42 $27,867.50 Garden Center/Nursery 1,000 ft2 GFA 6.94 3.0 0 20.82 $19,029.48 $48,229.53 Golf Course Acres 0.28 3.0 0 0.84 $767.76 $1,945.86 Hardware/Paint Store 1,000 ft2 GFA 2.68 2.8 0.26 5.55 $5,072.70 $12,856.58 Home Improvement Store 1,000 ft2 GFA 2.33 3.0 0.42 4.05 $3,701.70 $9,381.83 Hotel Rooms 0.60 3.0 0 1.80 $1,645.20 $4,169.70 Pharmacy/Drugstore 1,000 ft2 GFA 10.29 2.8 0.49 14.69 $13,426.66 $34,029.39 Super Convenience Market/Gas Station Pumps 22.96 2.4 0.76 13.22 $12,083.08 $30,624.13 Sit-Down Restaurant 1,000 ft2 GFA 9.77 3.0 0.43 16.71 $15,272.94 $38,708.72 Shopping Center 1,000 ft2 GFA 3.81 3.0 0.34 7.54 $6,891.56 $17,466.41 Supermarket 1,000 ft2 GFA 9.24 2.8 0.36 16.56 $15,135,84 $38,361.24 INDUSTRIAL Industrial 1,000 ft2 GFA 0.63 3.0 0 1.89 $1,727.46 $4,378.19 Mini-Warehouse 1,000 ft2 GFA 0.17 3.0 0 0.51 $466.14 $1,181.42 Warehouse 1,000 ft2 GFA 0.19 3.0 0 0.57 $520.98 $1,320.41 INSTITUTIONAL School Students 0.17 3.0 0 0.51 $466.14 $1,181.42 Day Care Center Students 0.79 3.0 0 2.37 $2,166.18 $5,490.11 Nursing Home 1,000 ft2 GFA 0.59 3.0 0 1.77 $1,617.78 $4,100.21 House of Worship 1,000 ft2 GFA 0.49 3.0 0 1.47 $1,343.58 $3,405.26 I GFA=Gross Floor Area 2(Vehicles);Based on ITE Trip Generation Manual, 10th Edition 3(Miles);Based on FHWA National Household Travel Survey(2017 and 2009); or a maximum of 3 miles 4 Percentage of traffic already passing by site-land use is an intermediate destination 5(Vehicle-Miles) 6 Based on 50%of maximum calculated impact fee for each service area The land uses and trip generation characteristics listed in this chart are intended as examples.The complete table of land uses and trip generation characteristics is contained in the Institute of Transportation Engineers Trip Generation Manual, Tenth Edition,which is incorporated herein by reference. City of Wylie-2019 Roadway Impact Fee Update Page 16 Service Area W— Example Calculations SINGLE-FAMILY DWELLING (Service Area W) • Vehicle-Miles per Development Unit for Single-Family Dwelling Unit (1 Dwelling Unit) x (2.97 Vehicle-Miles/Dwelling Unit) = 2.97 Vehicle-Miles • Assume 50 percent of the Maximum Calculated Roadway Impact Fee = $914.00/ Service Unit: (2.97 Vehicle-Miles) x ($914.00/Vehicle-Miles) = $ 2,714.58 50,000 ft2 SHOPPING CENTER(Service Area W) • Vehicle-Miles per Development Unit for Shopping Center (50,000 ft2) x (7.54 Vehicle-Miles / 1,000 ft2) = 377.00 Vehicle-Miles • Assume 50 percent of the Maximum Calculated Roadway Impact Fee = $914.00/ Service Unit: (377.00 Vehicle-Miles) x ($914.00 /Vehicle-Miles) = $ 344,578.00 Service Area E—Example Calculations SINGLE-FAMILY DWELLING (Service Area E) • Vehicle-Miles per Development Unit for Single-Family Dwelling Unit (1 Dwelling Unit) x (2.97 Vehicle-Miles/ Dwelling Unit) = 2.97 Vehicle-Miles • Assume 50 percent of the Maximum Calculated Roadway Impact Fee = $2,316.50 /Service Unit: (2.97 Vehicle-Miles) x ($2,316.50 /Vehicle-Miles) = $ 6,880.01 50,000 ft2 SHOPPING CENTER (Service Area E) • Vehicle-Miles per Development Unit for Shopping Center (50,000 ft2) x (7.54 Vehicle-Miles / 1,000 ft2) = 377.00 Vehicle-Miles • Assume 50 percent of the Maximum Calculated Roadway Impact Fee = $2,316.50 /Service Unit: (377.00 Vehicle-Miles) x ($2,316.50/Vehicle-Miles) = $ 873,320.50 City of Wylie—2019 Roadway Impact Fee Update Page 17 44 4 ROADWAY IMPACT FEE UPDATE 2019 - 2029 BIRKHOFF, HENDRICKS & CARTER, L.LP. 11910 GREENVILLE AVE., SUITE 600 DALLAS, TEXAS 75243 Phone (214) 361-7900; Fax(214) 461-8390 jcartergbhcllp.com And LEE ENGINEERING 3030 LBJ FREEWAY, # 1660 DALLAS, TEXAS 75234 JUNE 2019 r � Wylie City Council AGENDA REPORT Meeting Date: August 13, 2019 Item Number: E (City Secretari''s Use Only)Finance Prepared By: Glenna Hayes Account Code: 61 1-7515-58910; $60,000.00 Date Prepared: August 6, 2019 Exhibits: Subject Consider, and act upon, the approval of Job Order Contract #W2019-71-I for the Remodel of the Utility Billing Department Windows from Core Construction, Inc. in the estimated amount of $59,456.53 through a cooperative purchasing contract with National Cooperative Purchasing Alliance (NCPA), and authorizing the City Manager to execute any necessary documents. Recommendation A motion authorizing the approval of Job Order Contract#W2019-71-I for the Remodel of the Utility Billing Department Windows from Core Construction, Inc. in the estimated amount of$59,456.53 through a cooperative purchasing contract with National Cooperative Purchasing Alliance (NCPA), and authorizing the City Manager to execute any necessary documents. Discussion In reviewing the safety and health environment of the Utility Billing department, staff recommends that it is in the best interest of the City to remodel the customer window area and entry door with ballistic glass and materials. This remodel will provide a healthier environment for the clerks, reducing germs and disease, as well as reducing the possibility of a physical threat or event. The City is authorized to purchase from a cooperative purchasing program with another local government or a local cooperative organization pursuant to Chapter 791 of the Texas Government Code and Section 271 Subchapter F of the Local Government Code; and by doing so satisfies any State Law requiring local governments to seek competitive bids for items. NCPA contract#04-07/Wylie #W2019-71-I Page 1 of 1 r", a r " Wylie CityCouncil Y AGENDA REPORT Meeting Date: August 13, 2019 Item Number: 1 (City Secretary's Use Only) Department: Planning Prepared By: Jasen Haskins Account Code: Date Prepared: August 5, 2019 Exhibits: 4 Subject Hold a Public Hearing to consider,and act upon, a change of zoning from Agricultural-30(AG-30)to Single Family(SF 10/24),to allow for single family development,not to exceed 49 residential lots on 16.48 acres,located at 2605 E. Stone Road. ZC 2019-10 Recommendation Motion to approve a change of zoning from Agricultural-30 (AG-30) to Single Family (SF 10/24), to allow for single family development, not to exceed 49 residential lots on 16.48 acres, located at 2605 E. Stone Road. ZC 2019-10 Discussion Owner: CJG Development Group,LLC Applicant: CJG Development Group,LLC The applicant is requesting to rezone a 16.48-acre property located on East Stone Road from AG/30 to Single Family(SF 10/24)for a single-family development of no more than 49 residential lots and one open space lot.The property currently contains a single-family home and was annexed into the City in 2014. The property is generally bordered on the east and west by low density residential and to the north by a utility use, all outside the city limits, and a planned development residential development to the south, located within city limits. As presented,the residential development is in compliance with the design standards of the SF 10/24 zoning regulations found in the Zoning Ordinance. The minimum lot area would be 10,000 sq.ft. The minimum residential dwelling size will be 2,400 sq.ft with front and rear setbacks of 25 ft, and side setbacks of 10 ft. As presented,the concept plan provides approximately 0.395 acres of open space. The developer has agreed to provide a trail easement on the open space to connect to the existing Greyhawk trail to the south. The developer has also agreed to modify lot 30 as it is an irregular shape not generally allowed by the subdivision regulations. Lastly,the Fire department has stated that the project is not in compliance with emergency access requirements, therefore the developer will be required to provide NFPA 13D fire sprinkler systems to the residential units. Should the zoning be approved the applicant will submit a preliminary plat for consideration before any development can begin. The zoning requested is generally compatible with the Comprehensive Land Use Plan. The area is designated as Suburban, which generally supports low to medium density residential or very low density commercial in support of a neighborhood. Notification/Responses: 40 notifications were mailed;with one response returned in opposition and none in favor of the request at the time of posting. Page 1 of 1 Page 2 of 2 P&Z Commission consideration The Commission voted 6-0 to recommend approval. Locator Map onvewav L . V\ \ IF F H 4p.., . I . ID rl V 0 No-. N. . N.- ,, ' .fr .. ) .4. 41 +. r.----„,- _• TO LJ C ttt S TO N F R D < 1 5 e,-- , R3 R AY HUBBARD \NAB I t .Q, A ZC 2019-10 ,,, , ,,,,. r ..,- '''' 73R,,C3t9 : Subject Property ia , „ ,...... 0 155 310 620 930 1,240 1,550 - ' ' 1 -,. -6 Iv N Feet ,‘,,,,'„',, ", ‘, '' ',',,I,„, ,,,,„1",„'',„,,,,,,,,' ,,,, , , ,,,•• ',','•',''', ''' ',,','4,0'4, , ,, ,,'',,,,,,', , ' ,,, ,,,,,,4,‘,„,',''' ,,,, , , • ,,,),v),,,,,)' ,,,,,,,,,';',',4 ,,,,,„),,P,', ' ' " 0 0 .0/OMNI%,, , • UJ "t1 00 LC:I CT) U.) M 0 (./1 -1 . I I (XI X — e , I I OC) 1-1 > Z I--s (/) > , , „,,, ,, 0, , , ,,, , , % , ,', „„, , , , , ..;: rn r) ,,, ,, , ,„,, , ,„‘„, 0„,,,,, , _ _ „,,,,,,, , , 1 , , , ‘,,, , , % , , , ° I.. , , „ , ' „,, ,',, ,,W,,,„,„'',,,,',,;,,,,,‘,,,,,4,,,'‘,',‘„,,',%,„',',„,%,,'‘,'‘•,,,'‘', '' , ‘,','• ,,, , ••' " ' 4 '\,'4,,„',,,‘ ,'„„,'',„‘„",,',,',,,••,'',•‘,',,„,,,,', ' '„„,„,4,,,,,‘'',,',',,,,•,„,,,„,„,‘,,,,„',,,r,,,',,,,',,',,',,‘'w,,,,',,„,„' ,,,,,,,,,',„,,„,,',,„' , \,t' „,', „,N('?..1,s)),,,:,,‘,,,N-C‘2?„),,,,,,,,,,,t.,,-1,-,),.1,,.,.‘0(iCini•j.s'' ,' 1 %,,,,,,,,,,„%:‘, ,,,,:;:•T4)„.61-04 1s12 (:s ril 7tr+-- - 1 N rn s rl - r - c 0 VPMO) ',,) )) ‘,,'9),,,), , ".) 01 '.) ‘' % , •••■=000 ) , l I , „, I „,, 0 -II , ._,....„.„,,,„ (PI _ „%,___ ,_ ., , , __,..,' o o o o -0 u) , , "-I ___, co , (J1 u) u) (i) -h ---,.„ .....„. CI) C) NI ril NI • / '',Iv' /''‘, „','' "\''‘‘' , ' ,, , e------. . _ _ , , , ,,, ' " / „ , , ' / / %,, ,,, • N,„',' „ , ' ' „,, / J ;"' iy, , , 1 , , • -.., / --.... , (''' / , GI 0 --' 00 ' a) -P• co I D -s I-A , --- __, a) 0 Cif cri N) 0 N.) a) _.-- 0 _,.. ---.1 N.) , , \-.--------- u) u) a) 0 • I co -+, I`•1 0 _., , u) , / / 0) I // 0 0 NIV _ _ (0 _ 5v n \) I . , u) CA 0CrvA " Ncc-o-r/ Cr\-)10) co / -h -h --h --h , 1\) 0 --" I 0 C) I I • ..4• -h „ - -,-, 1. -F• / If,- (0 (0 • .:\I D .,_ ..._ ....._ c' "0 -\• 1 - - I w (/) _ -h / >1 .10 -a I 1., I c_-) o _ c) o o o) ....., Ill (•,4 NJ 4=,•• tv -I' / 0 C.) o 0 u) cn co :13% Ni (.1 I -h -h h (0 \\I Q) I I - - --, -....4. , 1 w I -•§4 '0 (i) / IV `,4 hsl o _ IV )Z) 0 o 1. I Li I o co c) z•-,1 I • ucc; ON) 0 (C)I 0 ° -I... -I, Cl) (14 - - 5. CDI 1\3 r11 .y I (+4 /I u) l\) * — —.0 -A -h ,I = 0 0 0 00 I 0 0 0CA cn 0 00 I , _ _ I Z 5....1. -+, co M co I 0 --+, -‹ 0 I f -A "-- (13 Cy Z 00%, -,-> I" 0 - -h, 0 I 0 0 0 / 0 0 C.1 I I U)I u):-h - ..- C•I 1\) I I 00 0) CO OD CA , I _ _ I 0 CA 0 co 0 0 I 0 a) 0 0 -P. 0 0 CA -÷, m ) ' / - - 0 01 , u) 0 a) 2 / I co co LI 7^ = cm / N ' I I Z / _ ....._ I _ _ _ 0 _ I rn 0 1 1 0 0 c) c:J , 0 cr, 0 4, 0 (A i , 0 0 im 0 cyi •u) rn co 0) 0) -h -h I -h 2 / I ."..'1- - Pa-- -,- I .< /I I 0 0 0 0 0 0 ..p.„ N I 0 44 ' co I co 0 - _ - - I / , 00 I 0 0 0 0 / I 0 (..,,,I I 0 0 -1S. 0 0 CA 0 0 °° - - co 0 CA u) co I -h — - - :-h -- - . -h I / TAWAKONI (.1 ,‘, , DRIVE i _ _ 0 - 0 ....„ _ _ _ I 0 I -0 0 0 H o -0- O (-A 0 0 co co o I\) I u) I u) 1\) I I I I _ ___ I '‘ .....„ , , 0) CTI 0 -' 1 I 82 CD 0) - -h u40 co -+, _ i ___ I I — i . I - - , ,, , - - .......!.6 ‘,...0 MOP flAINNININIIIIIIIIIMMIIIIII OM. MOM / ,„ , —„.. -- -- -- -- .,..— E. STONE ROAD ' ___ _ • • • 4,".1'it'li,:• ' •'; l'fil!'i' • 11.•:!.;•1;1 f 1 0 \ 8 • . . • ,..,, •,..,,....1,,,,,f1,„ .•••;,•i„, , ••..•,,, , 1,.„till•, ,.. ,,,lit,,,;,,,,:••,13 u.) 8 , Engineer: / . . , ., , ...... . , , .„ . . . . .,. . .., , ... . , . . . . . . ,. . . .. .. _ .. .. . , . _ X . ...- NM. . • „ ,,. ONCEPT8mom, , . , (i) (") =mow INININIOIS 4111111•••11. 111.11111.111.111. f/MMIlik :i'•',rn.n.,..::rt.'i **1 0 .1.111111ile , 'I ' ' III 0 1111111111111.110.1.11W 1111111111 111111111.111111.11.1.11114. ..,'I'.t1'..':.:',': e.".\.: I. , q ( '....01/ % '% , ' A ' '' V'' ,' , ' '','' es •. .................. .., A, i Z .. ...i. 0 .::t•'.,,. t...H.44,•:',.'"1 eSt DESIGN, L.P. = t.i.'•,.:::'..,,.,,,!,•.:,.• . . • . _ __.../ t,,tt.•.:1:• !„::, , , , .. , . . . . ,. . • tt . — — ..n.t...,,,,';•••,;.1,I,''',,,,n.'...••••'..,•1,•••,,...:Iniit.:+in.•••,.,.•;t:',!•:;.n,.1n,t1.,.• . ,, , K . o . , •••••••yo IONIONNO. • • • so • CONSTRUCTION' SERVICES . • ' ,. , ' ' • •P A • „ . . ,:::, ..„ c= _ , , ::•.,..:Ti., •ii, . . . .. _. . . •, .. ,• • •• co 0 c) 1 WINDCO S IRCL E.. SUITE zoo, WYLIE, Tx • • V - , ,. • ,..4 if,ii, ; ,it. • 07Z.94 I.5400 www,,,EcoLfa.COM rAK: 97Z.94I oa4c31 . ,,,,, •:ittzl, V (,A .--1-1 • „:..,2. _ 1„, -•,••• • •::+1IT11,:" ;•,',.:::1•• „'„....p. CD , • , . . - • • , a9) , ••• ,,••,,• . ',111nHlit., 1,i„,l• • ,• _....s. ' . Y . ,• t„-• ;„„„••,„ • .,„,„,.:1„,, .• . • .+,11q,.11: i, • . . . . . it.„!•:•.!;i,. • " . , . , _ , , . .• . . , ,• „ • 1,„•, • • .. , ,. . ., . .. . Notification Map .. - -. - ----.... .........„ ,,.. .......„. i .,..,., ....... ....0 ... i .,.. ..... .... ...,.... e ....„....i ..... .., , ..„,„... r ... , o .... (-•0,;:i io2 **22 ... 1 ••• . ; I ".• . ,•.• , % i ••• 2 ; '•••• , v ot i •••• . I ••••• ' ••••• 2 i i ** • 1,••. v , ' ; •••• , 2 i ) i • i * • i i • • i i . 44.• i i • . i 2 • '• • *It' i f;•••••:;"—;;;;;";;; .$•••• ., ,.. • i i 11 '*4'.. 1 i S, 1 / I % ........_ WHITNEY LN , — ./. --.---”" " --- “— —"--- rn--'—' ."---.--—,—........--......o.,--..-- “,...—.—..1-2i... ..*- ; 1,(:) rif' i 1 C4,7 _.Y. 0 B()B S A N D U N L N .5 1 N — ::,--;- [ 1 A , 1 ZC 2019-10 f.'s? i------r—, r7 ,...,.........,..u. 1 51°1, 9 II' 1 i 200 Foot Notifcation Buffer 44s Subject Property ......... y 0 95 190 380 570 760 950 ,,.), II:), . N Feet PUBLIC COMNIENT FORM f Plcure type or use Huck ink) Dcpartinern.or Planning 3100 Country Club Road 100 Tevr7; I tun FOR the rctruc.Nr.:,1 xplautct..1 ihc tit1;xci1c,1 public notic,2 Cor Ctc #2019-Ift I I AGAINST 11C l'eLl 1.1C I zuninc ;II': 11 i 110(1 lUl 111C Llitachc(1 public notice Cor Zluinc Case#2019-10. Ircc io conto,1 Plannint. DLTrdruncnt La 1)72.5 lro) 21) ith cnric.,tion,or I,.octuion Tintc or Zoning Coutnik,ion rnectirLI: JUI\ I h. 2019. 0:01) IuuicaI COI111)1L" . :100 Club Blinding Iii)), 111 'Hill,' a City Council tuccting: At,,,r,t 13, 2ii1L;'. 0111) 11111 j1LH11,.`i1):11 ,10() CI,LIIILL1 C1111, BlindlilL 1(0). W) k/reirlir Park eariners 1 (fir t Addr, s: Ed., _Salk <PO fidi LSO Tx 7So I 7. .0c7. /43 art ihe eveloptrs oTrAvic‘f,flik Park 71?) 71/24 k/tA 7L,hrf ion"Psed dcrtiopri6h1 lye wite bid i'ha land toss t .saltor 11vth epr'tr xnel Ott.141 Aol AWild Pe-t teZAC4 fit' ji+VIC ca.11) itif • Are Wald A4Ve fOar /Y44re7 trot (NtId hAtit Wylie City Council AGENDA REPORT Meeting Date: August 13, 2019 Item Number: 2 (City Secretary's Use Only) Department: Finance - - Prepared By: Finance Account Code: Resolution, Property Tax Date Prepared: August 1, 2019 Exhibits: Distribution Calculation Subject Consider, and act upon, Resolution No. 2019-19(R) of the City Council of the City of Wylie, Texas, accepting the proposed property tax rate for fiscal year 2019-2020, accepting the calculation of the effective tax rate, establishing dates for public hearings on the proposed property tax rate, and providing for the publication as provided by the Texas Local Government Code, Section 140.010. Recommendation Motion approving Resolution No. 2019-19(R) of the City Council of the City of Wylie, Texas, accepting the proposed property tax rate for fiscal year 2019-2020, accepting the calculation of the effective tax rate, establishing dates for public hearing on the proposed property tax rate, and providing for the publication as provided by the Texas Local Government Code, Section 140.010. Discussion The City is required by law to follow certain meeting and notice (publication) guidelines identified in the "Truth in Taxation" guide. In accordance with the "Truth in Taxation" laws of the State of Texas, the effective and rollback tax rates and other information must be published and two public hearings must be held if an entity's proposed tax rate exceeds the lower of either the effective tax rate or the rollback tax rate. This year's effective tax rate is $0.688454 and the rollback tax rate is $0.723543. The proposed 2019-20 budget is based on a tax rate of$0.688454 per $100 valuation. Any change in the proposed tax rate will require revision of the proposed budget. The City Council is required to vote on the proposed tax rate and publish required information at least seven (7) days prior to the scheduled public hearing on August 27, 2019. If council approves anything over the $0.688454 tax rate, a second public hearing will have to be scheduled for September 3, 2019. This decision must be made tonight so that publication deadlines can be met. The Council may not adopt the tax rate at these hearings. At each hearing, it must announce the date, time and place of the meeting at which it will adopt the tax rate. This meeting must take place no less than three (3) days and no more than fourteen(14) days after the second public hearing or at a regular council meeting if adopting the effective tax rate or lower. The City Council's vote on the tax rate is scheduled for September 10, 2019, which is a regular council meeting. The official detailed effective tax rate calculation is available in the office of the Collin County Tax Assessor/Collector (Kenneth L. Maun) in McKinney. A copy is also maintained in the Finance Department for the Council and public to view. Page 1 of 1 RESOLUTION NO. 2019-19(R) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS, ACCEPTING THE PROPOSED PROPERTY TAX RATE FOR FISCAL YEAR 2019-2020; ACCEPTING THE CALCULATION OF THE EFFECTIVE TAX RATE; AND PROVIDING FOR THE PUBLICATION AS PROVIDED BY THE TEXAS LOCAL GOVERNMENT CODE, SECTION 140.010. WHEREAS,the City of Wylie has received the calculated effective tax rate as presented by the Collin County Tax Assessor/Collector's Office; and WHEREAS, the Texas Local Government Code, as amended by adding Section 140.010, provides the specific procedures in which to consider the proposed tax rate; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WYLIE, TEXAS: SECTION 1. The City Council of the City of Wylie, Texas, does hereby accept the rate of $0.688454 per$100 valuation as the proposed property tax rate for fiscal year 2019-2020. SECTION 2. The City Council of the City of Wylie, Texas, met in a public meeting on August 13, 2019, and accepted this resolution with a majority vote. DULY PASSED AND APPROVED by the City Council of the City of Wylie, Texas, on this the 13th day of August 2019. Eric Hogue, Mayor ATTEST: Stephanie Storm, City Secretary Resolution No. 2019-19(R) Proposed Property Tax Rate FY 2019-20 PROPERTY TAX DISTRIBUTION CALCULATIONS EFFECTIVE TAX RATE FY2019-20 FY2018-19 Tax Year 2019 Tax Year 2018 TAX ROLL: Assessed Valuation (100%) $ 4,676,914,418 $ 4,259,503,789 Rate per $100 0.688454 0.725848 Tax Levy Freeze Adjusted 32,198,404 30,917,523 Tax Levy- Frozen (Disabled/Over 65)* 2,110,144 1,880,427 Total Tax Levy 34,308,548 32,797,950 Percent of Collection 100% 100% Estimated Current Tax Collections $ 34,308,548 $ 32,797,950 SUMMARY OF TAX COLLECTIONS: Current Tax $ 32,198,404 $ 30,917,523 Revenue From Tax Freeze Property 2,110,144 1,880,427 Delinquent Tax 180,000 180,000 Penalty and Interest TOTAL TAX COLLECTIONS $ 34,488,548 $ 32,977,950 FY2019-20 FY2019-20 PERCENT FY2019-20 FY2018-19 TAX RATE OF TOTAL AMOUNT AMOUNT GENERAL FUND: Current Tax $ 0.516225 $ 24,143,366 $ 22,924,887 Revenue From Tax Freeze Property 1,581,975 1,391,516 Delinquent Tax 120,000 120,000 Penalty and Interest Total General Fund $ 0.516225 74.98% $ 25,845,341 $ 24,436,403 DEBT SERVICE FUND: Current Tax $ 0.172229 $ 8,055,038 $ 7,992,636 Revenue From Tax Freeze Property 528,169 488,911 Delinquent Tax 60,000 60,000 Penalty and Interest Total Debt Service $ 0.172229 25.02% $ 8,643,207 $ 8,541,547 DISTRIBUTION $ 0.688454 100.00% $ 34,488,548 $ 32,977,950 ,wrq°r: Wylie City Council AGENDA REPORT Meeting Date: August 13, 2019 Item Number: 3 (City Secretary's Use Only) Department: Finance 100-5231-58910 Prepared By: Finance Account Code: 100-5181-59430 Date Prepared: August 1, 2019 Exhibits: 2 Subject Consider, and act upon, Ordinance No. 2019-20 amending Ordinance No. 2018-24 (2018-2019 Budget) for proposed budget amendments for fiscal year 2018-2019; providing for repealing, savings and severability clauses; and providing an effective date of this ordinance. Recommendation Motion to approve Ordinance No. 2019-20 amending Ordinance No. 2018-24 (2018-2019 Budget) for proposed budget amendments for fiscal year 2018-2019; providing for repealing, savings and severability clauses; and providing an effective date of this ordinance. Discussion Staff is recommending a transfer of$1,300,000 from the General Fund to a new Capital Fund (461) for Fire Station #2. The $1.3 million is included in the Fire Department's 2018-2019 budget for remodel of Fire Station #2. This money was from General Fund Balance in the 2018-2019 budget. Council discussed the Fire Station#2 remodel and decided to forgo the remodel and pursue building Fire Station #2 on the land adjacent to the Municipal Complex. The amendment is to move the money from the Fire Department's budget into Combined Services "Transfer to Capital Fund" account in the General Fund. The $1.3 million will then be moved to the Capital Fund 461 fund balance for the future construction of Fire Station#2. Page 1 of 1 ORDINANCE NO. 2019-20 AN ORDINANCE OF THE CITY OF WYLIE, TEXAS, AMENDING ORDINANCE NO. 2018-24, WHICH ESTABLISHED THE BUDGET FOR FISCAL YEAR 2018-2019; REPEALING ALL CONFLICTING ORDINANCES; PROVIDING FOR A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Council heretofore adopted Ordinance No. 2018-24 setting forth the Budget for Fiscal Year 2018-2019 beginning October 1, 2018, and ending September 30, 2019; and, WHEREAS, the City Departments and Divisions routinely review their budget appropriations to determine if any changes are necessary; and WHEREAS, based upon said review the City staff now recommends that certain amendments to the Budget be considered by the City Council; see Exhibit A; and, WHEREAS,the City Council has the authority to make amendments to the City Budget under Article VII, Section 4 of the City Charter, as well as State law; and, WHEREAS,the City Council has determined that the proposed amendments to the FY 2018- 2019 Budget; see Exhibit A, with the revenues and expenditures therein contained, is in the best interest of the City; and therefore, desires to adopt the same by formal action. NOW, THEREFORE, BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF WYLIE, TEXAS: SECTION I: The proposed amendments to the FY 2018-2019 Budget of the City of Wylie; Exhibit A, as heretofore adopted by Ordinance No. 2018-24, are, completely adopted and approved as amendments to the said FY 2018-2019 Budget. SECTION II: All portions of the existing FY 2018-2019 Budget and Ordinance No. 2018- 24, except as specifically herein amended, shall remain in full force and effect, and not be otherwise affected by the adoption of the amendatory ordinance. SECTION III: Should any paragraph, sentence, sub-division, clause,phrase or section of this ordinance be adjudged or held to be unconstitutional, illegal or invalid, the same shall not affect the validity of this ordinance as a whole or any part or provision thereof, other than the part or parts as declared to be invalid, illegal, or unconstitutional. SECTION IV: This ordinance shall be in full force and effect from and after its adoption by the City Council and publication of its caption as the law and the City Charter provide in such cases. Ordinance No. 2019-20—City Council Budget Amendment FY 2018-2019 SECTION V: That all other ordinances and code provisions in conflict herewith are hereby repealed to the extent of any such conflict or inconsistency and all other provisions of the Wylie City Code not in conflict herewith shall remain in full force and effect. SECTION VI: The repeal of any ordinance, or parts thereof, by the enactment of the Ordinance, shall not be construed as abandoning any action now pending under or by virtue of such ordinance; nor shall it have the effect of discontinuing, abating, modifying or altering any penalty accruing or to accrue, nor as affecting any rights of the municipality under any section or provision of any ordinances at the time of passage of this ordinance. DULY PASSED AND APPROVED by the City Council of the City of Wylie, Texas,this 13th day of August, 2019. Eric Hogue, Mayor ATTEST: Stephanie Storm, City Secretary Ordinance No. 2019-20—City Council Budget Amendment FY 2018-2019 Budget Amendment Exhibit A Transfer of Fire Station Remodel Funds Fund Department Account Number Debit Credit 100 5231 58910 1,300,000.00 100 5181 59430 1,300,000.00 ,wrq°r: Wylie City Council AGENDA REPORT Meeting Date: August 13, 2019 Item Number: 1 Department: City Secretary (City Secretary's Use Only) Prepared By: Stephanie Storm Account Code: Date Prepared: June 19, 2019 Exhibits: NTMWD Letter Subject Consider, and act upon, the appointment of a board member to the North Texas Municipal Water District (NTMWD) Board to fill an expired term of June 1, 2019 to May 31, 2021. Recommendation A motion to appoint to the North Texas Municipal Water District(NTMWD) Board of Directors for a term to begin June 1, 2019 and end May 31, 2021. Discussion The Board of Directors of the North Texas Municipal Water District(NTMWD) is a policy making body similar in nature to the City Council. The Board is responsible to both the State of Texas and to the member Cities for assuring that NTMWD operations occur in accordance with state and federal law, in alignment with NTMWD policy, and in the best interests of the Cities receiving services. In accordance with the statute creating the District (Article 8280-141), the qualifications of a director include the following: "No person shall be appointed a Director unless he resides in and owns taxable property in the city from which he is appointed. No member of a governing body of a city, and no employee of a city, shall be appointed as a Director." Under other state law, no other public official that receives compensation could be appointed. NTMWD's existing Board (13-member cities) is comprised of individuals who have worked to represent their communities in other capacities and who have a solid understanding of municipal concerns to share with other Directors. Historically, Directors have dedicated from 10 to 30 years of service to the Board, thereby gaining experience and contributing the necessary leadership. This provides the maximum benefit in order to assure the city's needs are met in the most effective manner. All NTMWD programs provide service based on cost to serve, with all cities provided equal treatment. Therefore, NTMWD policy established by the Board of Directors affects cost, performance, and quality of service. The City of Wylie has two board members on the NTMWD Board; Mr. Marvin Fuller whose term expires May 31, 2020 and Mr. Bob Thurmond,Jr. whose term expired May 31, 2019,but resigned his position as of January 28, 2019. NTMWD is requesting that by majority vote, the Wylie City Council appoint a Director to serve a term from June 1, 2019 to May 31, 2021. Page 1 of 1 , .. , (4 T T X AS N ICI AIL AT DIS ar IC Reginual Sen Ice Through Um March 4, 2019 Mrs. Mindy Manson, City Manager City of Wylie 300 Country Club Road Wylie, Texas 75098 RE: NTMWD BOARD MEMBER APPOINTMENT Dear Mrs. Manson: The current term of office for some of the Directors of the North Texas Municipal Water District(NTMWD) Board will end in May. Please accept this as is your official notification that term of the position vacated by Mr. Robert Thurmond and not yet filled will expire on May 31, 2019. The City Council should appoint a new Director to serve the term from June 1, 2019, to May 31, 2021 (as well as appoint a new Director to fill the current remaining term through May 31, 2019). In accordance with the statute creating the District(Article 8280-141),the qualifications of a Director include the following: "No person shall be appointed a Director unless he resides in and owns taxable property in the city from which he is appointed. No member of a governing body of a city, and no employee of a city, shall be appointed as a Director." Under other state law, no other public official that receives compensation could be appointed. A list of roles and responsibilities of an NTMWD Board member is enclosed for reference. Please notify my office in writing once the City Council has appointed a Director for the new term. Should you have any questions or need additional information, please do not hesitate to contact my office. Sincerely, i - . .... AO THOMAS W. K LA Executive Director TWK/mcf Enclosure cc: s. Stephanie Storm, City Secretary ‘i1,15 E QINatadra Sara-Tit . PO Uair :' .a98 . W,,aata, Ica a, N1110i 2-408 , "Ifclepho,w a97?_)) 44, 40,5 ,r I'ar, 197?. "..").5. 6440 NTMWO.COM T . : • + - ' •F I - T• - ROLES A I - SPO SI=ILITIES The North Texas Municipal Water District (NTMWD) Board of Directors serves as the governing body of NTMWD. The Board of Directors guides the NTMWD towards a sustainable future by adopting sound governance and financial management policies and ensuring adequate resources to meet the region's needs. The Board has a responsibility to provide guidance to management and staff and ensure operations run smoothly and in accordance with the law. Some specific responsibilities of the Board of Directors include: • Establish and support the NTMWD mission and purpose • Select and evaluate the Executive Director/General Manager • Set policies and ensure effective planning • Ensure adequate financial resources • Monitor and strengthen essential programs and services • Protect assets and provide proper financial oversight • Ensure legal and ethical integrity • Enhance the organization's public standing The Board of Directors meets monthly — generally on the 4th Thursday of each month. This schedule may be adjusted due to holidays. The Board of Directors also meets in Special Workshops semi-annually for long-term planning as well as on an as-needed basis for other purposes. Each Board member serves on at least two standing Committees, such as: • Water • Wastewater • Solid Waste • Finance/Audit • Personnel • Insurance Directors may also serve on the Legislative Committee, Special Purposes Committees as needed, and the Chairman of each Committee serves on the Policy Committee.